MANO DE OBRA
147000032.00 TOPOGRAFO HH 46.95 16.19
256010100.00 CALAMINA GALVANIZADA ZINC DE 11 CANALES 1.83 X 0.83 M X PLA 114.00 22.00
272150081.00 REDUCCION PVC SAP C-10 1 1/2" A 1" PZA 13.00 3.39
272150082.00 REDUCCION PVC SAP C-10 1" A 1/2" PZA 85.00 2.97
272150083.00 REDUCCION PVC SAP C-10 DE 2" A 1 1/2" UND 1.00 6.50
272150084.00 REDUCCION PVC SAP C-10 1 1/2" A 1/2" UND 12.00 4.07
273130031.00 TEE PVC SAP C-10 1 1/2"X1 1/2" UND 24.00 6.78
EQUIPOS
337010105.00 PROTECTORES DE OIDO TIPO TAPON CON CORDON UND 45.00 5.00
337990103.00 ZAPATOS DE SEGURIDAD PUNTA DE ACERO PARA OBREROS PAR 45.00 120.00
337990104.00 ZAPATOS DE SEGURIDAD PUNTA DE ACERO PARA PERSONAL T PAR 5.00 400.00
760.19 762.96
28894.67 28,908.12
11855.44 11,828.60
156369.89 156,335.18
197880.18 197834.86
75 75
586.10 587.08
490.97 492.78
197.21 198.90
165.00 165.00
20.32 20.32
5,012.48 5,015.59
1,051.97 1,051.60
2,544.00 2,544.00
1,930.39 1,930.34
25.40 25.40
2,185.58 2,185.55
45.50 45.50
1,185.81 1,185.81
254.40 254.40
169.60 169.60
105.60 105.60
374.40 374.40
1,650.00 1,650.00
900.00 900.00
12.20 12.20
237.34 233.38
29738.34 29738.34
10.20 10.20
11,855.49 11854.18
3115.00 3115.00
252.00 252.00
60.00 60.00
1,322.10 1,322.10
2.54 2.54
7.20 7.20
10.00 10.00
50.00 50.00
101.02 100.96
249.05 247.32
118.80 118.80
1,539.02 1,538.91
1,391.72 1,399.96
6.78 6.78
600.00 600.00
32.20 32.20
191.98 191.66
25.94 25.99
0.15 0.15
7,500.00 7,500.00
15,043.48 15,043.48
153.07 153.11
2,494.84 2,494.84
881.17 885.02
0.01 0.01
9,925.34 9,954.57
750.00 750.00
350.00 350.00
700.00 700.00
677.95 677.95
457.64 457.64
211.86 211.86
1,716.15 1,716.15
9,050.41 9,050.41
1,962.00 1,962.00
4.89 4.90
4,000.00 4,000.00
1,469.55 1,469.55
12,790.15 12,791.36
0.54 0.54
1,852.50 1,852.50
500.00 500.00
375.00 375.00
474.13 474.04
358.90 358.96
84.74 84.74
224.04 233.38
109.16 109.16
863.72 870.69
78.53 78.55
1.72 1.72
3.46 3.46
2,508.00 2,508.00
78.84 78.84
660.96 660.96
576.24 576.24
56.00 56.00
118.58 118.58
104.00 104.00
16.94 16.94
60.00 60.00
70.00 70.00
70.00 70.00
50.84 50.84
288.00 288.00
24.50 24.50
40.00 40.00
37.75 37.75
68.23 68.22
139.54 139.54
924.14 924.14
152.46 152.46
553.58 553.58
243.00 243.00
189.30 189.30
30.00 30.00
36.00 36.00
8.00 8.00
4.50 4.50
52.00 52.00
6.78 6.78
150.00 150.00
160.00 160.00
26.00 26.00
44.07 44.07
252.45 252.45
6.50 6.50
48.84 48.84
20.34 20.34
15.24 15.24
3.96 3.96
160.00 160.00
101.23 116.69
77.00 77.00
8.48 8.48
10.00 10.00
4.00 4.00
300.82 300.82
34.56 34.56
15.82 15.82
43.47 43.47
9.20 9.20
5.08 5.08
391.60 391.60
356.16 356.16
33.90 33.90
25.40 25.40
15.24 15.24
3.96 3.96
10.16 10.16
24.90 24.90
26.15 26.15
67.20 67.20
352.44 352.44
81.24 81.24
15.00 15.00
736.89 736.89
57.86 57.87
3,933.60 3,933.60
17.22 17.23
35.64 35.64
254.25 254.25
162.72 162.72
288.09 288.09
12.00 12.00
10,872.83 10,883.92
4,098.24 4,104.72
628.34 628.34
366.08 366.08
330.48 330.48
204.80 204.80
410.00 410.00
892.12 892.12
250.00 250.00
46.87 47.08
0.01 0.00
4.37 0.45
22.01 22.13
175.75 176.01
88.95 88.95
46.61 46.61
76.26 76.26
2,461.27 2,461.27
5,908.75 5,908.75
0.66 0.66
120.00 120.00
225.00 225.00
1,350.00 1,350.00
225.00 225.00
5,400.00 5,400.00
2.29 2.28
4,732.53 4,761.33
900.00 900.00
1,200.00 1,200.00
810.00 810.00
3,375.00 3,375.00
4,950.00 4,950.00
600.00 600.00
60.00 60.00 P
5,400.00 5,400.00
2,000.00 2,000.00
750.00 750.00
685.24 685.24
0.20 0.20
1,054.88 1,053.62
37.44 41.60
6,336.86 6,337.96
822.00 822.00
380.63 380.64
11,618.30 11,647.47
739.68 758.34
59684.46 59765.09
439,070.24 439,193.83
Código Recurso Unidad Cantidad
MANO DE OBRA
147030091.00 OPERARIO HH 7438.81
212090049.00
0212170044 CAJA OCTOGONAL GALV. 4" X 2 1/8 " UND
UND 86.00
250060025.00 TAPA C/MARCO FºFº DESAGUE 12"X24" CONEX PRE DOMIC UND 86.00
EQUIPOS
271,064.19 271,004.54
728,346.18 728,395.89
EQUIPOS
27,126.01 27,162.49
1,026,536.38 1,026,562.92
Recurso Unidad Cantidad Precio S/. Parcial S/.
