Telangana State Industrial Infrastructure

Corporation Limited
(A Govt. of Telangana Undertaking)

Development of NIMZ
Near Zaheerabad, Telangana

Proposed ToR for EIA Study


December 2017

L&T Infrastructure Engineering Limited

C1171308
RP001, Rev.0
L&T Infrastructure Engineering Ltd.
Client:
Telangana State Industrial Infrastructure Corporation
Limited
Hyderabad
Project:
Development of NIMZ Near Zaheerabad, Project No.:
Telangana C1171308
Title:
Proposed Terms of Reference (ToR) for Document No.: Rev.:

EIA Study RP001 0


This document is the property of L&T Infrastructure Engineering Ltd. and File path:
must not be passed on to any person or body not authorised by us to receive it l:\ports\2017\c1171308 - eia for zaheerabad nimz\working\reports\form1
nor be copied or otherwise made use of either in full or in part by such person or and tor\draft tor-04.12.2017.docx
body without our prior permission in writing.

Notes:
1.

Revision Details:

SAP
0 05.12.2017 First Submission SNV CVS
BRT
Init. Sign. Init. Sign. Init. Sign.
Rev. Date Details
Prepared Checked Approved
Table of Contents
Development of NIMZ Near Zaheerabad, Telangana C1171308
Proposed Terms of Reference (ToR) for EIA Study RP001 rev. 0

TABLE OF CONTENTS
1 Proposed Terms of Reference for EIA Study ............................................................................. 1
1.1 Introduction to Project .............................................................................................................. 1
1.2 Project Description ................................................................................................................... 1
1.3 Methodology............................................................................................................................. 2
1.3.1 Baseline Environmental Monitoring ............................................................................... 2
1.3.2 Establishment of Baseline Environmental Conditions ................................................... 4
1.3.3 Anticipated Environmental & Social Impacts and their Mitigation Measures ................ 4
1.3.4 Analysis of Alternatives.................................................................................................. 6
1.3.5 Environmental Monitoring Programme .......................................................................... 6
1.3.6 Additional Studies .......................................................................................................... 6
1.3.7 Project Benefits.............................................................................................................. 7
1.3.8 Environmental Management Plan ................................................................................. 7
1.3.9 Structure of EIA Report.................................................................................................. 7

LIST OF FIGURES
FD0101: Project Location
FD0102: Study Area
FD0103: Monitoring Locations

LIST OF TABLES
Table 1-1: Focus Sectors for Investment Envisaged in the proposed NIMZ .......................................... 1

Table of Contents
Page i
Development of NIMZ Near Zaheerabad, Telangana C1171308
Proposed Terms of Reference (ToR) for EIA Study RP001 rev. 0

1 Proposed Terms of Reference for EIA Study


Proposed Terms of Reference (ToR) for EIA study are drawn keeping in view of EIA
Notification, 2006 (as amended) and Standard Terms of Reference (ToR) for EIA/EMP
Report for projects/activities requiring environmental clearance under EIA notification, 2006
released by Ministry of Environment, Forests and Climate Change (MoEF&CC) in April 2015
related to Industrial estates/ parks/ complexes/ areas, export processing Zones (EPZs),
Special Economic Zones (SEZs), Biotech Parks, Leather Complexes and also Township and
Area Development Projects.

