The DOE fully supports the government’s objective of inclusive growth through our programs and projects
in the grid and off-grid areas towards greater energy access. As of December 2016, the country has reached
90.6% household electrification. However, we are still faced with greater challenges considering the
remaining households are in the far-flung communities and in those areas with peace and order concerns.
The DOE, in collaboration with other government agencies and private entities, are working to achieve the
Administration’s target of 100% household electrification by 2022.
Moving forward, the DOE has cascaded in the preparatory activities with the distribution utilities the 2017
DDP updating to integrate the various energy policy initiatives in their power development planning, giving
equal importance to grid and off-grid areas. These include the optimal power supply mix, Competitive
Selection Process (CSP), Retail Competition and Open Access (RCOA), Renewable Portfolio Standards (RPS),
net metering and energy resiliency. In the long term, we aim to push the distribution utilities to undertake
innovations and initiatives that will result to delivery of electric service to the consumers at par with their
international counterparts.
The DOE acknowledges the support and cooperation of the National Electrification Administration and the
electric distribution utilities in the process of coming up with this integrated 2016-2025 DDP.
ALFONSO G. CUSI
Secretary
CONTENTS
Message from the Secretary i
Contents ii
Tables viii
00 Executive Summary 1
ii
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
3.4. Region II 30
Cagayan I Electric Cooperative, Inc. (CAGELCO I) 31
Cagayan II Electric Cooperative, Inc. (CAGELCO II) 32
Isabela I Electric Cooperative, Inc. (ISELCO I) 33
Isabela II Electric Cooperative (ISELCO II) 34
Nueva Vizcaya Electric Cooperative (NUVELCO) 35
Quirino Electric Cooperative (QUIRELCO) 36
Batanes Electric Cooperative, Inc. (BATANELCO) 37
3.5. Region III 38
Angeles Electric Corporation (AEC) 39
Clark Electric Distribution Corporation (CEDC) 40
Cabanatuan Electric Corporation (CELCOR) 41
Olongapo Electricity Distribution Company, Inc. (OEDC) 42
Subic Enerzone Corporation (SEZ) 43
San Fernando Electric and Power Company, Inc. (SFELAPCO) 44
Tarlac Electric, Inc. (TEI) 45
Aurora Electric Cooperative, Inc. (AURELCO) 46
Nueva Ecija I Electric Cooperative, Inc. (NEECO-I) 47
Nueva Ecija II Electric Cooperative, Inc.- Area 1 (NEECO II-Area 1) 48
Nueva Ecija II Electric Cooperative, Inc. – Area 2 (NEECO II-Area 2) 49
Pampanga I Electric Cooperative, Inc. (PELCO I) 50
Pampanga II Electric Cooperative, Inc. (PELCO II) 51
Pampanga III Electric Cooperative, Inc. (PELCO III) 52
Peninsula Electric Cooperative, Inc. (PENELCO) 53
Pampanga Rural Electric Service Cooperative, Inc. (PRESCO) 54
San Jose City Electric Cooperative (SAJELCO) 55
Tarlac I Electric Cooperative, Inc. (TARELCO I) 56
Tarlac II Electric Cooperative, Inc. (TARELCO II) 57
Zambales I Electric Cooperative, Inc. (ZAMELCO I) 58
Zambales II Electric Cooperative, Inc. (ZAMECO II) 59
3.6. Region IV-A 60
First Bay Power Corporation (FBPC) 67
Ibaan Electric Corporation (IEC) 61
iii
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
iv
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
v
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
vi
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
vii
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
TABLES
2016-2025 DDP Summary Tables 3
Philippine Statistics
Table 1. Total Number of Metered Customer 4
Table 2. Total Energy Sales, MWh 4
Table 3. Energy Purchased, MWh 4
Table 4. Peak Demand per Region, MW 5
Number of Metered Customers
Table 5. Luzon’s Number of Metered Customer 6
Table 6. Visayas’ Number of Metered Customer 6
Table 7. Mindanao’s Number of Metered Customer 6
Energy Sales
Table 8. Luzon’s Energy Sales, MWh 7
Table 9. Visayas’ Energy Sales, MWh 7
Table 10. Mindanao’s Energy Sales, MWh 7
viii
DISTRIBUTION DEVELOPMENT
DEVELOPMENT PLAN,
PLAN,2016-2025
2016-2025
Executive Summary
Executive Summary
1
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Executive Summary
10-year outlook on the DUs’ supply-demand implementation, including the financing
requirements, basic information on their 2015 requirements for electrification projects, network
actual number of customers and energy sales and non-network projects.
for each customer type, system loss, percentage
level of household energization, number of
barangay in the franchise, length of distribution
lines in circuit kilometer, franchise area in square
kilometer and franchise population.
2
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
2016-2025 DDP Summary Tables
2016-2025 DDP
Summary Tables
3
SUMMARY TABLES
Actual Forecasted
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Luzon 51,986,753 54,296,197 56,431,112 58,861,085 61,189,083 63,643,099 66,125,502 68,716,716 71,423,126 74,168,239 76,699,813
Visayas 8,421,837 8,971,145 9,381,314 9,817,151 10,263,417 10,714,642 11,216,912 11,731,774 12,264,466 12,816,146 13,399,210
Mindanao 8,931,850 9,835,184 11,077,943 11,689,321 12,258,946 12,840,149 13,455,146 14,083,579 14,736,261 15,395,803 15,775,009
Total 69,340,440 73,102,526 76,890,369 80,367,558 83,711,446 87,197,890 90,797,560 94,532,069 98,423,854 102,380,188 105,874,032
4
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
5
SUMMARY TABLES
Actual Forecasted
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Luzon 8,630.07 9,087.00 9,467.52 9,877.07 10,263.06 10,648.55 11,075.00 11,499.76 11,943.58 12,369.04 12,876.06
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
NCR 6,298.44 6,618.09 6,847.60 7,107.29 7,351.13 7,593.29 7,879.48 8,159.74 8,454.56 8,727.07 9,075.55
CAR 92.07 92.73 96.95 101.19 105.45 109.73 114.04 118.38 122.74 127.12 131.53
Region 1 361.14 373.94 393.66 412.18 430.50 449.55 469.15 489.23 509.79 530.83 552.32
Region 2 341.88 362.55 393.15 418.72 444.05 469.46 495.08 521.06 547.30 574.33 602.47
Region 3 883.81 947.06 1,007.05 1,066.42 1,116.80 1,165.72 1,209.44 1,255.29 1,303.62 1,353.63 1,405.71
Region 4A 291.42 299.64 308.21 320.94 333.97 347.65 361.66 375.97 390.76 405.82 421.57
Region 4B 127.34 140.32 152.08 164.31 177.03 190.11 203.52 217.21 231.11 245.21 259.49
Region 5 233.96 252.67 268.83 286.03 304.13 323.03 342.64 362.88 383.69 405.01 427.41
Visayas 1,533.98 1,625.73 1,690.22 1,763.24 1,835.24 1,909.15 1,986.82 2,066.99 2,148.40 2,233.80 2,324.46
Region 6 498.34 526.49 546.76 569.92 589.57 608.97 628.44 647.91 667.58 687.29 708.14
Region 7 850.70 902.99 939.04 980.64 1,024.69 1,070.83 1,121.26 1,172.30 1,225.83 1,283.20 1,344.51
Region 8 184.94 196.26 204.41 212.68 220.98 229.36 237.12 246.78 254.99 263.31 271.81
Mindanao 1,600.10 1,761.10 1,957.07 2,051.77 2,141.17 2,237.59 2,337.36 2,440.88 2,542.90 2,646.94 2,713.87
Region 9 185.84 201.31 210.20 219.85 229.77 240.78 252.42 264.69 277.56 291.01 305.04
Region 10 401.88 479.88 595.58 623.72 652.61 682.57 713.09 745.20 773.25 803.73 835.11
Region 11 507.03 538.07 580.09 607.76 634.13 661.01 691.98 722.46 754.34 783.39 774.14
Region 12 299.90 309.03 319.04 329.74 340.36 351.38 362.61 374.04 385.67 397.51 409.50
CARAGA 148.65 160.57 172.19 182.77 193.51 206.92 218.73 230.99 244.21 257.65 271.03
ARMM 56.82 72.25 79.96 87.94 90.78 94.92 98.52 103.50 107.88 113.64 119.05
TOTAL 11,764.15 12,473.83 13,114.81 13,692.08 14,239.46 14,795.28 15,399.17 16,007.64 16,634.89 17,249.78 17,914.39
SUMMARY TABLES
6
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
7
SUMMARY TABLES
Industrial 7,575,080 13,745,990 13,911,674 14,459,381 15,031,691 15,638,855 16,263,893 16,916,248 17,607,316 18,313,260 19,051,483
Others 912,613 945,857 997,435 1,044,234 1,097,980 1,154,179 1,211,661 1,270,936 1,331,657 1,393,806 1,435,181
Total 40,524,422 50,067,592 51,595,707 53,743,238 55,858,983 58,132,918 60,431,983 62,829,051 65,326,995 67,863,020 70,222,446
8
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
NCR REGION I
LUZON
21
1. MERALCO 7. DECORP
Distribution Utilities in the Philippines
8. LUECO
CAR 9. CENPELCO
2. BENECO 10. INEC
3. IFELCO
11. ISECO
4. KAELCO
12. LUELCO
5. MOPRECO
10 16 13. PANELCO I
6. ABRECO
15 14. PANELCO III
6
REGION III 4
11
REGION II
5 18
22. AEC
3 17 15. CAGELCO I
8
23. CEDC
12 2 16. CAGELCO II
24. CELCOR 19 20
13 7 14 17. ISELCO I
25. OEDC 31
9 18. ISELCO II
38 29
26. SEZ 41 39 24
22 28 32 19. NUVELCO
40 43
27. SFELAPCO 42 30
25 34 37 33 20. QUIRELCO
23 35
28. TEI
26 36 1 21. BATANELCO
29. AURELCO 27 51
49
30. NEECO I 64
47 46
31. NEECO II-Area 1 53 44 48 50 68 71
45 66
32. NEECO II-Area 2 54 65 67
56 63
33. PELCO I 61 60 70
55 62
34. PELCO II 69
73
35. PELCO III 59 58
52 72
36. PENELCO
37. PRESCO
REGION IV-A MIMAROPA REGION V
38. SAJELCO
44. FBPC 52. BISELCO 63. ALECO
39. TARELCO I
45. IEC 53. LUBELCO 64. CANORECO
40. TARELCO II 57
46. LEZ 54. MARELCO 65. CASURECO I
41. ZAMECO I
47. BATELEC I 55. OMECO 66. CASURECO II
42. ZAMECO II
48. BATELEC II 56. ORMECO 67. CASURECO III
43. PAMES
49. FLECO 57. PALECO 68. CASURECO IV
50. QUEZELCO I 58. ROMELCO 69. SORECO I
51. QUEZELCO II 59. TIELCO 70. SORECO II
60. Banton 71. FICELCO
61. Concepcion 72. MASELCO
62. Corcuera 73. TISELCO
9
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
REGION VI
35
38
36
2 27
29
4 30
9 24 33
31
3 28
8
20
7 1 10
12
6 5 21 25 32
16 14 37
22 15
11 18
19 17
13
23
26
10
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
REGION IX
Distribution Utilities in the Philippines
MINDANAO
1. ZAMCELCO
2. ZAMSURECO I
3. ZAMSURECO II
4. ZANECO
REGION X REGION XI
5. CEPALCO 15. DLPC 31
6. ILPI 16. DANECO
27
7. BUSECO 17. DASURECO
28
8. CAMELCO 18. DORECO
8
9. FIBECO
25 30
10. LANECO
14
11. MOELCI I 11 5
4 13 26
12. MOELCI II 6 29
12 7
13. MORESCO I 2 10
32 39 9
14. MORESCO II 3 16
19 21 15
18
1
20
33
34 24
17
22
35 23
37
36
38
11
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
12
System Map
NCR
of Distribution
DistributionUtilities
UtilitiesPer Region
13
NCR
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
1
MERALCO
MANILA ELECTRIC COMPANY (MERALCO)
Number of Barangays: Status of Household Energization:
Grid: 4,298 97.3 % (6,768,173 HH / 6,958,185 HH)
BULACAN Off-grid: 36
1
Franchise Area: Customer Captive Customer
Sales (MWh)
9,337.5 sq. km. Classification Connection
2 3
4 Residential 5,295,458 11,116,664
Franchise Population:
5 RIZAL 472,322 12,535,211
28,003,919 Commercial
6
METRO 9 7 Industrial 9,570 5,253,633
MANILA 8
Circuit kilometer:
LEGEND: Others 4,495 188,221
Energized DU System
21,825
10 5,781,845 29,093,729
Substation 11
TOTAL
Backbone Line 12
14 16 Customer/s Served by RES: 360
13 Sales for Customer/s served by RES: 7,526,041 MWh
CAVITE
14
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
CAR
UtilitiesPer Region
DistributionUtilities
of Distribution
Peak
Distribution
Demand 5
System MapCAR
Utility 2
(MW)
1 BENECO 73.82
2 ABRECO 8.89 3
3 MOPRECO 4.78
4 IFELCO 4.57
4
1
5 KAELCO -
Total 92.07
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 294,653 159,852
Commercial 15,836 9,294
Industrial 446 42,646
Others 7,435 260,009
Total 318,370 471,801
15
BENGUET ELECTRIC COOPERATIVE, INC. (BENECO)
Number of Barangays: Status of Household Energization:
Grid: 269 89% (169,708 HH / 190,700 HH)
Off-grid: -
Franchise Area:
2,664 sq. km. Customer Captive Customer
Sales (MWh)
Classification Connection
Franchise Population:
170,749 Residential 157,480 191,684
Commercial 10,809 146,702
Circuit kilometer: Industrial 25 1,786
11.8
Others 2,435 26,518
TOTAL 170,749 366,690
Customer/s Served by RES:
Sales for Customer/s served by RES:
Actual
LEGEND:
Energized DU System
Substation
Backbone Line
Supply
Demand
No. SS Name SS Capacity
1 Bulalacao S/S 3 MVA
2 Atok S/S 5 MVA
3 Lamut S/S 30 MVA
4 NSC S/S 100 MVA
5 Irisan S/S 20 MVA
16
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
17
IFUGAO ELECTRIC COOPERATIVE, INC. (IFELCO)
Number of Barangays: Status of Household Energization:
Grid: 173 87.6 % (35,394 HH / 40,400 HH)
Off-grid: 2
Franchise Area:
2,567 sq. km. Customer Captive Customer
Sales (MWh)
Classification Connection
Franchise Population:
191,078 Residential 29,057 10,962
Commercial 1,292 2,996
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Actual
LEGEND:
Energized DU System Supply
Substation
Backbone Line Demand
Franchise Area:
2,664 sq. km.
