Refurbishment schematics 3.10 -/conversion/tmp/scratch/424009506.

doc-Page 1 of 14

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: 18kV Switchgear panel To: New Relay Panel
Cable no: 4/18S (1) Cores: 19
Length: 55m Qty: 2 glands

Relay 4/18P 18kV Protection New Relay


Panel Panel Plant TB-
TB1
No Core Ferrule Term Ferrule Term Comments
numbe no no no no
r
R1 1 X62 X62 1 ACB Closed
R2 2 X63 X63 2 ACB Open
R3 3 X35 X35 3 Isolator g4 closed
R4 4 X36 X36 4 Isolator g4 open
R5 5 X37 X37 5 E /Switch G1A closed
R6 6 X38 X38 6 E /Switch G1A open
R7 7 X39 X39 7 E /Switch G1B closed
R8 8 X40 X40 8 E /Switch G1B open
R9 9 X54 X54 9 ACB low air pressure
R10 10 X55 X55 10 ACB trip supply fai**l
11 X31 X31 11 Common +ve
12 Spare Spare 12
13 Spare Spare 13
14 Spare Spare 14
15
16
17
18
19

** to be identified

1multicore cable schedules Page 1 of 14 issued 14/12/01


Refurbishment schematics 3.10 -/conversion/tmp/scratch/424009506.doc-Page 2 of 14

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: 18kV Protection panel To: New Relay Panel
Cable no: 4/18P (2) Cores: 19
Length: 48m Qty: 2 glands

Relay 4/18P 18kV Protection New Relay


Panel Panel Plant TB

No Core Ferrule Term Ferr Term Comments


R11 1 X52 X52 15 Main protection operated
R12 2 X53 X53 16 Backup protection operated
R13 3 X57 X57 17 Unit Tx Buchholz
R14 4 X55 X55 18 Trip Circuit Fail Alarm
R15 5 19 Overvoltage
R16 6 20 Overcurrent
R17 7 21 Merz price
R18 8 22 Earth fault
X 9 X51 X51 23 Common +ve
X 10 X59 X59 24 Common –ve
11 Spare Spar 25
12 Spare Spar 26
13 Spare Spar 27
14 Spare Spar
15 Spare Spar
16 Spare Spar
17 Spare Spar
18 Spare Spar
19 Spare Spar

2multicore cable schedules Page 2 of 14 issued 14/12/01


Refurbishment schematics 3.10 -/conversion/tmp/scratch/424009506.doc-Page 3 of 14

MULTICORE CABLE SCHEDULE


Date: 28/08/2001
From: Excitation Control Suite To: New Relay Panel
Cable no: 4/EP (3.1) Cores: 2 x 27
Length: 39m Qty: 2 glands
4/18P Excitation control suite New Relay Panel Plnat TB
Core no Ferrule no Term no Ferrule no Term no Comments
TB11
1 U1008 U1008 28 VT fail/ Trip to Manual
2 U1104 U1104 29 Rotor earth fault
3 U1006 U1006 30 Rotor high temp
4 U1010 U1010 31 Electronic power pack failure
5 U1012 U1012 32 Convertor line fuse failed
6 U1014 U1014 33 Convertor surge circuit failure
7 U1016 U1016 34 Excitation tx high temp
8 U1022 U1022 35 Thyristor Cooling Fault
9 U1024 U1024 36 Electronic power supply failure
10 U1026 U1026 37 Thyristor fault
11 U1028 U1028 38 AC standby power sup.failure
12 U1030 U1030 39 DC auxiliary power sup.failure
13 U1036 U1036 40 Under excitation limit
14 U1038 U1038 41 Over excitation limit
15 U1037 U1037 42 Common 24v for DI 17-32-*
16 U1040 U1040 43 Thyristor high temp. trip
TB12
17 U1042 U1042 44 Thyristor high temp.alarm
18 U1060 U1060 45 Stator current limit
19 U1052 U1052 46 Power System Stabiliser Failed
20 47
21 U1007 U1007 48 VT fail/ Trip to Manual( 24V
for DI(1-16)
22 Spare Spare 49
23 Spare Spare 50
24 Spare Spare 51
25 Spare Spare 52
26 Spare Spare 53
27 U1039 603 54 Common 24v for DI 33-48**
Notes remove all temporay loops except the one on TB12 05a-09a and 05b-09b(connected to the r
Exitaion in manul Input to seqeunce). All existing wiring to Sequencer to remain as is
 *Loop THE COMMON 24V(FOR DI’s 17-32) U1037 (586) in EXCITER PANEL terminals. U
1035,U1029,U1027,U1025,U1023,U1021,U1015,U1013,U1011,U1009, ,U1005,U1003,U1001
 ** Loop THE COMMON 24V(FOR DI’s 33-48) U1039 (603) in EXCITER PANEL terminals.
U1039,U1041,U1051,U1059
In the Exciter panel the following Alarms are Grouped
Alarms Wire No’s to be looped Wire No’s to be looped Group Alarm Name