1.1 Introduction to Project


Telangana State Industrial Infrastructure Corporation Limited (TSIIC) proposed to establish
National Investment and Manufacturing Zone near Zaheerabad in Nyalkal and Jharasangam
mandals in Sangareddy District of Telangana in an area of 12,635 acres (5,113 ha) in pursuit
of National Manufacturing Policy, 2011 of Government of India (GoI). The policy outlines the
creation of National Investment and Manufacturing Zones (NIMZ) with minimum size of 5,000
hectares as giant industrial Greenfield townships to promote world-class manufacturing
activities. Department of Industrial Policy and Promotion (DIPP), Ministry of Commerce and
Industry, Government of India has accorded Final Approval for Zaheerabad NIMZ on January
22, 2016. The Project Location map is given as Figure FD0101.
TSIIC intends to provide world class eco system for manufacturing industries and proposes
to establish infrastructure facilities for the proposed NIMZ. The infrastructure development
being proposed includes water supply, water distribution, internal roads, storm water drains,
electrical distribution network, internal street lighting, wastewater and waste management
facilities other utilities such as gas/steam supply, technical and support buildings, housing
along with allied facilities.
The total area of the proposed NIMZ is around 12,635 acres for various manufacturing
industrial sectors. Apart from industrial area there will be technical infrastructure facilities,
amenities & utilities, township and logistics facilities. The processing area includes
manufacturing zone for different manufacturing industries and service industry selected
based on the market and demand assessment study undertaken.
The proposed project is attracting the EIA notification, 2006 (as amended) and TSIIC
appointed NABET accredited L&T Infrastructure Engineering Limited (LNTIEL) as
Environmental Consultant for conducting Environmental Impact Assessment (EIA) Study for
the Zaheerabad NIMZ project.

1.2 Project Description


The Proposed NIMZ of 12,635 Acres comprises of manufacturing area along with open
space/green belt, utilities, roads and commercial area. Focus sectors identified based on
Country’s and region’s prima facie strength for NIMZ near Zaheerabad are as follows:
Table 1-1: Focus Sectors for Investment Envisaged in the proposed NIMZ
S. No Target sector list
1 Metals
2 Non-metallic minerals
3 Electrical Equipment
4 Food and Agro processing

1 Proposed Terms of Reference for EIA Study


Page 1
C1171308 Development of NIMZ Near Zaheerabad, Telangana
RP001 rev. 0 Proposed Terms of Reference (ToR) for EIA Study

5 Automobile and machinery


6 Electronics
7 Transport Equipment
8 Logistics and warehousing

Apart from the manufacturing zones, total area is planned for green/open areas, amenities
and utility space, technical and commercial infrastructure to accommodate training centre,
R&D centre, commercial buildings like bank and ATMs, offices, traders, shopping,
maintenance and repair shops, etc. and residential zone.
Utilities are planned and zoned across the project site. It will include water supply system,
sewage network and wastewater treatment facility, waste management facilities, power sub-
station and distribution network, fire station, cold storage facility, raw material bank, etc.
which are discussed in detail in the subsequent sections. Based on the requirement, these
facilities are spread across the project site. Logistic hub will include warehousing, storage
facility, container terminal, truck parking facility, workshops, railway siding infrastructure,
weigh bridge, external physical structure linkages such as Roads, water supply, Power
supply, gas and optical fiber connectivity (OFC) etc.
For residential zone, housing and allied infrastructure like educational facility, health care
facility, crèche, recreational facilities, cultural facilities, playgrounds and community facilities,
etc. are proposed.
The Pre-feasibility Report outlining project details is enclosed as a standalone document.

1.3 Methodology
Methodology to carry out the EIA study involves the following stages:
 Reconnaissance survey and site visits
 Review of available literature
 Compliance to statutory requirements
 Baseline environmental monitoring (Terrestrial environment)
 Identification and Prediction of Impacts
 Hazard Identification, Risk Analysis and Broad Disaster Management Plan
 Environmental Management Plan

1.3.1 Baseline Environmental Monitoring


The baseline environmental studies will be carried out for terrestrial environment. The study
will be a combination of primary (field surveys) and secondary data collection.
Study Period: The proposed study period is winter season (December, 2017 –February,
2018).
Study Area: Study area would be 10 km radius from the boundary of the proposed project
site. A map showing the study area is enclosed as Figure FD0102.

1.3.1.1 Meteorology
Meteorological Parameters such as wind speed, direction, relative humidity, rainfall,
temperature etc., will be recorded by using automatic weather monitoring station in the study
area at One (1) location during the study period. In addition, the general meteorological data
from Climatological Tables of Indian Meteorological Department (IMD) will be reviewed and
presented. For the purpose of carrying out the air quality modelling study, site specific hourly

1 Proposed Terms of Reference for EIA Study


Page 2
Development of NIMZ Near Zaheerabad, Telangana C1171308
Proposed Terms of Reference (ToR) for EIA Study RP001 rev. 0

meteorological data (pre-processed from MM5) for the recent year (2017) will also be
obtained and used.