Franchise Population:
170,749
Circuit kilometer:
11.8
LEGEND:
Energized DU System
Energized by other system
Substation No. SS Name SS Capacity
Backbone Line 1 Bulanao S/S 10 MVA
18
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
19
MOUNTAIN PROVINCE ELECTRIC COOPERATIVE, INC. (MOPRECO)
Number of Barangays: Status of Household Energization:
Grid: 144 88.3 % (34,269 HH / 38,800 HH)
Off-grid: -
Industrial 0 0
Others 1,173 4,519
TOTAL 35,442 17,145
Customer/s Served by RES:
Sales for Customer/s served by RES:
Circuit kilometer:
139
LEGEND: Supply
Energized DU System
Substation Demand
Backbone Line
Actual
Supply
LEGEND: Demand
Energized DU System
Substation
Backbone Line
20
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Region I
Utilities
I Distribution Per Region
Utilities
Peak 1
of Distribution
Distribution
Demand
Utility
(MW)
Region
1 INEC 50.59
System Map
2 ISECO 46.08
3 LUELCO 37.02 2
4 LUECO 28.94
5 PANELCO III 54.58 4
6 DECORP 61.05
3
7 CENPELCO 62.09
8
8 PANELCO I 20.79 6 5
7
Total 361.14
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 929,277 496,345
Commercial 60,113 153,936
Industrial 1,077 112,901
Others 25,401 979,675
Total 1,015,868 1,742,858
21
DAGUPAN ELECTRIC CORPORATION (DECORP)
Number of Barangays: Status of Household Energization:
Grid: 165 83.9 % (112,248 HH / 133,838 HH)
Off-grid: -
Actual
LEGEND:
Energized DU System
Substation
Supply
Backbone Line
Demand
No. SS Name SS Capacity
22
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
23
LA UNION ELECTRIC COMPANY, INC. (LUECO)
Number of Barangays: Status of Household Energization:
Grid: 139 98.3 % (49,118 HH / 49,961 HH)
Off-grid: -
Industrial 18 18,056
Circuit kilometer:
Others 57 7,913
623.9
TOTAL 42,796 142,354
Customer/s Served by RES:
Sales for Customer/s served by RES:
Actual
LEGEND:
Energized DU System
Supply
Substation
Backbone Line Demand
No. SS Name SS Capacity
24
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
25
ILOCOS NORTE ELECTRIC COOPERATIVE, INC. (INEC)
Number of Barangays: Status of Household Energization:
Grid: 557 93.0 % (153,503 HH / 165,100 HH)
Off-grid: -
Industrial 13 5,013
Franchise Population:
568,017 Others 12,982 12,137
TOTAL 155,492 241,537
Circuit kilometer: Customer/s Served by RES:
2,421.7 Sales for Customer/s served by RES:
Actual
Actual
Supply
Demand
LEGEND:
Energized DU System
Substation
Backbone Line
26
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
27
LA UNION ELECTRIC COOPERATIVE, INC. (LUELCO)
Number of Barangays: Status of Household Energization:
Grid: 536 94.5 % (135,170 HH / 143,000 HH)
Off-grid: -
LEGEND:
Energized DU System
Substation
Backbone Line Actual
Supply
Demand
PANGASINAN I ELECTRIC COOPERATIVE, INC. (PANELCO I)
Number of Barangays: Status of Household Energization:
Grid: 190 95.2 % (76,274 HH / 80,100 HH)
Off-grid: 2
Actual
Supply
Demand
No. SS Name SS Capacity
1 Tara Bolinao S/S 10 MVA
2 San Jose, Bani S/S 5 MVA
3 Palamis Alaminos S/S 15 MVA
4 Bobonot Dasol S/S 10 MVA
28
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
29
PANGASINAN III ELECTRIC COOPERATIVE, INC. (PANELCO III)
Number of Barangays: Status of Household Energization:
Grid: 421 95.5 % (166,961 HH / 174,800 HH)
Off-grid: -
Region II
Per Region
Utilities
1
Utilities
II Distribution
of Distribution
Peak
Distribution
Demand
Utility
(MW)
Region
System Map
1 BATANELCO 1.70
2 CAGELCO II 29.26 2
3 CAGELCO I 45.35 3
4 ISELCO II 36.39
4
5 ISELCO I 72.00 5
6 QUIRELCO 7.61 7
6
7 NUVELCO 22.65
Total 214.94
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 625,486 221,939
Commercial 32,244 140,677
Industrial 1,661 96,415
Others 22,297 483,906
Total 681,688 942,936
30
Region II Distribution Utilities
31
CAGAYAN I ELECTRIC COOPERATIVE, INC. (CAGELCO I)
Number of Barangays: Status of Household Energization:
Grid: 379 96.1 % (133,021 HH / 138,400 HH)
Off-grid: 7
Industrial 63 1,011
Others 3,362 33,588
TOTAL 125,119 198,895
Customer/s Served by RES:
Sales for Customer/s served by RES:
Franchise Area:
4,207 sq. km. LEGEND:
Energized DU System
Franchise Population: Substation
Backbone Line
Actual
593,371
Circuit kilometer:
3,001.3
Supply
Demand
No. SS Name SS Capacity
1 Piat S/S 10 MVA
2 Alcala S/S 5 MVA
3 Solana S/S 15 MVA
4 Tuguegarao S/S (NGCP) 15 MVA
5 Carig S/S 10 MVA
CAGAYAN II ELECTRIC COOPERATIVE, INC. (CAGELCO II)
Number of Barangays: Status of Household Energization:
Grid: 510 91.7 % (116,202 HH / 126,700 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
6,851 sq. km. Sales (MWh)
Classification Connection
Actual
Supply
Demand
No. SS Name SS Capacity
Magapit-Bantay-Zitanga-
- 30MVA
Lucban
- CEZA-Tangatan 15 MVA
- Mission 5 MVA
32
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
33
ISABELA I ELECTRIC COOPERATIVE, INC. (ISELCO I)
Number of Barangays: Status of Household Energization:
Grid: 484 98.6 % (194,839 HH / 197,700 HH)
Off-grid: -
Substation
Backbone Line Industrial 316 66,988
Others 10,242 23,900
TOTAL 180,355 322,460
Customer/s Served by RES:
Sales for Customer/s served by RES:
Franchise Population:
- Actual
Circuit kilometer:
1,763.5
Actual
LEGEND:
Energized DU System
Substation
Backbone Line
Supply
SS Demand
No. SS Name
Capacity
1 San Manuel S/S 10 MVA
2 Roxas S/S 10 MVA
3 Cabagan S/S 10 MVA
4 Ilagan S/S (NGCP) 15MVA
5 Naguilian S/S 5 MVA
34
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
35
NUEVA VIZCAYA ELECTRIC COOPERATIVE, INC. (NUVELCO)
Number of Barangays: Status of Household Energization:
Grid: 255 87.9 % (84,377 HH / 96,000 HH)
Off-grid: 20
Actual
LEGEND:
Energized DU System
Substation
Backbone Line
Supply
Demand
SS
No. SS Name
Capacity
1 Solano S/S 10 MVA
2 Busilac S/S 15 MVA
3 Bambang S/S 10 MVA
QUIRINO ELECTRIC COOPERATIVE, INC. (QUIRELCO)
Number of Barangays: Status of Household Energization:
Grid: 144 95.7 % (46,512 HH / 48,600 HH)
Off-grid: 6
LEGEND:
Demand Annual Average Growth Rate (2016-2025) : 5.04 %
Energized DU System
Substation
Backbone Line
Franchise Population:
163,610
Supply
Circuit kilometer: Demand
1,006.7
SS
No. SS Name
Capacity
1 Cajel S/S 10 MVA
2 San Leonardo S/S 5 MVA
36
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
37
BATANES ELECTRIC COOPERATIVE, INC. (BATANELCO)
Number of Barangays: Status of Household Energization:
Grid: - 94.4 % (5,761 HH / 6,100 HH)
Off-grid: 29
Industrial 0 0
Others 830 1,746
TOTAL 6,264 6,637
LEGEND: Customer/s Served by RES:
Energized DU System Sales for Customer/s served by RES:
Backbone Line
System Loss: 375 MWh (15.39 %)
Actual
Supply
Franchise Area:
219 sq. km. Demand
Franchise Population:
16,000
Circuit kilometer:
-
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Region III
Per Region
Utilities
Utilities
1
III Distribution
of Distribution
2 Peak
Distribution
Demand
4 Utility (MW)
Region
6 7 TEI 59.00
3
System Map
17 5 8 NEECO I 27.07
7
16 9 PELCO I 39.66
8
15 10 PRESCO 7.72
10
9 11 PELCO III 32.11
18 12 11
12 PELCO II 76.31
19
14 13 SFELAPCO 107.97
21 13
20 14 AEC 98.06
Peak 15 CEDC 81.00
Distribution
Demand
Utility (MW) 16 TARELCO II 41.39
1 AURELCO 8.08 17 ZAMECO I 18.61
2 NEECO II-AREA 1 33.41 18 ZAMECO II 24.00
3 NEECO II-AREA 2 35.14 19 OEDC 32.38
4 SAJELCO 18.41 20 SEZ 100.26
5 CELCOR 43.24 21 PENELCO 83.49
6 TARELCO I 43.46 Total 1,010.75
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 625,486 221,939
Commercial 32,244 140,677
Industrial 1,661 96,415
Others 22,297 483,906
Total 681,688 942,936
38
Region III Distribution Utilities
39
ANGELES ELECTRIC CORPORATION (AEC)
Number of Barangays: Status of Household Energization:
Grid: 33 100 % (94,387 HH / 94,387 HH)
Off-grid: -
Circuit kilometer:
514.2
LEGEND: Actual
Energized DU System
Substation
Backbone Line Supply
Demand
SS
No. SS Name
Capacity
1 Milenyo S/S 35 MVA
2 Pampang S/S 50 MVA
3 Calibu S/S 40 MVA
4 Petersville S/S 40 MVA
CLARK ELECTRIC DISTRIBUTION CORPORATION (CEDC)
Number of Barangays: Status of Household Energization:
Grid: 2 -
Off-grid: -
Franchise Area:
45 sq. km. Customer Captive Customer
Sales (MWh)
Classification Connection*
Franchise Population:
- Residential 653 4,004
Commercial 1,066 189,634
Circuit kilometer: Industrial 133 269,289
167.4
Others 62 1,474
TOTAL 1,914 464,401
Customer/s Served by RES: 1
Sales for Customer/s served by RES: 44,999 MWh
Actual
Supply
Demand
40
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
41
CABANATUAN ELECTRIC CORPORATION (CELCOR)
Number of Barangays: Status of Household Energization:
Grid: 89 90.4 % (66,282 HH / 73,354 HH)
Off-grid: -
Industrial 44 12,095
Others 720 9,286
TOTAL 67,095 211,717
Customer/s Served by RES:
Sales for Customer/s served by RES:
Actual
Franchise Area:
192 sq. km.