Phasing reference failed U1007 U1008 VT fail/ Trip to Manual


VT fault U1031 U1032
AVR tripped to manual U1033 U1034
U1017 U1018
Cooling fan failure U1019 U1020 Thyristor Cooling fault
Air flow failure U1021 U1022
Blocked filter Alarm U1043 U1044

3multicore cable schedules Page 3 of 14 issued 14/12/01


Refurbishment schematics 3.10 -/conversion/tmp/scratch/424009506.doc-Page 4 of 14

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: Sequencer Panel To: New Relay Panel
Cable no: 4/SP (4.1) (19core) Cores: 1x 27, 1 x 19
Length: 10m Qty: 2 glands

4/18P Sequencer Panel New Relay Panel Plant TB


Core number Ferrule no Term no Ferrule no Term no Comments
1 Ax11 Tb2/70T Ax11 55 Sequencer failure
2 Ax12 Tb2/70B Ax12 56 RL 60
3 Ax13 Tb2/71T Ax13 57 Incomplete sequence
4 Ax14 Tb2/71B Ax14 58 RL33
5 Ax15 TB2/72T Ax15 59 Auto sync on
6 Ax16 TB2/72B Ax16 60 RL 65B
7 Ax17 TB2/75T Ax17 61 Ready to sync
8 Ax18 TB2/75B Ax18 62 RL 21
9 Ax19 TB2/110T Ax19 63 Unit in operation
10 Ax20 TB2/110B Ax20 64 RL41
11 1689 TB2/45T 1689 65 Unit at rest available for
12 1690 TB2/45B 1690 66 start RL45
13 1691 TB2/46T 1691 67 Unit start in progress
14 1692 TB2/46B 1692 68 RL 46
15 1693 TB2/47T 1693 69 Unit Isolated
16 1694 TB2/47B 1694 70 RL47
Common for digital 71 Wire No 603 cable from
inputs DI S800
33-48
17 1695 TB2/48T 1695 72 Unit start-up auxiliaries
18 1696 TB2/48B 1696 73 RL48
19 1721 TB2/62T 74 Excitatin Build up Fail RL
62

4multicore cable schedules Page 4 of 14 issued 14/12/01


Refurbishment schematics 3.10 -/conversion/tmp/scratch/424009506.doc-Page 5 of 14

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: Sequencer Panel To: New Relay Panel
Cable no: 4/SP (4.2)(27core) Cores: 1x 27, 1 x 19
Length: 10m Qty: 2 glands

4/18P SEQ Panel New Relay Panel Plant TB


Core number Ferrule no Term no Ferrule no Term no Comments
1 1697 TB2/49T 1697 75 Unit start-up to SNL
2 1698 TB2/49B 1698 76 RL49
3 1699 TB2/50T 1699 77 Commissioning in progress
4 1700 TB2/50B 1700 78 –Do not Operate RL50
5 1701 TB2/51T 1701 79 Unit at SNL
6 1702 TB2/51B 1702 80 RL51
7 1703 TB2/52T 1703 81 Unit synchronising
8 1704 TB2/52B 1704 82 sequence RL52
9 1705 TB2/53T 1705 83 Turbine to governor setting
10 1706 TB2/53B 1706 84 generator ready to load
VARS -RL53
11 1707 TB2/54T 1707 85 Unit stop in Progress
12 1708 TB2/54B 1708 86 RL54
13 1709 TB2/55T 1709 87 Turbine at rest
14 1710 TB2/55B 1710 88 RL55
15 1711 TB2/56T 1711 89 Speed signal faulty
16 1712 TB2/56B 1712 90 RL56
17 1713 TB2/57T 1713 91 Caution Test mode enabled
18 1714 TB2/57B 1714 92 RL57
19 1715 TB2/58T 1715 93 Battery faulty
20 1716 TB2/58B 1716 94 RL58
21 1717 TB2/59T 1717 95 Self test
22 1718 TB2/59B 1718 96 RL59
23 Ax21 Tb2?? Ax21 97 Excitation in Auto
24 Ax22 Tb2?? Ax22 98 RL42
25 Ax23 TB2?? Ax23 99 Excitation in Manual OR
26 Ax24 TB2?? Ax24 100 S/by Control- RL43
27 1719 TB2/61T 101 Field Contactor Closed
RL61