1.3.1.2 Ambient Air Quality


The ambient air quality monitoring will be carried out as per CPCB/MoEF&CC guidelines.
The locations are identified with regard to the predominant wind direction, topography,
population, sensitive locations and possible impact zones. Ambient Air Quality (AAQ) will be
monitored at Fifteen (15) locations in the study area with twice a week frequency during the
study period during the study period.
As per MoEF&CC National Ambient Air Quality Standards (NAAQS) Notification dated 16th
November, 2009, all twelve (12) parameters will be monitored. The measurement will be
carried out for establishing 24-hourly background concentrations for all parameters except
CO and O3 which will be measured on eight hourly basis on each monitoring day. A map
showing air quality monitoring locations is enclosed as Figure FD0103.

1.3.1.3 Ambient Noise Levels


Noise levels will be measured at Fifteen (15) locations within the study area. The
representative intensity of the noise levels (Peak noise and Equivalent noise levels) will be
measured at hourly intervals for 24 hours once during the study period. Noise level
measurement will be carried out as per the IS: 4954-1968 as adopted by CPCB, and the
CPCB/OSHA Standards using a precision noise/sound level meter. A map showing noise
level monitoring locations is enclosed as Figure FD0103.

1.3.1.4 Inland Water Quality


The study area will be inventoried to identify the sources of water i.e. both surface and
groundwater sources. Water samples will be collected at the identified sources based on the
type of the source, its relevance, number of upstream and downstream users and the type of
the industrial activity in the vicinity. Surface Water Quality will be monitored at Five (05)
locations and groundwater will be monitored at Ten (10) locations within the study area.
The water samples will be collected and analysed, once during the study period, for physico-
chemical and biological characteristics. Water Quality will be monitored adopting procedures
as per IS 3026 and relevant guidelines of MoEF&CC/CPCB. A map showing water quality
monitoring locations is enclosed as Figure FD0103.

1.3.1.5 Soil Quality/Land Environment


The soil types in the study area will be identified based on the review of the available data
supported with information gathered from reconnaissance survey. Soil samples will be
collected at Fifteen (15) locations within the study area. The collected samples will be
analysed once during the season for physico-chemical characteristics. A map showing soil
sampling locations is enclosed as Figure FD0103.
Land use around 15 km radius of project site will be established based on latest satellite
imagery. Necessary features such as National Highways, State Highways, district
road/approach road, river, canal, natural drainage, protected areas under Wild Life
(Protection) Act, archaeological site, natural lake, flood area, human settlements, industries,
high tension electric line, prominent wind direction (summer and winter), effluent drain, if any
and ponds will be presented on the map.

1 Proposed Terms of Reference for EIA Study


Page 3
C1171308 Development of NIMZ Near Zaheerabad, Telangana
RP001 rev. 0 Proposed Terms of Reference (ToR) for EIA Study

1.3.1.6 Terrestrial Ecology


Vegetation pattern will be identified based on literature survey and field investigation. A list of
flora and fauna of terrestrial ecosystem will be prepared. Endangered and dominant plant
species area will be identified. Flora and fauna in project area will be assessed through field
observations and also information collected from secondary sources.
Flora and Fauna: Flora and fauna in study area will be assessed by primary surveys and
collecting secondary information from sources like Forest Department and other agencies
involved in similar studies.
Floral Diversity and Species Inventory
Sampling of vegetation will be carried out using selected samples of 100 m x 10 m belt
transects for tree species, 10 m x 10 m quadrants for shrub species and 1 m x 1 m quadrants
for herb species.
Faunal Diversity and Species Inventory (Vertebrates)
Inventory of animal species will be prepared based on following methodology:
 Direct observation during field visits
 Interviewing local villagers and forest officials
 Secondary sources such as published literature on fauna
Bio-diversity index and relative abundance index of different types of flora will be established.
Canopy cover of trees in different areas will be established. Terrestrial flora and fauna survey
will be carried out as per standard practice.