Franchise Population:
301,612
Circuit kilometer:
Supply
911.1 Demand
SS
No. SS Name
Capacity
1 Bitas S/S 25 MVA
2 Barrera S/S 25 MVA
3 Sumacab S/S 25 MVA
OLONGAPO ELECTRICITY DISTRIBUTION COMPANY, INC. (OEDC)
Number of Barangays: Status of Household Energization:
Grid: 17 96.2 % (61,025 HH / 63,454 HH)
Off-grid: -
LEGEND:
Energized DU System
Substation Supply
Backbone Line
Demand
SS
No. SS Name
Capacity
1 Kale S/S 10 MVA
2 Cbmu S/S 25 MVA
3 Mercurio S/S 2X15 MVA
42
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
43
SUBIC ENERZONE CORPORATION (SEZ)
Number of Barangays: Status of Household Energization*:
Grid: - 100 % (1,861 HH / 1,861 HH)
Off-grid: -
6,306
Industrial 116 439,445
Circuit kilometer: Others 92 2,997
194 3,060 507,037
TOTAL
Customer/s Served by RES:
Sales for Customer/s served by RES:
Actual
Supply
Demand
Actual
Supply
SS Demand
No. SS Name
Capacity
1 Magdalena S/S 40 MVA
2 Greenville S/S 40 MVA
3 Lourdes Height S/S 40 MVA
4 Baliti S/S 31.25 MVA
5 Fortuna S/S 10 MVA
44
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
45
TARLAC ELECTRIC, INC. (TEI)
Number of Barangays: Status of Household Energization:
Grid: 76 100 % (80,020 HH / 80,020 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
395 sq. km. Sales (MWh)
Classification Connection
Franchise Population: Residential 66,960 110,376
406,325 Commercial 4,110 117,986
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Industrial 10 90,566
Circuit kilometer:
1,121.8 Others 37 4,362
TOTAL 71,117 323,290
Customer/s Served by RES:
Sales for Customer/s served by RES:
Actual
LEGEND:
Energized DU System
Substation
Backbone Line
SS
Supply
No. SS Name
Capacity Demand
1 TPC S/S 15/20 MVA
2 Panganiban S/S 20/25 MVA
3 Maliwalo S/S 10 MVA
4 San Rafael S/S 21/28 MVA
5 L.I.P. S/S 25/30 MVA
6 CAT S/S 5 MVA
AURORA ELECTRIC COOPERATIVE, INC. (AURELCO)
Number of Barangays: Status of Household Energization:
Grid: 108 95 % (48,155 HH / 50,700 HH)
Off-grid: 49
Franchise Area:
3,722 sq. km. Customer Captive Customer
Sales (MWh)
Classification Connection
Franchise Population: Residential 34,476 20,195
206,717
Commercial 2,066 4,913
Circuit kilometer: Industrial 131 3,453
1,075.2 Others 1,589 4,193
TOTAL 38,262 32,754
Customer/s Served by RES:
Sales for Customer/s served by RES:
Actual
Supply
Demand
SS
No. SS Name
Capacity
1 San Isidro S/S 10 MVA
46
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
47
NUEVA ECIJA I ELECTRIC COOPERATIVE, INC. (NEECO I)
Number of Barangays: Status of Household Energization:
Grid: 97 97.5 % (87,422 HH / 89,700 HH)
Off-grid: -
Industrial 97 19,261
Circuit kilometer*: 226 2,076
Others
-
TOTAL 76,308 138,728
Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND: Actual
Energized Coop System
Substation
Primary Backbone
Supply
Demand
SS
No. SS Name
Capacity
1 San Isidro S/S 10 MVA
2 Gapan S/S 20 MVA
3 Jaen S/S 20/25 MVA
4 Cabiao S/S 10MVA
NUEVA ECIJA II ELECTRIC COOPERATIVE, INC. (AREA 1) (NEECO II-A1)
Number of Barangays: Status of Household Energization:
Grid: 97 89.4 % (118,399 HH / 132,500 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
5,284 sq. km. Sales (MWh)
Classification Connection
Franchise Population: Residential 104,805 102,500
558,157 Commercial 3,252 7,850
Industrial 588 37,899
Circuit kilometer:
955.78 Others 1,114 4,284
TOTAL 109,759 152,533
Customer/s Served by RES:
Sales for Customer/s served by RES:
Actual
SS
Supply
No. SS Name
Capacity Demand
1 Muños S/S 10 MVA
2 Lupao S/S 10 MVA
3 Talavera S/S 15 MVA
4 Quezon S/S 5 MVA
5 Aliaga S/S 5 MVA
6 Guimba S/S 10 MVA
48
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
49
NUEVA ECIJA II ELECTRIC COOPERATIVE, INC.(AREA 2) (NEECO II-A2)
Number of Barangays: Status of Household Energization:
Grid: 228 92.4 % (98,626 HH / 106,700 HH)
Off-grid: -
LEGEND:
Energized DU System
Substation Actual
Backbone Line
SS Supply
No. SS Name
Capacity
1 San Isidro S/S 5 MVA Demand
2 Pandacaqui S/S 10 MVA
3 San Nicolas S/S 10 MVA
4 Plazang Luma S/S 10MVA
5 Lagundi S/S 10 MVA
6 Sto. Domingo S/S 10 MVA
7 San Luis S/S 5 MVA
50
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
51
PAMPANGA II ELECTRIC COOPERATIVE, INC. (PELCO II)
Number of Barangays: Status of Household Energization:
Grid: 175 98.8 % (157,928 HH / 159,900 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
756 sq. km. Sales (MWh)
Classification Connection
LEGEND:
Actual
Energized DU System
Substation
Backbone Line
SS
Supply
No. SS Name
Capacity Demand
1 Mabalacat S/S 35 MVA
2 Manibaug S/S 10 MVA
3 Pio S/S 15 MVA
4 Guagua S/S 30 MVA
5 Remedios S/S 10 MVA
6 Sta. Cruz S/S 10 MVA
PAMPANGA III ELECTRIC COOPERATIVE, INC. (PELCO III)
Number of Barangays: Status of Household Energization:
Grid: 96 96.6 % (70,636 HH / 73,100 HH)
Off-grid: -
Actual
LEGEND:
Energized DU System
Substation Supply
Backbone Line
Demand
SS
No. SS Name
Capacity
1 Pau S/S 20 MVA
2 Balite S/S 20 MVA
3 Macabebe S/S 10 MVA
52
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
53
PENINSULA ELECTRIC COOPERATIVE, INC. (PENELCO)
Number of Barangays: Status of Household Energization:
Grid: 237 97.6 % (178,244 HH / 182,600 HH)
Off-grid: -
LEGEND:
Energized DU System Actual
Substation
Backbone Line
Supply
Demand
SS
No. SS Name
Capacity
1 Anao S/S 10 MVA
54
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
55
SAN JOSE CITY ELECTRIC COOPERATIVE, INC. (SAJELCO)
Number of Barangays: Status of Household Energization:
Grid: 38 93.0 % (31,622 HH / 34,000 HH)
Off-grid: -
141,581
Industrial 63 31,297
Circuit kilometer: Others 2,009 4,358
216.2
TOTAL 28,944 78,852
Customer/s Served by RES:
Sales for Customer/s served by RES:
Actual
LEGEND: Supply
Energized DU System
Substation Demand
Backbone Line
SS
No. SS Name
Capacity
1 Calaocan S/S 10 MVA
2 Sto. Tomas S/S 15 MVA
TARLAC I ELECTRIC COOPERATIVE, INC. (TARELCO I)
Number of Barangays: Status of Household Energization:
Franchise Area: Grid: 421 97.7 % (159,774 HH / 163,600 HH)
2,000 sq. km. Off-grid: -
Actual
SS
Supply
No. SS Name
Capacity Demand
1 Moncada S/S 5 MVA
2 Camiling S/S 10 MVA
3 Paniqui S/S 15 MVA
4 Gerona S/S 10 MVA
5 Victoria S/S 10 MVA
6 Sta. Ignacia S/S 10 MVA
56
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
57
TARLAC II ELECTRIC COOPERATIVE, INC. (TARELCO II)
Number of Barangays: Status of Household Energization:
Grid: 120 97.7 % (108,035 HH / 110,600 HH)
Franchise Area: Off-grid: -
1,057 sq. km.