5multicore cable schedules Page 5 of 14 issued 14/12/01


Refurbishment schematics 3.10 -/conversion/tmp/scratch/424009506.doc-Page 6 of 14

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: Turbine Panel To: New Relay Panel
Cable no: 4/AP (5.1) Cores: 27
Length: 8m Qty: 2 glands

Relay 4/18P 18kV New Relay Panel


Protection Plant TB
No Core Panel
Ferrule Term Ferrule Term Comments
R19 1 L2 TB2 L2 104 High Bearing Temp
R20 2 L3 TB2 L3 105 Gov Oil Pressure Low
R21 3 L6 TB2 L6 106 Gv Fail To Close
R22 4 L10 TB2 L10 107 Brake Air Pressure Low
R23 5 L12 TB2 L12 108 Cooling Water Failure
R24 6 L19 TB2 L19 109 S/By Gop Running
R25 7 L21 TB2 L21 110 Guide Vanes Fail To Open
R26 8 L40 TB2 L40 111 Shear-Pin Failure
R27 9 L24 TB2 L24 112 Stator Air Temp
R28 10 L22 TB2 L22 113 Governor Oil Level Low
R29 11 L23 TB2 L23 114 Brakes Fail To Operate
R30 12 L25 TB2 L25 115 Co2 Released
R31 13 L26 TB2 L26 116 Fail To Start
R32 14 L27 TB2 L27 117 Overspeed
R33 15 L28 TB2 L28 118 Exciter Trip To Manual /Sby
R34 16 L30a TB2 L30a 119 Gen Guide Bering Oil Level
R35 17 L30 TB2 L30 120 TGB And GTB Oil Level
R36 18 L31 TB2 L31 121 Filters Clogged
R37 19 L38a TB2 L38a 122 Tchwl Trip
R38 20 L35 TB2 L35 123 Brake Interlock Failure
R39 21 L33 TB2 L33 124 Urgent Excitation Trouble
R40 22 L29/L34 TB2 L34 125 STN/TCWDrain Sump Hwl
R41 23 4L5 TB1 L5 126 Governor Fail *
R42 24 L4 TB1 L4 127 Governor Fault*
25 L37 TB2 L37 128 Common Negative
26 1720 TB2/ 102 Field Contactor Closed
27 1722 TB2 103 Excitation build up Fail

*See wiring modes for Governor


For L29/34: L29 for units 1,3,5( Stn drain)& L34 for units 2,4,6( TCW drain)

6multicore cable schedules Page 6 of 14 issued 14/12/01


Refurbishment schematics 3.10 -/conversion/tmp/scratch/424009506.doc-Page 7 of 14

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: Turbine Panel To: New Relay Panel
Cable no: 4/TP 5.2 Cores: 19
Length: 10m Qty: 2 glands

Relay 4/18P Turbine Panel New Relay Panel


Plant TB
No Core Ferrul Term no Ferrul Term Comments
R43 1 L200 TB1 t/panel L200 131 C/S supply available (L)
2 L201 TB1 t/panel L201 132
R44 3 L202 TB1 t/panel L202 133 Unit Tx supply available
4 L204 TB1 t/panel L204 134
R45 5 L114 TB1 t/panel L114 135 C/S supply on
6 L116 TB1 t/panel L116 136
R46 7 L115 TB1 t/panel L115 137 Unit Tx supply on
8 L116 TB1 t/panel L116 138
XX 9 Ax1 TB1 t/panel Ax1 139 Auto manual
XX 10 Ax2 TB1 t/panel Ax2 140
XX 11 Ax3 TB1 t/panel Ax3 141 Remote/Local
XX 12 Ax4 TB1 t/panel Ax4 142
R47 13 L43 TB1 t/panel L43 143 Intake gate closed
14 L44 TB1 t/panel L44 144 Intake Gate Ind.common
R48 15 L42 TB1 t/panel L42 145 Intake Gate Open
16 Ax5 TB1 t/panel Ax5 146 Tchwl Alarm
17 Ax6 TB1 t/panel Ax6 147
18 Spare Spare 148
19 Spare Spare 149

