Design of SCADA for remote control and operation of wind power plants (photo
credit: sparesinmotion.com)
Vendors assume the remote operation of wind power plants up to 5 years, but
afterwards, the responsibility of the correct performance of the devices lies with the
owner of the WTG. At that time, and if the company manages several WTG vendors, it is
convenient to implement their own unified SCADA system in order to save money in
terms of simplicity, time savings and increase of hours of operation.
In order to achieve this goal, there are several previous tasks to be done. Firstly, the
scope has to be set and the functional and technical specifications defined.
According to these issues, the necessary devices have to be selected. In addition to this,
signals from different vendors have to be standardized in order to interconnect and
operate every technology from a single SCADA HMI.
Having all this works valued and all necessary devices and installations budgeted, an
economic analysis can be performed in order to evaluate profitability.
Global-network infastructure
But it is still very important to estimate the energy savings derived from the
implementation of the new system. In this context, it is necessary to access the available
historical WTG performance data from the company.
Once performed, it can be seen that remote operation of wind power plants is not only
convenient but necessary. The profitability, in terms of percentage, is very high, much
higher than the WPP projects themselves.
Get Notifications ×
It generates value for the company and increases the whole project profitability, affecting
all the facilities involved. It generates very high yearly revenues compared to the
investment that is relatively low and affordable for the company.
Maintenance and operation expenses, although high, get widely compensated by the
increase in the production, and therefore by the increase in the energy revenues.
It can be concluded that remote 24h/day operation of WPPs with a unified SCADA system is very advantageous
compared with on-site operation by WPP staff, subjected to displacements, timetables and deep knowledge of
technologies.
Get Notifications ×
Design of SCADA for remote supervision and operation of wind
power plants