Sunteți pe pagina 1din 4

FORttI il

See Rute (6)

.........PANCHAYAT

FORM OF TENDER

Date of issue.

Price

cl-M - I_-1ole8
FORM OF TENDEB
Name of work
To
TI-IE SECBETARY
panchayat
^5n
execute the
work enumerated in the schedure accompanyins
,"".;iT:,,?;Iij;oJ"l::t"'to in accordance with the terms in your
Panchayat. and specification and conditions ol contract in force
rn the

2. Copy of the specification duly signed is also enclosed.


3. l.A&e furlher agree to complete the whole work in
from lhe date of receiptif order to weeks/months
*orr., ,ni/or in the case of piece-works maintain the
!he lenoer shedule. "t",t minimum rate of progress specilied in

,, ,r"tnJflf"X;'ff ffl;fl'ff,f ;:ffi: and carry out such po(ion or work inctuded in mylour tender as may be alotred ro rne/us
5 An earnest money cieposit of Rs' is herewith enclosed in cashiNational savrngs cerlificate.

Acc:
(i) Tender Schedule

(ii) Earnest money Rs. lin


(iii) Signed copy of specification
(!v) Signed copy of plans

Usuat SiEnature ol Tender

Full name

Nationality

Piace of residence

Dalc. of subntission

TENDER SCHEDULE
Nante o1 v;oi-k.

Arncunt of Estimate

l/We agree to undertake to execute the above


ol departmental materials specified to be supplied
work at.... .............1ess cost
and recovered at the rates given in the conditions enclosed.
Here quote any one of the following:-

1. Esttmate rate

2. .............% below estimate rate


3. ..............% above estimate rate

l/we also agree that the tender excess/reduciionmay be applied on the amount calculated alter de,Jucting
cepartmental materials from the total amount of lhe cost ol all
work, worked out at the rate given in the schedule attached
nolification. to the tenderlqrotation

Signature of the tenderer


Date:
Name and address
APPENDIX A.
(See Rule 5)

Conditions of Tendering for Works


The contractors are expected to inspect the site before tendering for a work.

Specific rates should be quoted for each iiem of work and tenders not quoted accordingly are liable to be rejected,

Sales tax will be recovered at the prevailing rates for the unaccounted departmental materials supplied to the contractor.

The contractor shall be bound to carry out all the extra items not provided in the tender schedule but found necessary during
the execution of the work. The extra items will be paid at schedule rates without profit plus or minus the propotiorrat6
dilference between probable amount of contract as per accepted tender for the work and estimate amount.

5. Lump sum item will be paid for only as per actuals on labour and materials al scheduled rates plus or minus the percentage
tender ditference but limited to the amount quoted for provided in the estimate whichever is less. The contractor shall 6e
solely responsible for the safety of his labour and other employees engaged on the work to pay compensation if and witen
required as per Workmen's Compensation Act in force.

6 lntending tenderers should produce the latest clearance certificate of agricultural income tax ancl sales tax.

7. All sums found due to the Panchayat under or by virtue ol the contract shall be recovered first from the security lurnished
by the contractor and if the same is insufficient, such deficit amount shall be recoverable in such manner as the Panchayat
may deem fit.

8. The contractor shall take out licence under the Explosive Bules for the time being in force to enable him to manfacture and
possess the quantity of gun power required by him for blasting.

9. lf materials and plants and machinery are supplied to the contractors, they shall be dealt with as per rules prevalant in the
P.W.D regarding such supplies.

't0 All other conditons and


specifications are the same as those current in the P.W.D.
FOR OFFICE USE ONLY

1. Scorings

2. Overwritings

3. Corrections

4. lnsertions

5. Bate quoted bY the Contractor

6. Dated singature and designation of the officer opening the tender.

SECRETARY

S-ar putea să vă placă și