MULTICORE CABLE SCHEDULE

7multicore cable schedules Page 7 of 14 issued 14/12/01


Refurbishment schematics 3.10 -/conversion/tmp/scratch/424009506.doc-Page 8 of 14

Date: 28/08/2001
From: Turbine Panel To: New Relay Panel
Cable no: 4/18S (5.3) Control commands Cores: 19
Length: 55m Qty: 2 glands
4/18P Turbine Panel New Relay Panel Plant
TB Tb
Core Ferrule no Term no Ferrule no Term no Comments
1 W1153 TB1 655 150 Unit start
2 W1155 TB1 656 151
3 W1157 TB1 657 152 Unit stop
4 W1159 TB1 658 153
5 W1205 TB1 659 154 Unit Synchronise
6 W1207 TB1 660 155
7 W1145 TB1 W1145 156 Reset Auto Synch
8 W1145A TB1 W1145A 157
9 Spare 158
10 L210 TB1 L210 159 Open ACB
11 W11 TB1 W11 160
12 W13a TB1 W13a 161
13 L211 TB1 L211 162
14 Z165 TB1 Z165 163 Trip Intake gate
15 Z161 TB1 Z161 164
16 Z164 TB1 Z164 165
17 Earth TB1 Earth 166
18 Spare TB1 167
19 Spare TB1 168

To be connected to plant with Machine shut down and Isolated

8multicore cable schedules Page 8 of 14 issued 14/12/01


Refurbishment schematics 3.10 -/conversion/tmp/scratch/424009506.doc-Page 9 of 14

MULTICORE CABLE SCHEDULE


( Existing Cable) Use Spare cores

Date: 28/08/2001
From: Machine Remote junction box To: Annanciator
Cable no: Cores: 37
Length: Qty:

4/18P Rem Control Juntion Box Annanciator Panel


Core number Ferrule no Term no Ferrule no Term no Comments
1 Unit Tx C02 Isolated
2 X60 X60 Unit Tx C02 released
3 X56 X56 Unit Tx 380V earth fault
Common +ve

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: Annanciator To: New Relay box
Cable no: (6) Cores: 10
Length: Qty:

Relay 4/18P Annanciator Panel New Relay Panel


Plant TB
No Core Ferrule no Term no Ferrule Term no Comments
No no
R49 1 X?? 169 Unit Tx C02 Isolated
R50 2 X60 X60 170 Unit Tx C02 released
R51 3 X56 X56 171 Unit Tx 380V earth
fault
4 Z79 TB1 172 SDR operated
5 Z100 TB1 173
6 Ax7 DCF/9 Ax7 174 Alarm supply fail
7 Ax8 DCF/11 Ax8 175

8 Ax9 EDPRR /9 Ax9 176 EDP Running ( No 6


9 Ax10 EDPRR/11 Ax10 177 Only)
10 X59 178 Common

9multicore cable schedules Page 9 of 14 issued 14/12/01


Refurbishment schematics 3.10 -/conversion/tmp/scratch/424009506.doc-Page 10 of 14

SCREENED CABLE SCHEDULE

Date: 28/08/2001
From: Transducers To: S800 panel
Cable no: 4/TP1-14 Cores: Twisted pair
Length: Qty:

Cable 4/18 From Transducers S800 Panel


No. Core Ferrule Term no Ferrule no Term Comments
4T/P1 + 505 505 Stator air temp 1
- 506 506
4T/P2 + 507 507 Stator air temp 2
- 508 508
4T/P3 + 509 509 TGB temp
- 510 510
4T/P4 + 511 511 GTB temp
- 512 512
4T/P5 + 513 513 GGB
- 514 514
4T/P6 + 515 515 Stator temp
- 516 516
4T/P7 + 517 517 Rotor temp
- 518 518
4T/P8 + 519 519 Rotor current
- 520 520
4T/P9 + 24E50+ 24E50+ Spiral Casing pressure
- 522 522
4T/P10 + 24E50+ 24E50+ Governor oil pressure
- 524 524
+ 24E50+ 24E50+ Governor Air vessel
- 526 526 Pressure
333333
4T/P12 + 527 527 Stator current
- 258 258
4T/P13 + 529 529 Volts
- 530 530
4T/P14 + 531 531 Water flow
- 532 532
4T/P15 + 24E50+ 24E50+ Lake Level
- 534 534
4T/p16 + 24E50+ 24E50+ Tail–Race Level
_ 536 536
NB Lake level and tail race level connected to Unit one Only