Customer Captive Customer
Franchise Population: Sales (MWh)
Classification Connection
465,735
Residential 84,639 107,267
Circuit kilometer: Commercial 5,030 50,094
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
563.1
Industrial 100 51,880
Others 1,048 7,337
TOTAL 90,817 216,578
Customer/s Served by RES: 1
Sales for Customer/s served by RES: 6,008 MWh
LEGEND:
Energized DU System Actual
Substation
Backbone Line
SS
Supply
No. SS Name
Capacity Demand
1 Lapaz S/S 10 MVA
2 Concepcion S/S 20 MVA
3 Capas I S/S 10 MVA
4 Capas II S/S 20 MVA
5 Bamban I S/S 5 MVA
6 Bamban II S/S 5 MVA
ZAMBALES I ELECTRIC COOPERATIVE, INC. (ZAMECO I)
Number of Barangays: Status of Household Energization:
Grid: 118 96.2 % (59,751 HH / 62,100 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
2,448.83 sq. km. Sales (MWh)
Classification Connection
Actual
Supply
Demand
SS
No. SS Name
Capacity
1 Candelaria S/S 10 MVA
2 Salaza S/S 5 MVA
3 Iba S/S 10 MVA
4 Botolan S/S 5 MVA
58
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
59
ZAMBALES II ELECTRIC COOPERATIVE, INC. (ZAMECO II)
Number of Barangays: Status of Household Energization:
Grid: 112 97.3 % (77,240 HH / 79,400 HH)
Off-grid: -
Industrial 84 12,232
Circuit kilometer: 2,747 11,057
Others
760.6
TOTAL 70,168 122,382
Customer/s Served by RES:
Sales for Customer/s served by RES:
Actual
Supply
SS Demand
No. SS Name
Capacity
1 San Felipe S/S 5 MVA
2 San Narciso S/S 10 MVA
3 Castillejos S/S 10 MVA
4 NETC S/S 1.5 MVA
5 Subic S/S 2X10 MVA
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Region IV-A
Utilities
Distribution Per Region
Utilities
Peak
Distribution
Distribution
Demand
Utility (MW)
1
Map ofIV-A
1 QUEZELCO II 7.14
2 BATELEC II 136.00
SystemRegion
3 FLECO 17.76
4 QUEZELCO I 32.69
9 5 BATELEC I 57.43
3 6 LEZ 26.46
7 FBPC 9.88
5 8 IEC 4.06
6 Total 291.42
7 2 4
8 9 MERALCO
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 590,883 305,087
Commercial 22,603 414,193
Industrial 472 113,441
Others 23,204 663,780
Total 637,162 1,496,500
Note: Excluding data for MERALCO
60
Region IV-A Distribution Utilities
61
IBAAN ELECTRIC AND ENGINEERING CORPORATION (IEEC)
Number of Barangays: Status of Household Energization:
Grid: 27 98.4 % (12,251 HH / 12,449 HH)
Off-grid: -
Industrial 37 2,977
Circuit kilometer: Others 64 442
50.2
TOTAL 12,514 21,882
Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND:
Energized DU System
Substation
Actual
Backbone Line
Supply
Demand
SS
No. SS Name
Capacity
1 Palindan S/S 10 MVA
BATANGAS I ELECTRIC COOPERATIVE, INC. (BATELEC I)
Number of Barangays: Status of Household Energization:
Grid: 33 98.2 % (164,587 HH / 167,600 HH)
Off-grid: -
SS
No. SS Name Supply
Capacity
1 Butong S/S 15 MVA Demand
2 Palanas S/S 10 MVA
3 Mataas Na Bayan S/S 10 MVA
4 Calaca Mobile S/S 10 MVA
5 Balayan S/S 15 MVA
6 Calatagan S/S 10 MVA
7 Nasugbu S/S 20 MVA
8 Natipuan S/S 10 MVA
62
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
63
BATANGAS II ELECTRIC COOPERATIVE, INC. (BATELEC II)
Number of Barangays: Status of Household Energization:
Grid: 466 99 % (279,940 HH / 282,700 HH)
Off-grid: 15
LEGEND:
Energized DU System Customer Captive Customer
Substation Sales (MWh)
Classification Connection
Backbone Line
Franchise Area: Residential 222,471 305,282
1,602.21 sq. km. Commercial 8,782 180,573
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Industrial 56 184,120
Franchise Population:
1,089,427 Others 3,577 62,578
TOTAL 234,886 732,554
Circuit kilometer:
Customer/s Served by RES: 1
2,137.1
Sales for Customer/s served by RES: 21,072 MWh
No. SS Name
1 LAUREL SS
2 TALAGA SS
Actual
3 TANAUAN SS
4 MALVAR SS
5 STO. TORIBIO SS
6 SAN CARLOS SS Supply
7 CUENCA SS
8 SAN JOSE SS Demand
9 PADRE GARCIA SS
10 SAN ROQUE SS
11 MASAYA SS
12 SAN JUAN SS
13 TAYSAN SS
14 NAGSAULAY SS
15 MABINI SS
FIRST LAGUNA ELECTRIC COOPERATIVE, INC. (FLECO)
Number of Barangays: Status of Household Energization:
Grid: 164 98.2 % (64,441 HH / 65,600 HH)
Off-grid: -
Actual
Supply
Demand
No. SS
SS Name
Capacity
1 Famy S/S 10 MVA
2 Pakil S/S 5 MVA
3 Lumban S/S 15 MVA
4 Pagsanjan S/S 10 MVA
64
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
65
QUEZON I ELECTRIC COOPERATIVE, INC. (QUEZELCO I)
Number of Barangays: Status of Household Energization:
Grid: 802 88.4 % (161,036 HH / 182,200 HH)
Off-grid: 3
Industrial 81 14,844
Others 3,405 11,716
LEGEND: TOTAL 125,333 132,498
Energized DU System
Substation Customer/s Served by RES:
Backbone Line Sales for Customer/s served by RES:
No. SS
SS Name Supply
Capacity
1 Atimonan S/S 5 MVA
2 Pitogo S/S 5 MVA
Demand
3 Gumaca S/S 5 MVA
4 Hondagua S/S 5 MVA
5 Bacungan S/S 5 MVA
6 Catanauan S/S 5 MVA
7 Mulanay S/S 5 MVA
8 Tagkawayan S/S 5 MVA
QUEZON II ELECTRIC COOPERATIVE, INC. (QUEZELCO II)
Number of Barangays: Status of Household Energization:
Grid: 72 84.1 % (33,453 HH / 39,800 HH)
Off-grid: 57
Franchise Population:
Actual
211,531
Circuit kilometer:
313.3
LEGEND: Supply
Energized DU System
Substation Demand
Backbone Line
No. SS
SS Name
Capacity
1 Comon S/S 5 MVA
2 Capalong S/S 5 MVA
66
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
67
FIRST BAY POWER CORPORATION (FBPC)
Number of Barangays: Status of Household Energization:
Grid: 40 0 % (0 HH / 22,214 HH)
Franchise Area: Off-grid: -
53.31 sq. km.
Customer Captive Customer
Sales (MWh)
Franchise Population: Classification Connection
84,196 Residential 19,820 28,390
Commercial 1,945 17,945
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Circuit kilometer:
33.9 Industrial 0 0
Others 358 2,325
TOTAL 22,123 48,660
Customer/s Served by RES:
Sales for Customer/s served by RES:
Actual
LEGEND:
Energized DU System
Substation
Backbone Line Supply
Demand
No. SS
SS Name
Capacity
1 FBPC S/S 15/18 MVA
LIMA ENERZONE CORPORATION (LEZ)
Number of Barangays: Status of Household Energization:
Grid: - - % (1,861 HH / 1,861 HH)
Off-grid: -
Actual
LEGEND:
Energized DU System Supply
Substation
Backbone Line
Demand
No. SS
SS Name
Capacity
1 LIMA SS 2X50 MVA
68
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
MIMAROPA Region
Utilities Per
Region Distribution Region
Utilities
9
Map of Distribution
7 1
2
8 4 3
Peak 5
Distribution
Demand
MIMAROPA
Utility (MW) 6
10
1 MARELCO 8.57
System
2 Banton 0.22
3 Corcuera 0.31
11
4 Concepcion 0.23
5 ROMELCO 3.42
6 TIELCO 6.14
7 ORMECO 42.70
8 OMECO 17.34
9 LUBELCO 0.80
10 BISELCO 3.93
11 PALECO 43.70
Total 127.34
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 397,754 156,872
Commercial 27,338 56,024
Industrial 712 67,984
Others 12,724 303,337
Total 438,528 584,218
69
BUSUANGA ISLAND ELECTRIC COOPERATIVE, INC. (BISELCO)
Number of Barangays:
Grid: - Status of Household Energization:
76.6 % (12,334 HH / 16,100 HH)
Off-grid: 61
Supply
LEGEND:
Demand
Energized Coop System
Primary Backbone
70
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
71
LUBANG ELECTRIC COOPERATIVE, INC. (LUBELCO)
Number of Barangays: Status of Household Energization:
Grid: - 80.1 % (7,688 HH / 9,600 HH)
Off-grid: 25
Industrial 25 53
Others 181 331
TOTAL 6,562 3,063
Customer/s Served by RES:
Sales for Customer/s served by RES:
Circuit kilometer:
-
Supply
LEGEND: Demand
Energized Coop System
Primary Backbone
MARINDUQUE ELECTRIC COOPERATIVE, INC. (MARELCO)
Number of Barangays: Status of Household Energization:
Grid: - 96.3 % (50,859 HH / 52,800 HH)
Off-grid: 218
Actual
Supply
Demand
LEGEND:
72
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
73
OCCIDENTAL MINDORO ELECTRIC COOPERATIVE, INC. (OMECO)
Number of Barangays: Status of Household Energization:
Grid: - 91.1 % (73,606 HH / 80,800 HH)
Off-grid: 137
Industrial 81 14,129
Others 1,525 6,788
TOTAL 65,647 75,899
Customer/s Served by RES:
Sales for Customer/s served by RES:
Franchise Area:
5,879.85 sq. km.
Franchise Population:
458,494 Actual
Circuit kilometer:
1,102.9
Supply
Demand
LEGEND:
LEGEND:
Energized DU System
Substation
Backbone Line Actual
No. SS Supply
SS Name
Capacity
1 Calapan City S/S
Demand
2 Puerto Galera S/S 10 MVA
3 Naujan S/S 5 MVA
4 Pinamalayan S/S 5 MVA
5 Bansud S/S
6 Roxas S/S 5 MVA
7 Victoria S/S 2.5 MVA
74
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
75
PALAWAN ELECTRIC COOPERATIVE, INC. (PALECO)
Number of Barangays: Status of Household Energization:
Grid: - 57.2 % (121,802 HH / 213,000 HH)
Off-grid: 371
Actual
Supply
Demand
LEGEND:
Franchise Area:
517 sq. km.
Actual
Franchise Population:
-
Circuit kilometer:
378.7 Supply
Demand
LEGEND:
76
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
77
TABLAS ISLAND ELECTRIC COOPERATIVE, INC. (TIELCO)
Number of Barangays: Status of Household Energization:
Grid: - 98.4 % (37,309 HH / 37,900 HH)
Off-grid: 112
152,638
Industrial 126 1,147
Circuit kilometer: Others 1,766 3,543
552.6 TOTAL 35,225 26,866
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized Coop System
System Loss: 2,633 MWh (8.92 %)
Primary Backbone
Actual
Supply
Demand
BANTON ELECTRIC SYSTEM (BANTON)
Number of Barangays: Status of Household Energization:
Grid: - 0 % (0 HH / 1,816 HH)
Off-grid: 112
Actual
Supply
Demand
LEGEND:
78
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
79
CONCEPCION ELECTRIC SYSTEM (CONCEPCION)
Number of Barangays: Status of Household Energization:
Grid: - 100 % (1,294 HH / 1,294 HH)
Off-grid: 9
Industrial 0 0
Others 62 559
TOTAL 1,288 2,773
Customer/s Served by RES:
Sales for Customer/s served by RES:
Franchise Area:
20 sq. km. Actual
Franchise Population:
4,445
Franchise Population:
12,057 Supply
Circuit kilometer: Demand
-
80
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Region V
Utilities
V Distribution Per Region
Utilities
1
of Distribution
Peak
Distribution 4 5
Demand
Utility
(MW)
Region
3
System Map
1 CANORECO 29.57
6
2 CASURECO I 12.91 2
3 CASURECO II 54.65 7
4 CASURECO IV 10.06 8
5 FICELCO 9.13
9
6 CASURECO III -
10
7 ALECO/APEC 70.61
8 SORECO II 20.11
11
9 SORECO I 9.76
10 TISELCO 1.71
11 MASELCO 15.45
Total 233.96
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 744,823 299,794
Commercial 46,751 65,668
Industrial 5,559 115,385
Others 24,515 614,845
Total 821,648 1,095,692
81
ALBAY ELECTRIC COOPERATIVE, INC./ALBAY POWER ENERGY CORPORATION (ALECO/APEC)
Number of Barangays: Status of Household Energization:
Grid: 686 93.8 % (235,235 HH / 250,700 HH)
Off-grid: 34
Actual
No. SS Supply
SS Name
Capacity Demand
1 Malinao S/S 10 MVA
2 Tabaco S/S 40 MVA
3 Sto Domingo S/S 10 MVA
4 Bitano S/S 25 MVA
5 Washington S/S 20 MVA
6 Ligao S/S 15 MVA
7 Polangui S/S 10 MVA
82
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
83
CAMARINES NORTE ELECTRIC COOPERATIVE, INC. (CANORECO)
Number of Barangays: Status of Household Energization:
Grid: 273 94.1 % (108,911 HH / 115,800 HH)
Off-grid: -
-
Industrial 42 5,622
Circuit kilometer: Others 2,127 13,794
- TOTAL 90,201 133,147
Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND:
Energized DU System
Substation Actual
Backbone Line
SS Supply
No. SS Name
Capacity Demand
1 Malatap S/S 5 MVA
2 Sta. Rosa S/S 5 MVA
3 Tawig S/S 5 MVA
4 Talobatib S/S 5 MVA
5 Calintaan S/S 15 MVA
6 Lag-on S/S 10 MVA
CAMARINES SUR I ELECTRIC COOPERATIVE, INC. (CASURECO I)
Number of Barangays: Status of Household Energization:
Grid: 287 81.5 % (71,470 HH / 87,700 HH)
Off-grid: -
Actual
LEGEND:
Energized DU System
Substation
Backbone Line Supply
Demand
No. SS
SS Name
Capacity
1 Sipocot S/S 5 MVA
2 Libmanan S/S 5 MVA
3 Pamplona S/S 10 MVA
84
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
85
CAMARINES SUR II ELECTRIC COOPERATIVE, INC. (CASURECO II)
Number of Barangays: Status of Household Energization:
Grid: 287 95.6 % (113,339 HH / 118,500 HH)
Off-grid: -
No. SS Customer Captive Customer
SS Name Sales (MWh)
Capacity Classification Connection
1 Tinambak S/S 5 MVA
2 Calabanga S/S 10 MVA Residential 87,256 111,328
3 Naga S/S 40 MVA Commercial 5,321 101,248
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Actual
Supply
Demand
CAMARINES SUR III ELECTRIC COOPERATIVE, INC. (CASURECO III)
Number of Barangays: Status of Household Energization:
Grid: 287 87.0 % (73,419 HH / 84,400 HH)
Off-grid: -
Franchise Area:
976 sq. km.
