Excavation Backfill Compaction Anti termite PCC Reinforcement Foundation concrete Slab on grade
Columns Beams Slabs Core wall Shear wall
The Project Engineer is responsible to carry out the work as per the Method Statement,
Specification and Approved Drawings.
The Project Engineer shall ensure that the resources are available to carry out the works
as scheduled.
Ensure that MSRA trained to site supervisors upon approval and prior to work
executions, in additional to periodic training for the MSRA.
Ensure reporting of any new hazard/incidents/ unplanned events to EHS team to review
of the MSRA.
Ensure that all workforces are fully aware about the emergency response and
evacuation procedure.
Ensure full compliance with EHS recommendations during ejection of the activity.
QA/QC Engineer/Inspector:
Ensure the work is carried out as per the Method Statement, Specification and
Approved Drawings.
Ensure that the resources are available to carry out the works as scheduled.
Ensure that MSRA trained to site supervisors upon approval and prior to work
executions, in additional to periodic training for the MSRA.
Ensure reporting of any new hazard/incidents/ unplanned events to EHS team to review
of the MSRA.
Ensure the availability of competent employees to complete the task
Ensure the availability of adequate welfare facilities at site
Ensure the availability of required PPE at site
Delivered paint material shall be checked for the following things: Expiry
date, original labeled containers, and manufacturer’s name, type of
paint, brand name, color designation and instruction for mixing.
Material shall be stored in a cool, well ventilated and dry place, away
from direct sunlight.
Paint material shall be kept away from heat sources.
All materials must be returned to designated storage area after working hours
and properly secured.