10multicore cable schedules Page 10 of 14 issued 14/12/01


Refurbishment schematics 3.10 -/conversion/tmp/scratch/424009506.doc-Page 11 of 14

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: S8000 Panel To: New Relay Panel
Cable no: 4/SP (7.1&2) (37) Cores: 1x 37,
Length: 10m Qty: 2 glands

S800 panel New relay


panel S800 Tb
Core Ferrul Terminal Term Ferru Term I/O No Designation
numbe e no block le
r
1 553 +B16.DI1 1/1 553 1 DI1 ACB Closed
2 554 +B16.DI1 2/1 554 2 DI2 ACB Open
3 555 +B16.DI1 3/1 555 3 DI3 Isolator g4 closed
4 556 +B16.DI1 4/1 556 4 DI4 Isolator g4 open
5 557 +B16.DI1 5/1 557 5 DI5 E /Switch G1A closed
6 558 +B16.DI1 6/1 558 6 DI6 E /Switch G1A open
7 559 +B16.DI1 7/1 559 7 DI7 E /Switch G1B closed
8 560 +B16.DI1 8/1 560 8 DI8 E /Switch G1B open
9 561 +B16.DI1 9/1 561 9 DI9 ACB Low Air pressure
10 562 +B16.DI1 10/1 562 10 DI10 ACB trip supply fail
11 563 +B16.DI1 11/1 563 11 DI11 Main Protection Operated
12 564 +B16.DI1 12/1 564 12 DI12 Backup Protection Operated
13 565 +B16.DI1 13/1 565 13 DI13 Unit Tx bucholz
14 566 +B16.DI1 14/1 566 14 DI14 VT fail/ Trip to Manual
15 567 +B16.DI1 15/1 567 15 DI15 Overvolatge
16 568 +B16.DI1 16/1 568 16 DI16 Over current
17 569 569 17 Common For DI 1-DI16
18 570 +B16.DI2 1/1 570 18 DI17 Merz price
19 571 +B16.DI2 2/1 571 19 DI18 Earth fault
20 572 +B16.DI2 3/1 572 20 DI19 Excitation Build up failure
21 573 +B16.DI2 4/1 573 21 20 Rotor earth fault
22 574 +B16.DI2 5/1 574 22 21 Rotor high temp
23 575 +B16.DI2 6/1 575 23 22 Electronic power pack failure
24 576 +B16.DI2 7/1 576 24 23 Convertor line fuse failed
25 577 +B16.DI2 8/1 577 25 24 Convertor surge circuit failure
26 578 +B16.DI2 9/1 578 26 25 Excitation tx high temp
27 579 +B16.DI2 10/1 579 27 26 Thyristor Cooling Fault
1 580 +B16.DI2 11/1 580 28 27 Electronic power supply failure
2 581 +B16.DI2 12/1 581 29 28 Thyristor fault
3 582 +B16.DI2 13/1 582 30 29 AC standby power sup.failure
4 583 +B16.DI2 14/1 583 31 30 DC auxiliary power sup.failure
5 584 +B16.DI2 15/1 584 32 31 Under excitation limit
6 585 +B16.DI2 16/1 585 33 32 Over excitation limit
7 586 +B16.DI2 17/1 586 34 Common +ve for DI’s 17-32
8 587 +B16.DI3 1/1 587 35 33 Thyristor high temp. trip
9 588 +B16.DI3 2/1 588 36 34 Thyristor high temp.alarm
10 589 +B16.DI3 3/1 589 37 35 Excitation in Auto
11 590 +B16.DI3 4/1 590 38 36 Stator current limit
12 +B16.DI3 5/1 39
13 591 +B16.DI3 6/1 591 40 37 Field contactor closed

11multicore cable schedules Page 11 of 14 issued 14/12/01


Refurbishment schematics 3.10 -/conversion/tmp/scratch/424009506.doc-Page 12 of 14

MULTICORE CABLE SCHEDULE


Date: 28/08/2001
From: S800 Panel To: New Relay Panel
Cable no: 4/SP (7.2&7.3) (37) Cores: 1x 37,
Length: 10m Qty: 2 glands