Franchise Population:
LEGEND: No. SS 123,380
Energized DU System
SS Name
Capacity
Substation 1 Bula S/S 7.5 MVA Circuit kilometer:
Backbone Line
2 Iriga S/S 15 MVA 1,155.7
86
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
87
CAMARINES SUR IV ELECTRIC COOPERATIVE, INC. (CASURECO IV)
Number of Barangays: Status of Household Energization:
Grid: 245 84.8 % (58,091 HH / 68,500 HH)
Off-grid: 13
Industrial 39 2,744
Others 1,009 4,159
TOTAL 49,495 41,939
Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND:
Energized DU System
Supply
Substation
Backbone Line Demand
No. SS
SS Name
Capacity
1 Tigaon S/S 5 MVA
2 Lagonoy S/S 5 MVA
SORSOGON I ELECTRIC COOPERATIVE, INC. (SORECO I)
Number of Barangays: Status of Household Energization:
Grid: 253 102.6 % (76,843 HH / 74,900 HH)
Off-grid: -
Actual
LEGEND:
Energized DU System
Supply
Substation
Backbone Line
Demand
No. SS
SS Name
Capacity
1 Sta. Teresita S/S 5 MVA
88
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
89
SORSOGON II ELECTRIC COOPERATIVE, INC. (SORECO II)
Number of Barangays: Status of Household Energization:
Grid: 288 94.1 % (80,236 HH / 85,300 HH)
Off-grid: -
Industrial 14 749
Others 1,791 9,640
TOTAL 77,929 76,660
Customer/s Served by RES:
Sales for Customer/s served by RES:
Franchise Area:
System Loss: 11,783 MWh (12.19 %)
1,134 sq. km.
Circuit kilometer:
741.24 Actual
LEGEND:
Energized DU System
Substation Supply
Backbone Line
Demand
No. SS
SS Name
Capacity
1 Danlog S/S 5 MVA
2 Balogo S/S 2X10 MVA
3 Gubat S/S 5 MVA
FIRST CATANDUANES ELECTRIC COOPERATIVE, INC. (FICELCO)
Number of Barangays: Status of Household Energization:
Grid: - 94.7 % (52,477 HH / 55,400 HH)
Off-grid: 315
Actual
Supply
Demand
LEGEND:
90
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
91
MASBATE ELECTRIC COOPERATIVE, INC. (MASELCO)
Number of Barangays: Status of Household Energization:
Grid: - 60.0 % (59,255 HH / 98,800 HH)
Off-grid: 434
-
Industrial 4,728 4,482
Circuit kilometer: Others 6,288 8,394
- TOTAL 67,518 70,202
Customer/s Served by RES:
Sales for Customer/s served by RES:
Actual
LEGEND: Supply
Energized Coop System Demand
Primary Backbone
TICAO ISLAND ELECTRIC COOPERATIVE, INC. (TISELCO)
Number of Barangays: Status of Household Energization:
Grid: - 70.2 % (10,670 HH / 15,200 HH)
Off-grid: 72
Actual
LEGEND:
Supply
Energized Coop System
Demand
Primary Backbone
92
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Region VI
Utilities
VI Distribution
of Distribution Per Region
Utilities
Peak
Distribution
Demand 1
Utility
(MW)
Region
2
System Map
1 AKELCO 49.53
5
2 CAPELCO 29.57
3 4
3 ANTECO 19.84
6 9
4 ILECO II 29.05 7
8 10
5 ILECO III 14.41
6 ILECO I 46.00
7 PECO 96.05
8 GUIMELCO 6.32 11
9 NONECO 33.74
10 CENECO 132.52
11 NOCECO 41.30
Total 498.34
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 689,972 353,050
Commercial 24,828 263,544
Industrial 1,470 110,139
Others 11,831 679,113
Total 728,101 1,405,846
93
PANAY ELECTRIC COMPANY, INC (PECO)
Number of Barangays: Status of Household Energization:
Grid: 180 86.9 % (95,713 HH / 110,142 HH)
LEGEND:
Off-grid: -
Energized DU System
Substation Customer Captive Customer
Franchise Area: Sales (MWh)
Backbone Line Classification Connection
64 sq. km.
Residential 54,086 155,573
Franchise Population: Commercial 2,912 92,508
-
Jaro Industrial 911 189,296
Circuit kilometer: Others 1,104 30,094
405.3 TOTAL 59,013 467,471
Customer/s Served by RES:
Sales for Customer/s served by RES:
MW
60.00
Supply 40.00
SS Demand 20.00
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Gen. Luna S/S 20 MVA
Supply Indicative 22.80 25.50 30.20 33.90 36.31 38.54 40.81 43.12 45.54 62.94
2 La Paz S/S 50 MVA
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Jaro S/S 10 MVA
Supply Contracted: Captive Customers 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 70.02
4 Mandurriao S/S 25 MVA
Peak Demand: Franchise 96.05 107.80 110.50 115.20 118.90 121.31 123.54 125.81 128.12 130.54 132.95
5 Molo S/S 25 MVA
Peak Demand: Captive Customers 96.05 107.80 110.50 115.20 118.90 121.31 123.54 125.81 128.12 130.54 132.95
94
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
95
AKLAN ELECTRIC COOPERATIVE, INC. (AKELCO)
Boracay
Number of Barangays: Status of Household Energization:
Grid: 378 94.6 % (122,606 HH / 129,600 HH)
Off-grid: 7
583,888
Industrial 27 1,561
Circuit kilometer: Others 2,535 15,586
New Washington 1,766.2 TOTAL 122,565 254,729
Customer/s Served by RES:
Sales for Customer/s served by RES:
MW
30.00
Supply 20.00
SS
No. SS Name Demand 10.00
Capacity
1 Boracay S/S 30 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Caticlan S/S 10 MVA Supply Indicative 3.75 8.94 10.07 11.12 1.11 3.03 4.89 6.70 8.46 10.16
3 Nabas S/S 5 MVA Supply for PSA Approval: Captive Customers 7.00 8.00 9.00 10.00 22.00 22.00 22.00 22.00 22.00 22.00
4 Lezo S/S 5 MVA Supply Contracted: Captive Customers 38.00 38.00 34.00 34.00 34.00 34.00 34.00 34.00 34.00 34.00 34.00
5 Andagao S/S 20 MVA Peak Demand: Franchise 49.53 52.01 54.43 56.77 59.06 61.28 63.44 65.55 67.61 69.62 71.58
6 Altavas S/S 5 MVA Peak Demand: Captive Customers 49.53 48.75 50.94 53.07 55.12 57.11 59.03 60.89 62.70 64.46 66.16
ANTIQUE ELECTRIC COOPERATIVE, INC. (ANTECO)
Number of Barangays: Status of Household Energization:
Grid: 519 93.7 % (98,475 HH / 105,100 HH)
Sebaste
Off-grid: 18
Franchise Population:
Residential 86,431 55,500
497,868 Commercial 2,122 15,273
Industrial 114 3,418
Circuit kilometer:
1,034.5
Others 1,848 11,746
TOTAL 90,515 85,936
Valderrama Customer/s Served by RES:
Sales for Customer/s served by RES:
25.00
Actual
LEGEND: Hamtic
Energized DU System 20.00
Substation Tobias
MW
Backbone Line Fornier 15.00
Supply 10.00
Demand 5.00
SS
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Hamtic S/S 5 MVA Supply Indicative 6.95 8.10 10.76 11.91 13.06 14.22 15.37 16.53 17.68 18.84
2 San Jose S/S 10 MVA Supply for PSA Approval: Captive Customers 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
3 Sibalom S/S 10 MVA Supply Contracted: Captive Customers 21.72 8.50 8.50 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
4 Bugasong S/S 10 MVA Peak Demand: Franchise 19.17 20.73 21.81 22.89 23.98 25.06 26.14 27.22 28.30 29.39 30.47
5 Culasi S/S 5 MVA Peak Demand: Captive Customers 18.82 20.45 21.60 22.76 23.91 25.06 26.22 27.37 28.53 29.68 30.84
96
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
97
CAPIZ ELECTRIC COOPERATIVE, INC. (CAPELCO)
Number of Barangays: Status of Household Energization:
Grid: 454 94.0 % (153,243 HH / 163,000 HH)
Franchise Area:
Off-grid: 19
2,633 sq. km.
Customer Captive Customer
Sales (MWh)
Classification Connection
Franchise Population:
701,664 Residential 125,044 95,349
Commercial 3,916 50,679
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Circuit kilometer:
124.1 Industrial 44 5,875
Others 1,882 16,704
Pres. Roxas
TOTAL 130,886 168,607
Customer/s Served by RES:
Sales for Customer/s served by RES:
MW
20.00
Substation
Backbone Line Supply 15.00
10.00
SS Demand 5.00
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Dao S/S 10 MVA Supply Indicative 0.00 0.00 0.00 0.66 1.66 2.79 3.91 5.12 6.24 22.34
2 Mambusao S/S 5 MVA Supply for PSA Approval: Captive Customers 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
3 Lawaan S/S 30 MVA Supply Contracted: Captive Customers 32.22 31.00 31.00 31.00 31.00 31.00 31.00 31.00 31.00 31.00 16.00
4 Panitan S/S 10 MVA Peak Demand: Franchise 29.57 30.68 31.71 32.66 33.66 34.66 35.79 36.91 38.12 39.24 40.34
5 Pres. Roxas S/S 5 MVA Peak Demand: Captive Customers 29.57 30.68 31.71 32.66 33.66 34.66 35.79 36.91 38.12 39.24 40.34
CENTRAL NEGROS ELECTRIC COOPERATIVE, INC. (CENECO)
Number of Barangays: Status of Household Energization:
Grid: 158 93.5 % (207,644 HH / 222,000 HH)
LEGEND: Off-grid: -
Energized DU System
Substation
Backbone Line Customer Captive Customer
Sales (MWh)
Classification Connection
Residential 154,675 299,812
Commercial 10,878 173,649
Franchise Area:
1,416.5 sq. km. Industrial 141 168,080
Others 580 8,134
Franchise Population: TOTAL 166,274 649,676
212,015
Customer/s Served by RES:
Circuit kilometer: Sales for Customer/s served by RES:
1,186.8
System Loss: 99,912 MWh (13.33 %)
MW
80.00
1 Hilangban S/S 10 MVA
60.00
2 Sum-ag S/S 10 MVA Supply
40.00
3 Alijis S/S 30 MVA
4 Reclamation S/S 20 MVA Demand 20.00
5 Gonzaga S/S 30 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
6 Burgos S/S 30 MVA Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 77.77 78.33 78.73 79.00
7 Mt. View S/S 30 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 Talisay S/S 10 MVA Supply Contracted: Captive Customers 122.90 157.90 137.90 137.90 137.90 137.90 137.90 53.90 53.90 53.90 53.90
9 Panaogao S/S 5 MVA Peak Demand: Franchise 132.52 136.04 138.70 140.81 142.50 143.83 144.88 145.69 146.30 146.75 147.05
10 Lopez S/S 5 MVA Peak Demand: Captive Customers 119.77 122.95 125.35 127.26 128.78 129.99 130.94 131.67 132.23 132.63 132.90
98
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
99
GUIMARAS ELECTRIC CORPORATION (GUIMELCO)
Number of Barangays: Status of Household Energization:
Grid: 95 87.3 % (29,084 HH / 33,300 HH)
Off-grid: 3
162,943
Industrial 29 1,672
Circuit kilometer: Others 550 3,203
662.9
TOTAL 29,517 24,312
LEGEND: Customer/s Served by RES:
Energized DU System
Sales for Customer/s served by RES:
Substation
Backbone Line System Loss: 3,345 MWh (12.09 %)
10.00
Actual
8.00
6.00
MW
4.00
Supply
2.00
Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.29 0.63 0.96 1.29 1.61
SS
No. SS Name Supply for PSA Approval: Captive Customers 4.47 4.82 4.18 4.53 4.88 2.00 2.00 5.00 5.00 5.00
Capacity
Supply Contracted: Captive Customers 5.94 5.94 5.94 5.94 5.94 5.94 5.94 5.94 2.94 2.94 2.94
1 Zaldivar S/S 10 MVA
Peak Demand: Franchise 6.32 6.47 6.82 7.18 7.53 7.88 8.23 8.57 8.90 9.23 9.55
Peak Demand: Captive Customers 6.32 6.47 6.82 7.18 7.53 7.88 8.23 8.57 8.90 9.23 9.55
ILOILO I ELECTRIC COOPERATIVE, INC. (ILECO I)
Number of Barangays: Status of Household Energization:
Grid: 794 94.7 % (142,352 HH / 150,300 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
1,430 sq. km. Sales (MWh)
Classification Connection
Franchise Population: Residential 119,333 123,185
134,753 Commercial 2,279 23,491
Santa
Circuit kilometer: Barbara
Industrial 237 44,799
722.8 Others 1,904 14,409
TOTAL 123,753 205,884
Pavia
Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND: 90.00
Energized DU System
80.00
Substation
Backbone Line 70.00
60.00 Actual
50.00
MW
40.00
Supply 30.00
SS 20.00
No. SS Name Demand
Capacity 10.00