MANO DE OBRA
OPERARIO HH 7438.81 16.19 120,434.33
271,064.19
TAPA C/MARCO FºFº DESAGUE 12"X24" CONEX PRE UND 86.00 33.05 2,842.30
TUBO PVC SEL (E/C) 3/4" X 3.00 M. PZA 430.00 3.11 1,337.30
728,342.74
27,126.01
1,026,536.38
Presupuestado S/.
120,409.99
31,773.34
118,821.21
271,004.54
1,707.46 9.48
13.76 -0.09
1,011.00 -3.32
1,804.79 -15.20
5,626.88 0.00
28,781.58 -18.05
6,054.57 -0.82
10,954.85 0.11
335.01 0.00
17,214.42 -2.06
5,121.25 0.00
15,059.57 -0.08
1,496.40 0.00
16,549.84 0.00
113,950.00 0.00
4,094.46 0.00
1,457.70 0.00
721.54 0.00
1,543.70 0.00
1,216.90 0.00
6,014.84 0.00
1,457.70 0.00
2,102.70 0.00
229.62 0.00
304.44 0.00
341.42 0.00
2,150.00 0.00
390.44 -3.44
3,061.60 0.00
17,890.60 0.00
30,033.80 -6.86
56,343.89 9.18
2,274.70 0.00
5,418.00 0.00
619.20 0.00
705.20 0.00
53.32 0.17
645.00 0.00
1,635.72 0.00
317.35 -2.19
1,396.80 -8.94
1,800.00 0.00
18,000.00 0.00
7,500.00 0.00
3,500.00 0.00
2,100.00 0.00
100.00 0.00
2,500.00 0.00
1,000.00 0.00
5,100.00 0.00
19,972.14 0.00
35,000.00 0.00
20,500.00 0.00
23,745.36 0.10
923.69 2.84
2,000.00 0.00
25,200.00 0.00
20,210.00 0.00
49.20 -1.37
5,590.00 0.00
25,600.00 0.00
800.00 0.00
273.58 0.00
13,632.72 0.00
13,932.00 0.00
25,920.60 -3.81
309.78 -2.13
1,627.98 0.00
2,842.30 0.00
5,409.40 0.00
1,119.72 0.00
534.92 0.00
1,892.00 0.00
946.00 0.00
860.00 0.00
395.60 0.00
3,207.80 0.00
22,790.62 0.34
6,846.96 0.19
2,906.80 -4.47
3,654.14 0.00
1,889.42 0.00
447.20 0.00
2,022.72 0.00
404.20 0.00
262.30 0.00
1,337.30 0.00
219.30 0.00
140.18 0.17
10.94 -2.90
14,577.00 0.00
1,290.00 0.00
5,600.00 0.00
1,800.00 0.00
728,395.89
8,145.39
900.00
600.00
8,809.20
6,958.05
379.95
1,369.90
27,162.49
1,026,562.92
Código Recurso Unidad
COMPONENTE SOCIAL
185020001.00 PROMOTOR/A MES
0185020009 DIA
PAGO AL CAPACITADOR TALLER I ESTATUTOS Y REGLAMENTOS (ANTES)
0185020012
DEL SISTEMA PAGO AL CAPACITADOR TALLER IV DIA
0185020015
CLORACION Y DESINFECCIÓN PAGO AL CAPACITADOR TALLER VII DIA
0185020017 HABITOS DE HIGIENE Y SID (DESPUES) PAGO AL CAPACITADOR TALLER VIII DIA
0185020018
PARTICIPACIÓN CIUDADANA PAGO AL CAPACITADOR TALLER IX MICROCUENCA Y GESTION DE DESASTRES DIA
MATERIALES
E SOCIAL
3.00 3092.24 9,276.72 9,276.72
18,553.02 18,553.02
3,499.10 3,499.10
22,052.12
CRONOGRAMA DE ADQUISICION DE MATERIALES, USO DE M
FUNCION: EDUCACION
PROGRAMA: EDUCACION BASICA
SUB-PROGRAMA: EDUCACION INICIAL
OBRA: MEJORAMIENTO DE LA OFERTA DEL SERVICIO EDUCATIVO DE LAS INSTITUCIONES EDUCATIVAS
META: CONSTRUCCION DE INFRAESTRUCTURA
MODALIDAD:
UBICACIÓN: DISTRITO : CHALLHUAHUACHO
PROVINCIA : COTABAMBAS
DEPARTAMENTO : APURIMAC
FECHA: OCTUBRE DEL 2016
RESUMEN TOTAL:
MANO DE OBRA
MATERIALES
HERRAMIENTAS Y EQUIPOS
TOTAL COSTO DIRECTO
ADELANTO SOLICITADO:
MATERIALES, USO DE MANO DE OBRA, MAQUINARIA Y EQUIPO (CANTIDAD Y COSTO
DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL Nº 884 DE LA LOCALIDAD DE QUEULLABAMBA, Nº 50771 DE LA LOCALIDAD DE P
DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL Nº 884 DE LA LOCALIDAD DE QUEULLABAMBA, Nº 50771 DE LA LOCALIDAD DE P
DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL Nº 884 DE LA LOCALIDAD DE QUEULLABAMBA, Nº 50771 DE LA LOCALIDAD DE P
DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL Nº 884 DE LA LOCALIDAD DE QUEULLABAMBA, Nº 50771 DE LA LOCALIDAD DE P
DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL Nº 884 DE LA LOCALIDAD DE QUEULLABAMBA, Nº 50771 DE LA LOCALIDAD DE P
DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL Nº 884 DE LA LOCALIDAD DE QUEULLABAMBA, Nº 50771 DE LA LOCALIDAD DE P
DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL Nº 884 DE LA LOCALIDAD DE QUEULLABAMBA, Nº 50771 DE LA LOCALIDAD DE P
DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL Nº 884 DE LA LOCALIDAD DE QUEULLABAMBA, Nº 50771 DE LA LOCALIDAD DE P
DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL Nº 884 DE LA LOCALIDAD DE QUEULLABAMBA, Nº 50771 DE LA LOCALIDAD DE P
DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL Nº 884 DE LA LOCALIDAD DE QUEULLABAMBA, Nº 50771 DE LA LOCALIDAD DE P
DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL Nº 884 DE LA LOCALIDAD DE QUEULLABAMBA, Nº 50771 DE LA LOCALIDAD DE P
DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL Nº 884 DE LA LOCALIDAD DE QUEULLABAMBA, Nº 50771 DE LA LOCALIDAD DE P
487,392.42 32.76%
913,488.87 61.40%
86,927.58 5.84%
1,487,808.87 100.00% 1,423,085.62
AGUA 439,193.83
1,930,896.47 UBS 1,026,562.92
1,636,352.94 CS 22,052.12
386,179.29 TOT.PREST 1,487,808.87
EL HORIZONTE SRL.
11/2/2016
180 Días Calendario
5/1/2017
EL HORIZONTE SRL.
11/2/2016
180 Días Calendario
5/1/2017
EL HORIZONTE SRL.
11/2/2016
180 Días Calendario
5/1/2017
EL HORIZONTE SRL.
11/2/2016
180 Días Calendario
5/1/2017
EL HORIZONTE SRL.
11/2/2016
180 Días Calendario
5/1/2017
EL HORIZONTE SRL.
11/2/2016
180 Días Calendario
5/1/2017
EL HORIZONTE SRL.
11/2/2016
180 Días Calendario
5/1/2017
EL HORIZONTE SRL.
11/2/2016
180 Días Calendario
5/1/2017
EL HORIZONTE SRL.
11/2/2016
180 Días Calendario
5/1/2017
EL HORIZONTE SRL.
11/2/2016
180 Días Calendario
5/1/2017
EL HORIZONTE SRL.
11/2/2016
180 Días Calendario
5/1/2017
EL HORIZONTE SRL.
11/2/2016
180 Días Calendario
5/1/2017
438,131.00
1,026,562.32
22,052.12
1,486,745.44 1,423,085.62
267614.1792 256155.4116
RESUMEN DE LA RELACION DE INSUMO
INSUMOS AGUA
INSUMOS UBS
INSUMOS COMPONENTE SOCIAL
TOTAL COSTO DIRECTO
439193.83
1026562.92
22052.12
1487808.87