S800 panel New relay


panel S800 Tb
Core Ferru Terminal Term Ferru Term I/O No Designation
numbe le no blok le
r
14 592 +B16.DI3 7/1 592 41 38 Power System Stabilizer fail
15 593 +B16.DI3 8/1 593 42 39 Standby control/manual control
16 594 +B16.DI3 9/1 594 43 40 Sequencer failure
17 595 +B16.DI3 10/1 595 44 41 Incomplete sequence
18 596 +B16.DI3 11/1 596 45 42 Auto synch on
19 597 +B16.DI3 12/1 597 46 43 Ready to synch
20 598 +B16.DI3 13/1 598 47 44 Unit in operation
21 599 +B16.DI3 14/1 599 48 45 Unit at rest available for Start
22 600 +B16.DI3 15/1 600 49 46 Unit start in progress
23 601 +B16.DI3 16/1 601 50 47 Unit Isolated
24 602 +B16.DI3 17/1 602 51 48 Unit start up Auxiliaries
25 603 +B24.DI4 1/1 603 52 Common +ve for DI’s 33-48
26 604 +B24.DI4 2/1 604 53 49 Unit Start up to speed-no load
27 605 +B24.DI4 3/1 605 54 50 Commissioning in progress -Do not
Operate
1 606 +B24.DI4 4/1 606 55 51 Unit at speed no load
2 607 B24.DI4 5/1 607 56 52 Unit Synchronising sequence
3 608 +B24.DI4 6/1 608 57 DI53 Turbine to governor power setting-
generator ready to load vars
4 609 +B24.DI4 7/1 609 58 DI54 Unit Stop in progress
5 610 +B24.DI4 8/1 610 59 DI55 Turbine at rest
6 611 +B24.DI4 9/1 611 60 DI56 Speed signal fault
7 612 B24.DI4 10/1 612 61 DI57 Caution Test mode Enabled
8 613 +B24.DI4 11/1 613 62 DI58 Battery Faulty
9 614 +B24.DI4 12/1 614 63 DI59 Self test
10 615 +B24.DI4 13/1 615 64 DI60 High bearing temp
11 616 +B24.DI4 14/1 616 65 DI61 Gov Low oil Pressue
12 617 +B24.DI4 14/1 617 66 DI62 Gv fail to close
13 618 +B24.DI4 15/1 618 67 DI63 Brake air pressure low
14 619 +B24.DI4 16/1 619 68 DI64 Cooling water failure
15 620 +B24.DI4 17/1 620 69 L2+ COMMON FOR DI 49-64
16 621 +B24.DI5 1/1 621 70 DI65 S/By G.O.P running
17 622 +B24.DI5 2/1 622 71 DI66 Gv fail to open
18 623 +B24.DI5 3/1 623 72 DI67 Shear-pin failure
19 624 +B24.DI5 4/1 624 73 DI68 Stator air temp
20 625 +B24.DI5 5/1 625 74 DI69 Gov oil level low
21 626 +B24.DI5 6/1 626 75 DI70 Brakes fail to operate
22 627 +B24.DI5 7/1 627 76 DI71 Co2 released
23 628 +B24.DI5 8/1 628 77 DI72 Fail to start
24 629 +B24.DI5 9/1 629 78 DI73 Overspeed
25 630 +B24.DI5 10/1 630 79 DI74 Exciter trip to Stand by manual
26 631 +B24.DI5 11/1 631 80 DI75 gen guide bearing oil level

12multicore cable schedules Page 12 of 14 issued 14/12/01


Refurbishment schematics 3.10 -/conversion/tmp/scratch/424009506.doc-Page 13 of 14

MULTICORE CABLE SCHEDULE

Date: 28/08/2001
From: S800 Panel To: New Relay Panel
Cable no: 4/SP (7.3&7.4 &7.5) (37) Cores: 1x 37,
Length: 10m Qty: 2 glands