1 Miagao S/S 5 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Tigbauan S/S 10 MVA
Supply Indicative 15.82 19.13 22.42 25.68 28.89 32.05 35.16 38.22 41.22 44.17
3 Oton S/S 10 MVA
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Pavia S/S 10 MVA
Supply Contracted: Captive Customers 33.50 33.50 33.50 33.50 33.50 33.50 33.50 33.50 33.50 33.50 33.50
5 San Miguel S/S 20 MVA
Peak Demand: Franchise 46.00 49.32 52.63 55.92 59.18 62.39 65.55 68.66 71.72 74.72 77.67
6 Sta. Barbaral S/S 10 MVA
Peak Demand: Captive Customers 46.00 49.32 52.63 55.92 59.18 62.39 65.55 68.66 71.72 74.72 77.67
100
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
101
ILOILO II ELECTRIC COOPERATIVE, INC. (ILECO II)
Number of Barangays: Status of Household Energization:
Grid: 578 89.2 % (116,002 HH / 130,100 HH)
Off-grid: 9
Industrial 82 8,009
Others 1,317 13,036
TOTAL 104,564 128,622
Customer/s Served by RES:
Sales for Customer/s served by RES:
60.00
Circuit kilometer:
- 50.00
40.00
Actual
LEGEND:
Energized DU System
MW
30.00
Substation Supply
Backbone Line 20.00
SS Demand 10.00
No. SS Name
Capacity
0.00
1 Calinog S/S 10 MVA 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Passi S/S 10 MVA Supply Indicative 8.60 10.87 17.41 20.21 23.28 26.61 30.20 34.05 38.17 42.56
3 Pototan S/S 10 MVA Supply for PSA Approval: Captive Customers 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
4 Dumangas S/S 15 MVA Supply Contracted: Captive Customers 19.00 18.00 18.00 14.00 14.00 14.00 14.00 14.00 14.00 14.00 14.00
5 Janiuay S/S 5 MVA Peak Demand: Franchise 29.05 29.60 31.87 34.41 37.21 40.28 43.61 47.20 51.05 55.17 59.56
Peak Demand: Captive Customers 29.05 29.60 31.87 34.41 37.21 40.28 43.61 47.20 51.05 55.17 59.56
ILOILO III ELECTRIC COOPERATIVE, INC. (ILECO III)
Number of Barangays: Status of Household Energization:
Grid: 309 88.4 % (77,591 HH / 87,800 HH)
Franchise Area: Off-grid: 31
2,641.9 sq. km. North Giganti
Customer Captive Customer
Sales (MWh)
Franchise Population: Classification Connection
South Giganti
462,191
Calagnaan
Residential 65,151 48,966
Circuit kilometer: Commercial 1,420 7,043
845.4 Industrial 26 8,915
Estancia Others 691 5,361
LEGEND: Sicogon
Energized DU System
TOTAL 67,288 70,285
Substation Customer/s Served by RES:
Backbone Line Sales for Customer/s served by RES:
San Dionisio Pan De Azucar
System Loss: 4,666 MWh (6.23 %)
Matangaban
Demand Annual Average Growth Rate (2016-2025) : 7.07 %
Concepcion 30.00
Igbon
25.00
Tagubanhan 20.00
Actual
15.00
MW
Supply 10.00
Demand 5.00
0.00
SS 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
No. SS Name Supply Indicative 4.76 5.73 8.02 8.02 9.35 11.78 13.35 15.06 16.90 18.92
Capacity
Supply for PSA Approval: Captive Customers 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00
1 Natividad S/S 10 MVA
Supply Contracted: Captive Customers 9.50 9.50 9.50 9.50 9.50 9.50 9.50 9.50 9.50 9.50 9.50
2 Sara S/S 10 MVA
Peak Demand: Franchise 14.41 15.26 16.23 18.52 18.52 19.85 21.28 22.85 24.56 26.40 28.42
3 Pani-an S/S 5 MVA
Peak Demand: Captive Customers 14.41 15.26 16.23 18.52 18.52 19.85 21.28 22.85 24.56 26.40 28.42
102
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
103
NORTHERN NEGROS ELECTRIC COOPERATIVE, INC. (NONECO)
Number of Barangays: Status of Household Energization:
Grid: 194 88.8 % (141,342 HH / 159,200 HH)
Off-grid: 2
MW
20.00
SS
Supply 15.00
No. SS Name 10.00
Capacity Demand
1 Victorias S/S 15 MVA 5.00
2 Manapla S/S 5 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
3 Cadiz S/S 10 MVA Supply Indicative 0.00 2.18 3.40 4.62 11.76 28.06 29.28 30.50 31.63 33.77
4 Lopez S/S 5 MVA Supply for PSA Approval: Captive Customers 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00
5 Sagay S/S 10 MVA Supply Contracted: Captive Customers 25.00 25.00 21.00 21.00 21.00 15.00 0.00 0.00 0.00 0.00 0.00
6 Escalante S/S 5 MVA Peak Demand: Franchise 33.74 34.96 36.18 37.40 38.62 39.76 41.06 42.28 43.50 44.63 46.77
7 San Carlos S/S 20 MVA Peak Demand: Captive Customers 33.74 34.96 36.18 37.40 38.62 39.76 41.06 42.28 43.50 44.63 46.77
NEGROS OCCIDENTAL ELECTRIC COOPERATIVE, INC. (NOCECO)
Pulupandan
Number of Barangays: Status of Household Energization:
8
Valladolid Grid: 308 89.4 % (170,023 HH / 190,100 HH)
San Enrique Off-grid: -
La Castellana
Franchise Area: Customer Captive Customer
Sales (MWh)
4,186 sq. km. Classification Connection
Residential 133,645 116,181
Franchise Population:
1,079,280 Commercial 4,563 29,387
Industrial 21 6,224
Himamaylan City Circuit kilometer: Others 2,801 43,465
2,196.9
TOTAL 141,030 195,258
Customer/s Served by RES:
Kabankalan City Sales for Customer/s served by RES:
40.00
MW
30.00
SS Supply
No. SS Name 20.00
Capacity
1 Sipalay S/S 5 MVA Demand 10.00
2 Cauyan S/S 5 MVA
0.00
3 Kabankalan-Overflow S/S 10 MVA 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
4 Kabankalan - Naga S/S 10 MVA Supply Indicative 18.88 25.06 27.25 29.45 31.64 33.82 36.00 38.15 40.29 52.41
5 Binalbagan S/S 10 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 La Castellana S/S 10 MVA Supply Contracted: Captive Customers 25.00 24.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 10.00
7 San Enrique S/S 10 MVA Peak Demand: Franchise 41.30 42.88 45.06 47.25 49.45 51.64 53.82 56.00 58.15 60.29 62.41
8 Valladolid S/S 10 MVA Peak Demand: Captive Customers 41.30 42.88 45.06 47.25 49.45 51.64 53.82 56.00 58.15 60.29 62.41
104
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Region VII
Per Region
Utilities
Utilities
Peak
Distribution
Demand
Distribution
Utility 1
(MW)
Distribution
1 BANELCO 4.50
2 CEBECO II 52.51
of VII
2 3
Region
3 CELCO 3.00
System Map
5 4
4 CEBECO III 23.03
5 BEZ 28.41 6
7
6 VECO 474.88
8
7 MECO 73.95
10
8 MEZ 22.16 9
13 11
9 CEBECO I 32.92
10 BOHECO II 18.87 12
14
11 BOHECO I 28.60
15
12 BLCI 22.37
13 NORECO I 12.48
14 NORECO II 48.46
15 PROSIELCO 4.56
Total 850.70
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 1,031,760 638,709
Commercial 82,615 2,146,209
Industrial 3,316 173,872
Others 27,650 1,283,008
Total 1,145,341 4,241,798
105
BALAMBAN ENERZONE CORPORATION (BEZ)
Number of Barangays: Status of Household Energization:
Grid: - -
Off-grid: -
MW
15.00
LEGEND:
Supply 10.00
Energized DU System
Substation 5.00
Backbone Line Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 13.49 16.30 16.17 16.17 16.17 16.17 16.17 16.17 16.17 16.17
SS
No. SS Name Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
Supply Contracted: Captive Customers 23.26 18.26 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00 13.00
1 Buanoy S/S 33 MVA
Peak Demand: Franchise 28.41 31.74 29.30 29.17 29.17 29.17 29.17 29.17 29.17 29.17 29.17
2 Arpili S/S 25 MVA
Peak Demand: Captive Customers 28.41 31.74 29.30 29.17 29.17 29.17 29.17 29.17 29.17 29.17 29.17
106
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
107
BOHOL LIGHT COMPANY, INC. (BLCI)
Number of Barangays: Status of Household Energization:
Grid: 15 94.5 % (22,911 HH / 24,253 HH)
Off-grid: -
92,297
Industrial - -
Circuit kilometer: Others 175 11,042
113.2 TOTAL 19,417 104,253
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation
Backbone Line
System Loss: 9,070 MWh (8.00 %)
MW
15.00
Supply 10.00
Demand 5.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 3.26 3.88 10.42 11.11
Supply for PSA Approval: Captive Customers 11.00 11.00 11.00 11.00 11.00 11.00 0.00 0.00 0.00 0.00
SS
No. SS Name Supply Contracted: Captive Customers 23.52 23.52 23.52 23.52 23.52 23.52 23.52 23.52 23.52 17.52 17.52
Capacity
Peak Demand: Franchise 22.37 22.36 23.18 23.92 24.66 25.32 26.12 26.79 27.41 27.95 28.64
1 Dampas S/S 30 MVA
Peak Demand: Captive Customers 22.37 22.36 23.18 23.92 24.66 25.32 26.12 26.79 27.41 27.95 28.64
MACTAN ELECTRIC COMPANY, INC. (MECO)
Number of Barangays: Status of Household Energization:
Grid: 31 94.4 % (104,864 HH / 111,126 HH)
Off-grid: 12
LEGEND:
Customer Captive Customer
Energized DU System Sales (MWh)
Substation Classification Connection
Backbone Line
Residential 81,802 151,736
Commercial 3,957 18,603
Industrial 885 230,770
Others 348 18,631
TOTAL 86,992 419,740
Customer/s Served by RES:
Olango Island
Sales for Customer/s served by RES:
100.00
Franchise Population: Actual
350,467 80.00
MW
60.00
Circuit kilometer:
259.7 Supply 40.00
Demand 20.00
SS
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 CLIP S/S 30 MVA Supply Indicative 6.04 10.07 13.00 15.78 17.56 34.13 66.08 70.43 73.44 77.62
2 Basak S/S 20 MVA Supply for PSA Approval: Captive Customers 12.00 12.00 12.00 12.00 12.00 0.00 0.00 0.00 0.00 0.00
3 Load End S/S 10 MVA Supply Contracted: Captive Customers 73.26 43.00 43.00 43.00 43.00 43.00 43.00 15.00 15.00 15.00 15.00
4 Airport S/S 10 MVA Peak Demand: Franchise 73.16 79.15 84.20 87.95 91.33 93.51 99.29 104.20 109.60 113.33 118.15
5 Mactan S/S 20 MVA Peak Demand: Captive Customers 73.95 61.04 65.07 68.00 70.78 72.56 77.13 81.08 85.43 88.44 92.62
108
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
109
MACTAN ENERZONE CORPORATION (MEZ)
Number of Barangays: Status of Household Energization:
Grid: - -
Off-grid: -
25.00
Actual
20.00
15.00
MW
10.00
LEGEND:
Supply
5.00
Energized DU System Demand
Substation
Backbone Line 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.83 0.15 1.72 10.68 10.29 9.18 10.30 11.45
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SS
No. SS Name Supply Contracted: Captive Customers 22.80 20.00 20.00 20.00 20.00 20.00 10.00 10.00 10.00 10.00 10.00
Capacity
Peak Demand: Franchise 22.16 19.58 19.89 20.83 20.15 21.72 20.68 20.29 19.18 20.30 21.45
1 MEZ S/S 58 MVA
Peak Demand: Captive Customers 22.16 19.58 19.89 20.83 20.15 21.72 20.68 20.29 19.18 20.30 21.45
VISAYAN ELECTRIC COMPANY, INC. (VECO)
SS Number of Barangays: Status of Household Energization:
No. SS Name
Capacity Grid: 232 97.1% (498,780 HH / 513,537 HH)
1 Consolacion S/S 33 MVA Off-grid: -
2 Cabancalan S/S 33 MVA
3 Pakna-an S/S 33 MVA Customer Captive Customer
4 Banilad S/S 33 MVA Sales (MWh)
Classification Connection
5 Mandaue S/S 33 MVA
6 MRA S/S 33 MVA Residential 353,485 704,338
7 Mabolo S/S 33 MVA Commercial 40,421 384,461
8 Ayala S/S 33 MVA
9 Camputhaw S/S 33 MVA Industrial 1,646 1,470,572
10 Lorega S/S 33 MVA Others 138 26,332
11 Calamba S/S 33 MVA
TOTAL 395,690 2,585,704
12 Don Gil Garcia S/S 33 MVA
13 Pardo S/S 33 MVA Customer/s Served by RES:
14 Talisay S/S 33 MVA Sales for Customer/s served by RES:
16 Naga S/S 33 MVA
System Loss: 211,770 MWh (7.57 %)
MW
300.00
Supply 200.00
110
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
111
BOHOL I ELECTRIC COOPERATIVE, INC. (BOHECO I)