1.3.1.7 Demography and Socio-economics


The socio-economic conditions in study area will be established through collection and
review of available secondary/ published data and socio-economic data. This will include
 Demographic structure covering total households, total population, population density,
sex ratio, schedule caste and schedule tribe, literacy and occupational pattern and
health status also.
 Cultural and aesthetic attributes in study area including places of historical and
archaeological importance
 Inventory of places of historical, cultural and religious importance in the study area.
 Details of various economic activities, industries if any, shall be collected

1.3.2 Establishment of Baseline Environmental Conditions


The information gathered from secondary/published data and primary surveys will be used
for presenting the baseline environmental and social conditions. The baseline levels will be
compared with the existing standards prescribed by the MoEF&CC/CPCB or TSPCB. Any
critical issues in the baseline environmental conditions will be identified and adequately
addressed in the EIA report.

1.3.3 Anticipated Environmental & Social Impacts and their Mitigation Measures
Environmental attributes likely to be affected by project activities will be identified and
impacts will be assessed. Project activities can be broadly classified into construction and
operation phase activities. Most appropriate and accepted methods will be used to quantify
impacts likely to arise due to development of proposed NIMZ. The mitigation measures
proposed to minimise/avoid each of the likely impacts that occur during construction and
operation phases will be discussed in detail.

1 Proposed Terms of Reference for EIA Study


Page 4
Development of NIMZ Near Zaheerabad, Telangana C1171308
Proposed Terms of Reference (ToR) for EIA Study RP001 rev. 0

1.3.3.1 Air Environment


The construction phase will involve movement of construction materials to the project area,
site clearing, vehicular emissions, emissions from the construction machinery, etc. which in
turn could influence the ambient air quality in the region through build-up of dust levels and
gaseous emission levels. The build-up of pollutants in the ambient air during the construction
phase is temporary in nature and will be localised.
The impact on the air quality during the operation phase will be mainly due to emissions from
boilers, industrial process emissions, D.G sets, vehicular traffic etc., which would result in the
build-up of particulate matter and gaseous emissions. Other fugitive emissions such GHGs
and VOCs will be released from various industrial activities in NIMZ for which suitable
pollution control measures (such as Point of Use Systems etc.) will be suggested in the EIA
report.
An inventory of Significant emission sources shall be made and emissions will be estimated
by taking in to account of control measures proposed and the prediction of ground level
concentrations (GLC) will be carried out using Gaussian Dispersion model such as
ISCST3/AERMOD to predict 24 hourly incremental GLC for the pollutants likely to be
released from the proposed project. Prediction of impacts on the air environment shall be
represented in the form of Isopleths.

1.3.3.2 Noise Levels


Generally, the activities which tend to impact the air environment also equally impact the
noise levels. The impacts on the noise levels during the construction phase could arise from
vehicular traffic, construction machinery, DG sets and transportation of goods to the site.
Further, during the operation phase, noise might be generated due to industrial activities
involved in manufacturing, product handling and transportation and same will be felt upon
work personnel and nearby settlements. Impacts will be evaluated qualitatively taking into
consideration the noise generating sources together with environmental conditions and the
receptors in the project influence area. Suitable mitigation measures shall be suggested in
the EMP.

1.3.3.3 Water Environment


The source of water, requirement vis-à-vis wastewater to be generated along with treatment
facilities, use of treated waste water along with water balance chart taking into account all
forms of water use and management will be presented.
Run-offs containing contaminated water during construction and operation phases of project
can affect the water environment, if not properly controlled. Impacts on the drainage and
water resource of the area and its surrounding will be studied (qualitatively) due to the
proposed project and subsequent mitigation measures shall be accordingly included in the
study. Rainwater harvesting and water conservation measures such as recycle and reuse
options for effluent treatment will be studied.

1.3.3.4 Land Environment


The impacts on the land environment during the construction and operation phase shall
largely result from soil erosion, soil permeability, disposal of construction materials and
change in land use patterns. The impacts on the land environment shall be evaluated
qualitatively considering the activities involved in the construction and operational phases.

