As per UBC 97
Height of inter story of Shear Wall, Hs = 5.486 m
If, Building Period T<0.7 Sec, Then ∆all = 137.15 mm
If, Building Period T>0.7 Sec, Then ∆all = 109.72 mm
Reinfocement in Wall:
Required Main/Vertical Reinf from Etabs = 1443
Selet Rebar (A) = 12 ∅
Required Spacing = 329.18
Provide Spacing (Auto Suggestion) = 325.00
Finally Provided to fulfil min Req. = 200.00
Minimum Required Reinf. Ratio = 0.0025
Provided Reinfocement Ratio = 0.00557
Maximum Spacing = 609.6
or 450
or 700.0
Maximum Allowable Spacing = 450.0
mm2 Total
in both faces
mm
mm
ACI 318-14 (11.6.2(a)
OK 10 ∅
mm 3xThickness
mm 18inch ACI 318-14 (11.7.2.1)
mm Length of Wall/3
mm OK
mm2 Total
in both faces
mm
mm
ACI 318-14 (11.6.2(b)
OK ACI 318-14 (2.2)
mm 3xThickness
mm 18inch ACI 318-14 (11.7.3.1)
mm Length of Wall/5
mm OK
@ 200 mm C/C
@ 200 mm C/C
10
12
14
16
18
20
28
30
32