Number of Barangays: Status of Household Energization:
Grid: 593 94.3 % (149,823 HH / 158,900 HH)
Franchise Area:
1,914 sq. km. Off-grid: 10
2,324.76
Industrial 45 29,373
Others 11,988 9,385
TOTAL 134,737 145,558
Customer/s Served by RES:
Sales for Customer/s served by RES:
MW
20.00
Supply 15.00
SS 10.00
No. SS Name Demand 5.00
Capacity
1 Maribojoc S/S 5 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Maca-as S/S 10 MVA Supply Indicative 3.21 3.93 4.91 2.69 4.47 6.26 8.05 9.84 25.63 39.42
3 Carmen S/S 5 MVA Supply for PSA Approval: Captive Customers 5.00 6.00 8.00 12.00 12.00 12.00 12.00 12.00 12.00 0.00
4 Loay S/S 10 MVA Supply Contracted: Captive Customers 22.76 22.71 22.72 21.50 21.50 21.50 21.50 21.50 21.50 7.50 7.50
5 Dampas S/S 10 MVA Peak Demand: Franchise 28.23 30.47 32.12 33.78 35.43 37.07 38.69 40.30 41.90 43.47 45.03
6 Panglao S/S 10 MVA Peak Demand: Captive Customers 28.60 30.91 32.65 34.41 36.19 37.97 39.76 41.55 43.34 45.13 46.92
BOHOL II ELECTRIC COOPERATIVE, INC. (BOHECO II)
Banacan Island Number of Barangays: Status of Household Energization:
Mahanay Island Grid: 465 96.1 % (127,299 HH / 132,500 HH)
Hundayan Island Off-grid: 26
Jao Island
Bien Unido
Customer Captive Customer
Sales (MWh)
Classification Connection
Pres. Carlos P. Garcia Residential 101,493 55,266
Commercial 4,505 10,310
Industrial 320 12,901
Others 4,989 7,928
TOTAL 111,307 86,405
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation System Loss: 9,022 MWh (9.45 %)
Backbone Line
MW
Valencia
35.8
Supply 10.00
SS Demand 5.00
No. SS Name
Capacity
1 Mahayag S/S 5 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Trinidad S/S 10 MVA Supply Indicative 9.91 10.03 10.42 0.00 0.00 0.00 0.00 0.34 12.73 13.11
3 Imelda S/S 5 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 12.00 12.00 12.00 12.00 12.00 0.00 0.00
4 Alicia S/S 5 MVA Supply Contracted: Captive Customers 25.80 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
5 Guindulman S/S 5 MVA Peak Demand: Franchise 18.87 19.91 20.03 20.42 20.80 21.19 21.57 21.96 22.34 22.73 23.11
6 Garcia S/S 5 MVA Peak Demand: Captive Customers 18.87 19.91 20.03 20.42 20.80 21.19 21.57 21.96 22.34 22.73 23.11
112
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
113
CEBU I ELECTRIC COOPERATIVE, INC. (CEBECO I)
Number of Barangays: Status of Household Energization:
Grid: 366 96.9 % (133,233 HH / 137,500 HH)
Off-grid: -
734,047
Industrial 33 6,602
Circuit kilometer: Others 3,575 41,969
1,718.7 TOTAL 119,232 164,394
LEGEND: Customer/s Served by RES:
Energized DU System
Sales for Customer/s served by RES:
Substation
Backbone Line System Loss: 18,137 MWh (9.94 %)
60.00
50.00
Actual
40.00
30.00
MW
SS
No. SS Name Supply 20.00
Capacity
1 Dumanjug S/S 10 MVA Demand 10.00
2 Samboan S/S 5 MVA
3 Dalaguete S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
4 Sibonga S/S 5 MVA Supply Indicative 5.74 7.82 7.86 9.86 11.81 13.71 25.57 27.38 29.14 30.87
5 Carcar 1 S/S 5 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
6 Carcar 2 S/S 10 MVA Supply Contracted: Captive Customers 22.15 22.15 22.15 22.15 22.15 22.15 22.15 12.15 12.15 12.15 12.15
7 Steel Asia S/S 10 MVA Peak Demand: Franchise 32.92 34.85 36.93 38.98 40.98 42.93 44.83 46.69 48.49 50.26 51.98
8 CP KELCO S/S 3.75 MVA Peak Demand: Captive Customers 32.92 27.89 29.97 32.01 34.01 35.96 37.86 39.72 41.53 43.29 45.02
CEBU II ELECTRIC COOPERATIVE, INC. (CEBECO II)
Number of Barangays: Status of Household Energization:
Daanbantayan 97.9 % (149,047 HH / 152,200 HH)
Grid: 320
Off-grid: 3
MW
60.00
Compostela
Supply
Franchise Area: 40.00
1,235 sq. km. Demand 20.00
0.00
Franchise Population: 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
149,047 Supply Indicative 28.24 32.53 33.73 40.41 48.18 57.16 82.49 94.32 107.81 123.17
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Circuit kilometer: Supply Contracted: Captive Customers 35.51 26.00 25.00 28.00 28.00 28.00 28.00 13.00 13.00 13.00 13.00
3,837.1 Peak Demand: Franchise 52.51 54.24 57.53 61.73 68.41 76.18 85.16 95.49 107.32 120.81 136.17
Peak Demand: Captive Customers 52.51 54.24 57.53 61.73 68.41 76.18 85.16 95.49 107.32 120.81 136.17
114
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
115
CEBU III ELECTRIC COOPERATIVE, INC. (CEBECO III)
Number of Barangays: Status of Household Energization:
Grid: 134 100.1 % (90,790 HH / 90,700 HH)
Off-grid: -
Industrial 28 14,167
Circuit kilometer: Others 1,293 39,391
3.7
TOTAL 78,757 140,789
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation
Backbone Line System Loss: 12,176 MWh (7.96 %)
30.00
Actual
25.00
20.00
15.00
MW
Supply 10.00
Demand 5.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 6.26 6.49 6.75 7.02 7.32 7.65 8.02 8.44 8.91 9.44
SS
No. SS Name Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
Supply Contracted: Captive Customers 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00
1 Toledo S/S 20 MVA
Peak Demand: Franchise 23.03 23.26 23.49 23.75 24.02 24.32 24.65 25.02 25.44 25.91 26.44
2 Balamban S/S 10 MVA
Peak Demand: Captive Customers 23.03 23.26 23.49 23.75 24.02 24.32 24.65 25.02 25.44 25.91 26.44
NEGROS ORIENTAL I ELECTRIC COOPERATIVE, INC. (NORECO I)
Number of Barangays: Status of Household Energization:
Grid: 285 78.8 % (72,090 HH / 91,500 HH)
Canlaon City Off-grid: -
Vallehermoso
18.00
16.00
14.00 Actual
12.00
10.00
MW
8.00
Supply 6.00
4.00
Demand 2.00
SS 0.00
No. SS Name 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Capacity Supply Indicative 0.82 2.36 6.78 6.94 7.24 3.23 3.52 3.81 4.10 4.37
1 Guihulngan S/S 10 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 7.00 7.00 7.00 7.00 7.00
2 Bindoy S/S 5 MVA Supply Contracted: Captive Customers 11.70 11.70 10.70 6.70 6.70 6.70 4.00 4.00 4.00 4.00 4.00
3 Mabinay S/S 3.75 MVA Peak Demand: Franchise 12.48 12.53 13.06 13.48 13.64 13.94 14.23 14.52 14.81 15.10 15.37
4 Bais S/S 5 MVA Peak Demand: Captive Customers 12.48 12.53 13.06 13.48 13.64 13.94 14.23 14.52 14.81 15.10 15.37
116
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
117
NEGROS ORIENTAL II ELECTRIC COOPERATIVE, INC. (NORECO II)
Number of Barangays: Status of Household Energization:
Grid: 272 89.1 % (141,009 HH / 158,200 HH)
Off-grid: -
569,809
Industrial 146 4,424
Circuit kilometer: Others 2,117 71,707
2,009.6
TOTAL 141,012 245,508
Customer/s Served by RES:
Sales for Customer/s served by RES:
80.00
LEGEND: 70.00
Energized DU System Actual
Substation 60.00
Backbone Line 50.00
40.00
MW
SS Supply 30.00
No. SS Name
Capacity 20.00
1 Banaba S/S 3.75 MVA Demand 10.00
2 Tanjay S/S 10 MVA
3 Pulantubig-1 S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
4 Pulantubig-2 S/S 20 MVA Supply Indicative 12.01 14.22 16.39 18.50 20.56 22.55 32.68 34.55 36.36 38.12
5 Bagacay S/S 20 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 Dauin S/S 4.2 MVA Supply Contracted: Captive Customers 33.20 33.20 33.20 33.20 33.20 33.20 33.20 25.00 25.00 25.00 25.00
7 Siaton S/S 10 MVA Peak Demand: Franchise 48.46 50.77 53.08 55.35 57.56 59.70 61.78 63.80 65.76 67.66 69.51
8 Bayawan S/S 10 MVA Peak Demand: Captive Customers 48.46 45.21 47.42 49.59 51.70 53.76 55.75 57.68 59.55 61.36 63.12
BANTAYAN ISLAND ELECTRIC COOPERATIVE, INC. (BANELCO)
Number of Barangays: Status of Household Energization:
Grid: - 91.5% (24,971 HH / 27,300 HH)
Off-grid: 49
9.00
8.00
7.00
6.00
Actual
LEGEND: 5.00
MW
Energized DU System 4.00
Substation Supply 3.00
Backbone Line
2.00
Demand 1.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS
No. SS Name Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 6.88 7.23 7.58 7.92
1 BIPCOR 8.33 MVA Supply Contracted: Captive Customers 5.17 5.18 5.49 5.51 5.85 6.19 6.53 0.00 0.00 0.00 0.00
2 NPC-SPUG Doong 0.300 MVA Peak Demand: Franchise
3 NPC-SPUG Kinatarcan 0.300 MVA Peak Demand: Captive Customers 4.50 4.87 5.18 5.51 5.84 6.18 6.53 6.87 7.22 7.57 7.92
118
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
119
CAMOTES ELECTRIC COOPERATIVE, INC. (CELCO)
Number of Barangays: Status of Household Energization:
Grid: - 85.7% (19,292 HH / 22,500 HH)
Off-grid: 56
Franchise Area:
14.2 sq. km. Customer Captive Customer
Sales (MWh)
Classification Connection
Franchise Population:
Residential 17,965 6,284
138,000
Commercial 779 2,445
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
MW
4.00
Energized DU System Supply
Substation 3.00
Backbone Line Demand 2.00
1.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.53 0.93 4.62 5.24 5.89 6.55 7.23 7.92 8.61 9.30
SS
No. SS Name Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
Supply Contracted: Captive Customers 3.10 2.94 3.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Camotes S/S 2.7 MVA
Peak Demand: Franchise
2 Pilar S/S 1.45 MVA
Peak Demand: Captive Customers 3.00 3.47 4.02 4.62 5.24 5.89 6.55 7.23 7.92 8.61 9.30
PROVINCE OF SIQUIJOR ELECTRIC COOPERATIVE, INC. (PROSIELCO)
Number of Barangays: Status of Household Energization:
Grid: - 89.8 % (23,791 HH / 26,500HH)
Off-grid: 134
LEGEND:
Energized DU System
Substation Enrique Customer Captive Customer
Villanueva
Sales (MWh)
Backbone Line Classification Connection
Residential 19,272 8,782
Commercial 1,828 3,354
Industrial 167 510
Others 1,128 5,153
TOTAL 22,395 17,800
Customer/s Served by RES:
Sales for Customer/s served by RES:
9.00
Franchise Area: 8.00
343 sq. km. 7.00
6.00
Franchise Population: Actual
5.00
291,066
MW
4.00
Supply 3.00
Circuit kilometer:
227.9 2.00
Demand 1.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
1 SIPCOR - Candanay 4.1 MVA Supply Contracted: Captive Customers 4.56 4.71 4.87 5.25 5.65 6.07 6.49 6.92 7.35 7.79 8.26
Peak Demand: Franchise
2 SIPCOR - Tignao 4.1 MVA
Peak Demand: Captive Customers 4.56 4.71 4.87 5.25 5.65 6.07 6.49 6.92 7.35 7.79 8.26
120
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Region VIII
Per Region
Utilities
Utilities
Peak
Distribution
Distribution
Demand
Distribution
Utility
(MW)
1
1 NORSAMELCO 15.27
Map of VIII
2 SAMELCO I 10.67 2
System Region
3 SAMELCO II 12.92
4 ESAMELCO 15.54 6 3
5 BILECO 6.62 5 4
6 MMPC 0.16 9
8
7 LEYECO V 34.32 7
8 LEYECO III 7.22 10
9 LEYECO II 40.30
10 DORELCO 12.43 11
12
11 LEYECO IV 11.30
12 SOLECO 18.19
Total 184.94
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 693,481 112,904
Commercial 25,243 117,167
Industrial 2,705 111,498
Others 18,402 464,545
Total 739,830 806,115
121
BILIRAN ELECTRIC COOPERATIVE, INC. (BILECO)
Number of Barangays: Status of Household Energization:
Grid: 115 92.8 % (31,453 HH / 33,900 HH)
Off-grid: 2
Franchise Area:
Demand Annual Average Growth Rate (2016-2025) : 5.67 %
511.4 sq. km.
