RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
1 Introduction..........................................................................................3
1.1 Option 1...............................................................................................3
1.2 Option 2...............................................................................................3
1.3 Option 3...............................................................................................4
1.4 Option 4...............................................................................................4
2 Option 1...............................................................................................4
2.1 6601 Main Unit Installation ..................................................................4
2.2 E1 Connectivity ...................................................................................5
2.3 Power ..................................................................................................6
2.4 Power for the Main Unit .......................................................................6
2.5 Power for the remote units ..................................................................8
3 Fibre Connection .................................................................................9
3.1 Fibre Routing.......................................................................................9
3.2 Fibre Type .........................................................................................10
3.3 Fibre Testing .....................................................................................10
4 Remote Radio Head ..........................................................................14
4.1 Installation Option 1...........................................................................14
4.2 Installation Option 2...........................................................................14
5 Appendix A – RRU deployment Strategy ..........................................15
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 3 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
1 Introduction
This document is a guideline to installing the RBS 6601 and its associated RRU’s
in a Vodafone Network and should be used in conjunction with the following
installation documents:
9/1531-LZA 701 6001 Uen D | 2010-08-12 this document describes how to install
the Remote Radio Unit multi-Standard (RRUS) on site and how to connect it to
external interfaces.
15/1531-LZA 701 0003 Uen G This document describes general principles for
how to install an optical cable between the main unit and the remote radio unit in
a Main-Remote system.
There are multiple installation option and each option has a different installation
procedure, below is a list of the options
1.1 Option 1
Existing install:
RBS 3202 in a Cabin, on a rooftop.
Upgrade:
Install RBS 6601 in the Tx rack in the Cabin and install RRU’s at base of antenna
1.2 Option 2
Existing install:
RBS 3202 in an equipment room on a rooftop.
Upgrade:
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 4 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
Install RBS 6601 in the equipment room and install RRU’s at base of antenna or
on the wall in the equipment room.
1.3 Option 3
Existing install:
RBS 3202 in an equipment room at ground level and antennas are installed on
the rooftop.
Upgrade:
Install RBS 6601 in the equipment room and install RRU’s at base of antenna.
1.4 Option 4
Existing install:
RBS 3101 in a compound at ground level and antennas are installed on the
rooftop.
Upgrade:
Install RBS 6601 in the 3101 (3rd party space) and install RRU’s at base of
antenna.
2 Option 1
For a generic rooftop installation, where there is a Vodafone cabinet the Main
Unit will be installed in the transmission rack on the right hand side as you walk in
the door.
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 5 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
BT NTE
Spare
Future BEP-2
RF Cable Management
Main Unit Secondary
Main Unit Primary
DC Cable Management
DC Distribution Unit
Fig 1 Fig 2
2.2 E1 Connectivity
The SMZ connector needs to be removed from the back of the E1 distribution
panel situated in the back of the transmission rack
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 6 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
Fig 3 Fig 4
2.3 Power
The Main Remote gets its power from the transmission power supply. A 10A
circuit breaker must be installed, but prior to doing this one must check if the
power supply has got enough rectifiers installed, to work this out one must use
the following lookup table
Table 1
Please be aware that you will be working on a live DC distribution unit and
special care and attention must be taken not to disrupt any live equipment.
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 7 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
Fig 5
Figure 5 is a picture of the power supply unit in the transmission rack. The 6
modules at the bottom are the rectifiers units, the unit on the left hand side is the
control unit. Normally the power supply is configured with one rectifier.
Fig 6 Fig 7
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 8 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
Fig 8 Fig 9
Once the covers have been removed a 10A circuit breaker needs to be installed.
Vodafone’s procedure for installing new DC breakers should be adhered to. This
new 10A circuit breaker is to be used to power up the Main Unit only and not to
power up the Remote Units.
Fig 10 Fig 11
Connect the power lead that was provided with the kit into the Main Unit and
dress the cable neatly down the side as per fig 11 and connect to new 10A
Circuit breaker. The main unit should now be ready to power up.
The remote units will get power from a Eltek DC distribution system, see fig 12.
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 9 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
Fig 12
The main feed for this DC distribution unit will come from the main DC distribution
power supply for the Cabinet, and connect directly to the back of the Eltek unit
using 35mm2 DC cable. The circuit breaker for the main feed should be xxxxx
3 Fibre Connection
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 10 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 11 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
4. Instruments with an integrated optical power meter that have the power meter
function enabled automatically test incoming power level.
The power level threshold can be adjusted by pressing the "Threshold" software
key and feeding the desired value.
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 12 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
5. The instrument will now verify the connection. The connection check feature
ensures that the result is not impaired because of incorrectly connected or
improperly cleaned connectors.
When connection check level is "GOOD", testing will start automatically within 5
seconds.
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 13 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
6. If connection check level is "POOR", follow the instructions on the screen. You
can always press "Continue" to move forward but note that a poor connection
renders a poor result.
7. All test parameters are fixed and non-adjustable to ensure accurate and
consistent results.
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 14 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
TBI
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 15 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
The RRUW must always be installed with the cable connections facing
downwards
To prevent hot air from one RRUW heating the intake air of another RRUW,
RRUWs must never be installed above one another
To ensure adequate airflow between the units, allow a minimum of 400mm free
space above and 300mm free space minimum below each RRUW. Allow a
minimum of 200mm free space between RRUs installed side by side. A minimum
of 1 meter free space is required in front of the RRUs
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 16 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
Document history
Document distribution
This request covers the Vodafone site design requirements for the following site types with regards the deployment of
remote radio heads. A remote radio head should be considered to be around 17 litres and weigh up to 20 Kg:
• All roof tops should allow for a minimum of 4 remote radio positions per sector.
• Major cities should allow for 5 remote radio units per sector or if the site already has 900, 1800 and 2100 MHz.
• During the installation of any remote radio unit, the power and fibre should be dimensioned to allow for the
upgrade of the site to a full complement of remote radio heads. The fibre type should be the same as the initial
radio head installed.
Written by LeslieBotha
Error! Unknown document property
name.
Error! Unknown document property
name. 17 (17)
RBS 6601 INSTALLATION ERROR!
UNKNOWN DOCUMENT PROPERTY
NAME.S
Prepared (also subject responsible if other) No.
Leslie Botha
Approved Checked Date Rev Reference
Written by LeslieBotha