Documente Academic
Documente Profesional
Documente Cultură
v=r4iIPTYJ7PM
Dear Manager
XU GAOLIN
Hope you are Fine. Boss I want to discuss something as you know I am old and more
experienced roustabout on rig. Now you have a chance to promote roustabout.. Please give me a
chance. I also have SUNRISE drilling company experience. On my last duty I already showed
you sunrise Employee card.
Adnan Ali
Roustabout
Anton 4001
Answer :
Answer :
Desander: remove sand from mud less than (74 -40micron working pressure (35-45) psi.
capacity 500gpm/cone
Capacity 75gpm/cone
micron
Answer :
Answer :
It is used to check the well for losses or gain during tripping or wire line operation
Answer :
Permit to work
Per job safety meeting
Electric isolation and put safety lock behind pump
Close discharge valve - open bleed valve -then close suction valve
Check pump and replace parts
Remove tools from pump area
Open discharge valve-closed bleed valve-open suction valve
Remove safety lock and isolation
Cleen cooling tank and fill it
close work permit
Answer :
Answer :
Answer :
Answer :
Answer :
Answer :
Heavy mud using berfore triping out to save mud and cleen pipes
Answer :
Work permit
Measure gases with multi gas detector
Clean tanks
Close work permit
Answer :
Every day
Answer :
Answer :
Ph is the pressure exerted by the drilling fluid to offset the pressure exerted by the formation
fluid
Sufficient hydrostatic pressure is required to prevent the borehole wall from caving in and to
keep formation fluid from entering the wellbo
Question 16. What Is The Relationship Between The Water Losses And Filter Cake?
Answer :
Question 17. What Will Happen When Sand Found With Drilling Mud?
Answer :