JOB TITLE / AIM: Piling & Concreting Works for the construction of Foundations/Building

JSA DATE: 07-06-2014 JSA NO./ REVISION:


SUPERVISOR/ JSA LEADER: Zakir Ali SCRIBE: Hafeez Ullah Khan
PARTICIPANTS : M.Ramzan Asif Ali, Yar Muhammad, Muhammad Asif
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1. Mobilization of People, Equipment & Materials
2. Piling with Piling Machine
3. Lowering of Steel Cage structure & Concreting
4. Night Hours working

Part 3: Equipments / Tools to be used: Piling Machine & Hand Tools


Part 4: Contingency Plans. Standard PPE’s: First aid kit must be present at work site and the HSE personnel will be the first response in case of
emergency, ERPs & Emergency contact numbers to be in placed at job location

Part 5:JSA Review Process. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? In
case of any new hazard indentified by any of the working team member during the job, JSA review process should be carried on.
JSA No: JOB TITLE: Piling & Concreting Works for the construction of Foundations/Building
Step# Describe Job Step Potential Hazards Hazard Controls
1 Mobilization of equipment &  Involvement of unskilled personnel  Trained & skilled staff to be authorized for
Materials  Piling machine hit with working
plant/equipment & structures  Ensure JSA briefing & Daily TBT to all
workforce prior to commence activity
 Use of authorized & designated routes
 Unauthorised/ uninspected  Only inspected Equipments/Tools must be
equipment/tools at site allowed at work site
 Use right tools for right job
 Personnel injury / property damage  Ensure safe transportation of
equipment/materials at work site
 Avoid throwing of materials
 All of materials to be secured while its
transportation to work site
 Overhead structures/pipe racks  Ensure safe distance of piling machine
from overhead structures/pipe racks
 Water sprinkling to be carried out on
regular biases to avoid dust
 Slip, Trip & fall  Take care of overhead structure/pipe racks
 Keep access/walk ways always clear from
any obstruction
 Inclement weather condition  Stop work in case of any inclement
weather conditions (Rain, storm, fog etc.)
 Restrict movement of heavy
vehicles/equipments in rain/fog
JSA No: JOB TITLE: Piling & Concreting Works for the construction of Foundations/Building
Step# Describe Job Step Potential Hazards Hazard Controls
2 Piling with Piling Machine  Uncertified piling Machine & Operator,  Pile machine & its operator should be
 Personnel hit by movement of piling certified
machine,  Banks man should be available at site to
 Working in live areas control the movement of heavy
vehicles/equipments
 Keep away all unauthorized people during
movement of heavy vehicle/equipments
 Be careful of nearby live areas
 Ensure Close HSE monitoring
/supervision
 Sling broken, load drop  Ensure proper & inspected accessories
being used for drilling
 Ensure that drilling bit is properly fixed
with locking pins
 Keep away during drilling operation
 working area should properly barricaded
 Slip, Trip & fall  Ensure proper stacking of all materials at
site
 Keep access/walk ways always clear from
any obstruction
 Ensure proper housekeeping of workplace
all the time
 Inclement weather condition  Stop work in case of any inclement
weather conditions (Rain, storm, fog etc.)
 Restrict movement of heavy
vehicles/equipments in rain/fog
JSA No: JOB TITLE: Piling & Concreting Works for the construction of Foundations/Building
Step# Describe Job Step Potential Hazards Hazard Controls
 Fire & explosion  Ensure availability of inspected fire
extinguishers at site
 Conduct proper gas test prior to start
job
 Flame arrestor to be installed in all
vehicles/equipments
3 Lowering of Steel Cage structure &  Personnel hand injury while handling  Ensure Involvement of skilled labour
Concreting of piles with steel  Ensure use of proper PPE’s
 People under suspended load  Deliver TBT before commencing work
 Unbalancing of load  Ensure use of inspected & colour coded
 Miscommunication between operator hand tools & rigging accessories
& signal man  Area should be properly barricaded during
lifting operations
 Improper signalling during lowering of  Ensure proper stacking of all materials at
steel cage structure work site
 Maintain good housekeeping all the time
 Inappropriate PPE’s/Tools during  Use of appropriate PPE’s during concrete
concrete work  Ensure use of inspected tools for the right
job
 Skin contact with concrete or other  Availability of fresh water at site
chemicals
 First aid box should be in place at site
4 Working at night shift hours  Poor visibility at night hours  Ensure proper lighting arrangement for
late night working hours
 Vehicles/equipments hit with people,  Careful movement of vehicles/equipments
equipment or structure in night hours
 Place refection tapes at hard barriers,
structures
 Banks men should worn high visibility
reflection vests
JSA No: JOB TITLE: Piling & Concreting Works for the construction of Foundations/Building
Step# Describe Job Step Potential Hazards Hazard Controls
 Slip , trip & fall  No working should be allowed in poor
lighting conditions
 Ensure proper housekeeping to avoid
tripping

Prepared By: Hafeez Ullah Khan Approved By: _____________________