1 Proposed Terms of Reference for EIA Study


Page 5
C1171308 Development of NIMZ Near Zaheerabad, Telangana
RP001 rev. 0 Proposed Terms of Reference (ToR) for EIA Study

1.3.3.5 Solid Waste Management


Details of solid and other hazardous/non-hazardous waste generation, handling,
transportation, storage, treatment and disposal will be studied. Suitable mitigation measures
shall be suggested for eco-friendly and sustainable waste management techniques.

1.3.3.6 Ecology
Impact prediction on ecology within the study area will be carried out by analysing likely
changes in sensitive biological indicators. Impact on ecology will be assessed considering
the fact of number of trees/vegetation to be retained/felled or cleared from the Project site
and planned as part of landscape development of the Project site.

1.3.4 Analysis of Alternatives


The analysis of alternatives considered/studied for the development of NIMZ in terms of site
alternatives, connectivity, target sectors, layout etc., shall be given as a part of EIA Report.

1.3.5 Environmental Monitoring Programme


Environmental Monitoring Programme covering the technical aspects (including
methodology, parameters, frequency, location, etc., and budgetary estimates) of monitoring
to check the effectiveness of mitigation measures during construction and operation phases
of the proposed project will be prepared.

1.3.6 Additional Studies

1.3.6.1 Public Consultation


In line with the requirements of EIA Notification, 2006 (as amended) for Category A projects,
Public Hearing for Proposed NIMZ near Zaheerabad will be conducted. For conducting
Public Hearing, the Draft EIA Report will be prepared as per approved ToR and Executive
summaries in English and Local (Telugu) languages will be submitted to Telangana State
Pollution Control Board (TSPCB).

1.3.6.2 Social Impact Assessment


The social impacts associated during construction phase such as land acquisition, R&R
details, impact on local infrastructure, etc. will be provided and social impacts during
operation phase in terms of employment generation and impact on nearby settlements etc.
will be addressed.

1.3.6.3 Risk Analysis


Risk analysis shall be carried out for the project involving storage of hazardous
chemicals/materials and gases. Maximum inventory of storage at site shall be taken into
account. Potential hazards shall be identified. Based on the analysis, appropriate mitigation
measures will be provided.

1.3.6.4 Disaster Management Plan


A Disaster Management Plan (DMP) shall be prepared in conjunction with and taking into
consideration all technical reviews and suggestions as per acceptable norms. A broad
structure of on-site and off-site emergency preparedness plans shall be prepared.
Occupational health and safety aspects shall be covered. Emergency evacuation during
natural and man-made disaster will be covered in DMP.

1 Proposed Terms of Reference for EIA Study


Page 6
Development of NIMZ Near Zaheerabad, Telangana C1171308
Proposed Terms of Reference (ToR) for EIA Study RP001 rev. 0

1.3.7 Project Benefits


The project benefits in terms of improvements in the physical infrastructures and social
infrastructure, employment potential and other tangible benefits of the project will be studied
and details will be presented in the EIA Report. CSR plan covering activities and budget will
be presented.

1.3.8 Environmental Management Plan


An Environmental Management Plan (EMP) will be formulated for the proposed project. EMP
will address mitigation measures for each area i.e. air, water, soil, water environment, solid
waste, green areas, etc. separately, covering all relevant aspects as per the
recommendations and requirement of MoEF&CC. Based on the identified potential impacts
associated with the project, an EMP will be framed for the construction and operation phases
of the project, which will include:
 Pollution abatement and control measures
 Green belt development plan (suggesting suitable species, width of plantation, spacing,
etc.)
 Water recycle/ reuse and rainwater harvesting proposal
 Recommendations of measures for noise abatement
 Recommendations of measures for odour control
 Suitable mitigation measures for various potential impact/Risk causing activities
 Budgetary estimates for implementation
 Institutional mechanism for implementation of EMP