S800 panel New relay


panel S800 Tb
Core Ferrule no Terminal Term Ferru Term I/O No Designation
num blok le
ber
27 632 +B24.DI5 12/1 632 81 DI76 TGB and GTB oil level
1 633 +B24.DI5 13/1 633 82 DI77 filters clogged/gov problem
2 634 +B24.DI5 14/1 634 83 DI78 Tchwl trip
3 635 +B24.DI5 15/1 635 84 DI79 Brake interlock failure
4 636 +B24.DI5 16/1 636 85 DI80 Urgent Excitation trouble
5 637 +B24.DI5 17/1 637 86 L2+ COMMON FOR DI 65-80
6 638 +B24.DI6 1/1 638 87 DI81 Tcw/Stn Drain sump hwl * Tcw
(2,4,6) Stn-(1,3,5)
7 639 +B24.DI6 2/1 639 88 DI82 Governor failure
8 640 +B24.DI6 3/1 640 89 DI83 Governor fault
9 641 +B24.DI6 4/1 641 90 DI84 C/S supply avail
10 642 +B24.DI6 5/1 642 91 DI85 Unit Tx supply avail
11 643 +B24.DI6 6/1 643 92 DI86 C/S supply on
12 644 +B24.DI6 7/1 644 93 DI87 Unit Tx supply on
13 645 +B24.DI6 8/1 645 94 DI88 Auto/manual**
14 646 +B24.DI6 9/1 646 95 DI89 Remote/local**
15 647 +B24.DI6 10/1 647 96 DI90 Intake gate closed
16 648 +B24.DI6 11/1 648 97 DI91 Intake gate Open
17 649 +B24.DI6 12/1 649 98 DI92 TChwl alarm
18 650 +B24.DI6 13/1 650 99 DI93 Alarm supply fail
19 651 +B24.DI6 14/1 651 100 DI94 Unit tx Co2 released
20 652 +B24.DI6 15/1 652 101 DI95 Unit Tx 380v earth fault
21 653 +B24.DI6 16/1 653 102 DI96 Shutdown relay operated
22 654 +B24.DI6 17/1 654 103 COMMON FOR DI 81-96
23 655 +B24.DO1 1/1 655 104 DO1 Unit Start
24 656 +B24.DO1 2/1 656 105 DO1
25 657 +B24.DO1 3/1 657 106 DO2 Unit Stop
26 658 +B24.DO1 4/1 658 107 DO2
27 659 +B24.DO1 5/1 659 108 DO3 Unit Sycnronise
1 660 +B24.DO1 6/1 660 109 DO3
2 661 +B24.DO1 7/1 661 110 Do4& Interposing Relay for Reset Auto
3 662 +B24.DO1 8/1 662 111 DO4 Sycnh
4 663 B24.DO1 9/1 663 112 Unused
5 664 +B24.DO1 10/1 664 113 DO5

6 665 B24.DO1 11/1 114 DO6 Interposing relay for


7 666 B24.DO1 12/1 115 Open ACB
8 667 B24.DO1 13/1 116 DO7 Interposing Relay for
9 668 B24.DO1 14/1 117 Trip intake gate
10 669 B24.DO1 15/1 118 D08 Spare
11 670 B24.DO1 16/1 119

13multicore cable schedules Page 13 of 14 issued 14/12/01


Refurbishment schematics 3.10 -/conversion/tmp/scratch/424009506.doc-Page 14 of 14

12 671 +B24.DO2 1/1 120 DO9 SPARE


MULTICORE CABLE SCHEDULE
Date: 28/08/2001
From: S800 Panel To: New Relay Panel
Cable no: 4/SP (7.5&7.6 (37) Cores: 1x 37,
Length: 10m Qty: 2 glands

S800 panel New relay panel


S800 Tb
Core Ferrule no Terminal Term Ferrule Term I/O No Designation
num blok
ber
13 672 +B24.DO2 2/1 672 121 DO9 spare
14 673 +B24.DO2 3/1 673 122 DO 10 Spare
15 674 +B24.DO2 4/1 674 123
16 675 +B24.DO2 5/1 675 124 DO11 Spare
17 676 +B24.DO2 6/1 676 125
18 677 +B24.DO2 7/1 677 126 DO12 SPARE
19 678 +B24.DO2 8/1 678 127
20 679 B24.DO2 9/1 679 128 DO13 Spare
21 680 +B24.DO2 10/1 680 129
22 681 B24.DO2 11/1 681 130 DO14 Spare
23 682 B24.DO2 12/1 682 131
24 683 B24.DO2 13/1 683 132 DO15 Spare
25 684 B24.DO2 14/1 684 133
26 685 B24.DO2 15/1 685 134 DO16 Spare
27 686 B24.DO2 16/1 686 135

14multicore cable schedules Page 14 of 14 issued 14/12/01