1.3.9 Structure of EIA Report


Based on above tasks, the EIA report will be compiled and submitted to MoEF&CC for
seeking Environmental Clearance. The structure of EIA report is as per the Appendix III of
the EIA Notification, 2006 (as amended) and also Technical EIA Guidance Manual for
Industrial parks released by MoEF&CC in 2010 is given below:
Chapter-I: Introduction – describes the introduction to project, background of study,
scope and objectives of study and approach adopted to carry out the study.
Chapter-II: Project Description – describes the basic features of project, basis and
considerations, NIMZ master Plan details along with other infrastructure such
as Water and Power requirements, Environmental Aspects, Project Schedule
and Cost Estimates
Chapter-III: Description of Environment – describes the baseline environmental status
covering both terrestrial and socio economic environments
Chapter-IV: Anticipated Environmental Impacts & Mitigation Measures – describes the
potential impacts due to project activities on environment and their mitigation
measures
Chapter-V: Analysis of Alternatives – describes the alternative sites or technology
considered if any
Chapter-VI: Environmental Monitoring Programme – describes the technical aspects of
monitoring the effectiveness of mitigation measures (including measurement
methodologies, frequency, location, and detailed budget)
Chapter–VII: Additional Studies – describes social impact assessment, preliminary risk
analysis and DMP
Chapter–VIII: Project Benefits – describes the project benefits including CSR

1 Proposed Terms of Reference for EIA Study


Page 7
C1171308 Development of NIMZ Near Zaheerabad, Telangana
RP001 rev. 0 Proposed Terms of Reference (ToR) for EIA Study

Chapter–IX: Environmental Management Plan – describes the administrative aspects of


ensuring the mitigation measures that are going to be implemented
Chapter–X: Summary and Conclusion – overall justification for implementation of the
project, impact evaluation and mitigation
Chapter–XI: Disclosure of Consultants Engaged – describes the Consultants engaged
with their brief profile and nature of the consultancy rendered.

1 Proposed Terms of Reference for EIA Study


Page 8
FIGURES
KAMAREDDY

KANGTI

KALHER

SIRGAPOOR
L
INDIA A
G
N

AR
NARAYANKHED
NAGILGIDDA TELANGANA
E
MEDAK
B

AB
KARNATAKA STATE
F
1 6 O

IA
MANOOR SH Y
A
B

N S
BIDAR

NH
16
SH

EA
-4 VATPALLY

MANJIRA RIVER
NYALKAL
RAIKODE INDIAN OCEAN
Singur Dam/ ANDOLE
Reservoir
SH-14

NIMZ SITE JHARASANGAM HATHNOORA


PULKAL

MUNIPALLY GUMMADIDALA

ZAHIRABAD NH65
SADASIVPET SANGAREDDY

MOGUDAMPALLY JINNARAM Sangareddy

KOHIR

KANGTI
MALKAJGIRI
KONDAPUR AMEENPUR
PATANCHERU
RANGAREDDY
KARNATAKA STATE

RAMACHANDRA
PURAM HYDERABAD
L&T
Infrastructure Engineering Ltd.

L&T Infra Engineering


L&T Infrastructure
Engineering Ltd.
N

TO UDGIR Karnataka State


Honnikere R.F
Fort

Shia Saint
Khalil Allah
LEGEND:
BIDAR
Tomb Manjira River
Bidar Airport TO Alladurg NIMZ PROJECT SITE
Bidar R.S 10 km Rad
ius from

SH(KA
SH 14 )
Project Bou
ndary
Telangana-Karnataka TELANGANA-KARNATAKA STATE BOUNDARY

4
State Boundary
Check Dam SH 16
near Chinigepalli NATIONAL HIGHWAY
Chitta R.F Check Dam
near Kusnoor Singuru
Sahapur R.F Dam/Reservoir STATE HIGHWAY
Check Dam 5 km Radiu
s fr RAILWAY LINE
near Shamshallapur Project Bou om
Kamthana R.F SCR Vikarabad ndary
Parli Vaijnath Shamshalapur
Branch
5 KM RADIUS FROM BOUNDARY
R.F
Telangana State
10 KM RADIUS FROM BOUNDARY
Check Dam Check Dam
Rajola R.F near Hadnur near Vanampalle
Godepalli R.F 15 KM RADIUS FROM BOUNDARY
Hadnur
R.F FOREST AREA
Kalbemal R.F
PROJECT SITE
Ma WATER BODY
dh
ura
Bagdal R.F Na Gangwar
di Lake
Yelgoi
Lake
Mettalkunta R.S SH )
Bardipur R.F
(TS
14

Honnadi R.F Tadapalli R.F Narinja


Reservoir

Didgi R.F

Zahirabad R.F
Digwal R.F
Kotturu
TO MUMBAI Reservoir
NH 65 ZAHEERABAD

Zaheerabad R.S
NH 65
Gopanpalli R.F
0 km 5 km
TO HYDERABAD Scale
Sekhapur R.F

Source : Survey of India Toposheets


L&T
Infrastructure Engineering Ltd.

L&T Infra Engineering


L&T Infrastructure
Engineering Ltd.
LEGEND: N

NIMZ PROJECT SITE


TO UDGIR Karnataka State
L AAQ, NOISE & SOIL SAMPLING LOCATION
Honnikere R.F
Fort GW GROUND WATER SAMPLING LOCATION
Shia Saint SW SURFACE WATER SAMPLING LOCATION
BIDAR Khalil Allah SW
Tomb Manjira River
Bidar Airport TO Alladurg
Bidar R.S 10 km Rad
ius from
Sampling Locations Details from NIMZ Boundary

SH A)
Project Bou
ndary

(K
Telangana-Karnataka

4
State Boundary
Check Dam SH 16 Location Village Distance(km) Direction
near Chinigepalli Singuru
Chitta R.F
Check Dam Check Dam
near Kusnoor
Dam/Reservoir
L1 & GW1 Project Site - -
near Shamshallapur
Sahapur R.F SW
SCR Vikarabad
WADDI 5 km Radiu
Project Bou
s from L2 & GW2 Mettalkunta Adjacent S
L GW ndary
Parli Vaijnath
Kamthana R.F Branch NYALKAL L L3 & GW3 Yalgul Adjacent W
Shamshalapur
GW L
GUNALLI
R.F
GUNJETTI Telangana State L4 & GW4 Hadnur 0.3 N
TEKUR
L GW
Check Dam L GW L5 & GW5 Rejantal 0.4 E
Rajola R.F near Hadnur
Godepalli R.F
Hadnur
SW HADNUR
L GW
L6 & GW6 Kalbemal 0.8 W
R.F Check Dam
Kalbemal R.F GW
near Vanampalle
L7 & GW7 Gunjetti 0.9 E
Gangwar
Ma KALBEMAL L
dh
ura GW
Tank L
PROJECT SITE
L8 & GW8 Gunalli 1.7 W
Bagdal R.F Na L METTALKUNTA
di
SW GW YALGUL Yelgoi JHARA SANGAM L9 & GW9 Waddi 2.6 N
L L Tank
L GW L
L10 & GW10 2.8 NNE
Mettalkunta R.S
Tekur
SH )
MANHALLI REJANTAL GW Bardipur
(TS
14

Honnadi R.F Tadapalli R.F Narinja R.F


SW Reservoir L11 Manhalli 3.3 SSW
L12 Jhara Sangam 4.3 E
L
BURDIPAR
Didgi R.F
L13 Nyalkal 4.4 N
L14 Burdipar 4.9 S
Zahirabad R.F
Digwal R.F
Kotturu L15 Zaheerabad 9.3 S
TO MUMBAI
Madhura Nadi
Reservoir
NH 65 ZAHEERABAD
L
SW1 near Mettlakunta 0.6 S
R.S
ZAHEERABAD

Zaheerabad R.S Check Dam near


NH 65 SW2 1.0 N
Hadnur
Gopanpalli R.F
TO HYDERABAD
SW3 Narinja Reservoir 1.9 S
Sekhapur R.F 0 km 5 km SW4 Manjeera River 12.5 NE
Source : Survey of India Toposheets Scale SW5 Singur Reservoir 13.0 NE
L&T
Infrastructure Engineering Ltd.

L&T Infra Engineering


L&T Infrastructure
Engineering Ltd.
L&T Infrastructure Engineering Limited
6-3-1192/1/1, 5th Floor, Block No.3,
White House, Kundan Bagh, Begumpet, Hyderabad – 500 016
Ph: 91-040-40354444; Fax: 91-040-40354430