14.00
Franchise Population: 12.00
163,556
10.00
Circuit kilometer: 8.00
Actual
305.9
MW
6.00
Supply 4.00
LEGEND:
Energized DU System Demand 2.00
Substation
Backbone Line 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 2.07 4.54 5.02 0.00 0.00 0.00 0.00 0.49 0.98 1.48
SS Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name
Capacity Supply Contracted: Captive Customers 4.00 5.00 3.00 3.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
1 San Roque S/S 10 MVA Peak Demand: Franchise 6.62 7.07 7.54 8.02 8.50 8.99 9.49 9.99 10.49 10.98 11.48
Peak Demand: Captive Customers 6.62 7.07 7.54 8.02 8.50 8.99 9.49 9.99 10.49 10.98 11.48
122
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
123
DON ORESTES ROMULADEZ ELECTRIC COOPERATIVE, INC. (DORELCO)
Number of Barangays: Status of Household Energization:
Grid: 499 75.3 % (61,787 HH / 82,100 HH)
Off-grid: -
408,639
Industrial 10 6,365
Circuit kilometer: Others 1,239 3,726
- TOTAL 61,788 52,993
Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND:
Energized DU System
System Loss: 7,558 MWh (12.48 %)
Substation
Backbone Line
Demand Annual Average Growth Rate (2016-2025) : 4.28 %
20.00
18.00
16.00
14.00 Actual
12.00
10.00
MW
8.00
Supply 6.00
4.00
Demand 2.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 3.19 5.72 6.25 12.78 15.31 15.84 16.37 16.90 17.43 17.96
SS Supply for PSA Approval: Captive Customers 5.00 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name
Capacity Supply Contracted: Captive Customers 8.00 5.00 2.00 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Tolosa S/S 10 MVA Peak Demand: Franchise 12.43 14.05 14.58 15.12 15.65 16.18 16.71 17.24 17.77 18.30 18.83
2 Javier S/S 5 MVA Peak Demand: Captive Customers 12.43 13.19 13.72 14.25 14.78 15.31 15.84 16.37 16.90 17.43 17.96
EASTERN SAMAR ELECTRIC COOPERATIVE, INC. (ESAMELCO)
Jipapad Number of Barangays: Status of Household Energization:
Grid: 570 92.8 % (83,364 HH / 89,800 HH)
San Policarpio
Off-grid: 26
MW
10.00
Homonhon Supply
Caliloan Island Island 5.00
Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS
No. SS Name Supply Indicative 4.82 5.65 5.53 3.41 4.29 5.17 6.04 6.90 7.76 8.63
Capacity
Supply for PSA Approval: Captive Customers 0.00 11.00 12.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00
1 Taft S/S 5 MVA
Supply Contracted: Captive Customers 8.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Cabong S/S 15 MVA
Peak Demand: Franchise 15.54 15.82 16.65 17.53 18.41 19.29 20.17 21.04 21.90 22.76 23.63
3 Buenavista S/S 5 MVA Peak Demand: Captive Customers 15.54 15.82 16.65 17.53 18.41 19.29 20.17 21.04 21.90 22.76 23.63
124
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
125
LEYTE II ELECTRIC COOPERATIVE, INC. (LEYECO II)
Number of Barangays: Status of Household Energization:
Grid: 196 83.7 % (57,364 HH / 68,500 HH)
Off-grid: -
-
Industrial 802 60,242
Circuit kilometer: Others 694 16,870
- TOTAL 56,570 169,423
Customer/s Served by RES:
Sales for Customer/s served by RES:
Tacloban City
System Loss: 21,723 MWh (11.20 %)
30.00
MW
Supply 20.00
10.00
Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 14.38 12.38 12.54 18.74 19.97 20.48 22.85 23.67 24.51 25.36
No. SS Name
Capacity Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Abucay S/S 20 MVA Supply Contracted: Captive Customers 26.00 27.00 28.00 29.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
2 Sagkahan S/S 20 MVA Peak Demand: Franchise 40.30 41.38 42.56 43.72 44.92 46.15 46.66 49.03 49.85 50.69 51.54
3 Campetic S/S 20 MVA Peak Demand: Captive Customers 40.30 41.38 40.38 41.54 42.74 43.97 44.48 46.85 47.67 48.51 49.36
LEYTE III ELECTRIC COOPERATIVE, INC. (LEYECO III)
Number of Barangays: Status of Household Energization:
Grid: 285 91.9 % (47,982 HH / 52,200 HH)
LEGEND:
Energized DU System
Off-grid: -
Substation
Backbone Line Customer Captive Customer
Sales (MWh)
Classification Connection
Residential 46,112 23,073
Commercial 1,084 2,768
Industrial 205 2,392
Others 581 2,339
TOTAL 47,982 30,572
Customer/s Served by RES:
Sales for Customer/s served by RES:
MW
Circuit kilometer:
4.00
519.5 Supply
2.00
Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 3.10 5.43 5.76 6.09 6.42 6.75 9.58 9.91 10.25 10.58
No. SS Name Supply for PSA Approval: Captive Customers 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
1 Tunga S/S 5 MVA Supply Contracted: Captive Customers 3.50 3.50 2.50 2.50 2.50 2.50 2.50 0.00 0.00 0.00 0.00
Peak Demand: Franchise 7.22 7.60 7.93 8.26 8.59 8.92 9.25 9.58 9.91 10.25 10.58
2 Alangalang S/S 5 MVA
Peak Demand: Captive Customers 7.22 7.60 7.93 8.26 8.59 8.92 9.25 9.58 9.91 10.25 10.58
126
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
127
LEYTE IV ELECTRIC COOPERATIVE, INC. (LEYECO IV)
Number of Barangays: Status of Household Energization:
Grid: 242 97.3 % (70,189 HH / 72,100 HH)
Off-grid: 3
63,634
Industrial 531 2,236
Circuit kilometer: Others 2,997 8,363
774.9
TOTAL 70,189 55,520
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation System Loss: 6,756 MWh (10.85 %)
Backbone Line
Demand Annual Average Growth Rate (2016-2025) : 5.68 %
25.00
20.00
Actual
15.00
MW
10.00
Supply
5.00
Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 1.80 2.33 1.93 0.00 0.00 0.00 0.15 1.20 2.35 3.63
No. SS Name
Capacity Supply for PSA Approval: Captive Customers 2.00 2.00 6.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00
1 San Agustin S/S 5 MVA Supply Contracted: Captive Customers 9.00 8.00 8.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Baybay S/S 10 MVA Peak Demand: Franchise 11.30 11.80 12.33 12.93 13.60 14.36 15.21 16.15 17.20 18.35 19.63
3 Hilongos S/S 10 MVA Peak Demand: Captive Customers 11.30 11.80 12.33 12.93 13.60 14.36 15.21 16.15 17.20 18.35 19.63
LEYTE V ELECTRIC COOPERATIVE, INC. (LEYECO V)
Number of Barangays: Status of Household Energization:
Grid: 415 86.8 % (111,512 HH / 128,500 HH)
Off-grid: -
50.00
45.00
40.00
Actual
35.00
30.00
25.00
MW
20.00
Supply 15.00
Demand 10.00
SS 5.00
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Leyte S/S 5 MVA Supply Indicative 8.60 8.91 9.21 7.52 8.83 10.14 11.45 12.75 14.06 15.37
2 Tabango S/S 5 MVA Supply for PSA Approval: Captive Customers 14.00 22.00 23.00 31.00 31.00 31.00 31.00 31.00 31.00 31.00
3 Isabel S/S 12 MVA Supply Contracted: Captive Customers 17.00 12.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Ormoc S/S 20 MVA Peak Demand: Franchise 34.32 35.63 36.94 38.24 39.55 40.86 42.17 43.48 44.78 46.09 47.40
5 Albuera S/S 10 MVA Peak Demand: Captive Customers 34.32 34.60 35.91 37.21 38.52 39.83 41.14 42.45 43.75 45.06 46.37
128
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
129
NORTHERN SAMAR ELECTRIC COOPERATIVE, INC. (NORSAMELCO)
Number of Barangays: Status of Household Energization:
Grid: 440 64.4 % (66,173 HH / 102,700HH)
Off-grid: 129
Industrial 5 2,540
Capul Others 1,009 8,506
TOTAL 66,173 64,245
San Antonio
Customer/s Served by RES:
San Sales for Customer/s served by RES:
Lapinig
Vicente
System Loss: 11,909 MWh (15.64 %)
MW
113,442 10.00
Supply
Circuit kilometer: Demand 5.00
735
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 3.63 4.34 4.85 2.52 3.17 3.79 4.39 4.97 5.53 6.07
No. SS Name
Capacity Supply for PSA Approval: Captive Customers 0.00 12.00 13.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00
1 Allen S/S 5 MVA Supply Contracted: Captive Customers 12.08 12.79 0.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Bobon S/S 15 MVA Peak Demand: Franchise 14.43 15.57 16.27 16.95 17.60 18.22 18.82 19.39 19.95 20.49 21.00
3 Bobolosan S/S 5 MVA Peak Demand: Captive Customers 15.27 16.42 17.15 17.85 18.52 19.17 19.79 20.39 20.97 21.53 22.07
SAMAR I ELECTRIC COOPERATIVE, INC. (SAMELCO I)
Number of Barangays: Status of Household Energization:
Grid: 316 83.6 % (54,350 HH / 65,000 HH)
LEGEND: Off-grid: 111
Energized DU System
Substation Customer Captive Customer
Sales (MWh)
Backbone Line Classification Connection
Residential 49,017 28,462
Commercial 1,767 10,328
Industrial 3 4,062
Others 3,627 5,818
TOTAL 54,414 48,670
Customer/s Served by RES:
Sales for Customer/s served by RES:
Tagapul-An
Camandag System Loss: 8,491 MWh (14.85 %)
Libucan 25.00
Franchise Area:
20.00
2,269.1 sq. km.
Actual
15.00
Franchise Population:
MW
317,183
10.00
Supply
Circuit kilometer:
Demand 5.00
612.9
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 0.00 4.33 3.96 2.59 3.23 3.88 4.54 5.22 5.90 6.60
No. SS Name
Capacity Supply for PSA Approval: Captive Customers 10.00 9.00 10.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00
1 Palanas Cara S/S 5 MVA Supply Contracted: Captive Customers 7.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Capoocan S/S 10 MVA Peak Demand: Franchise 10.39 12.43 13.04 13.66 14.28 14.92 15.56 16.22 16.89 17.57 18.26
3 San Agustin S/S 5 MVA Peak Demand: Captive Customers 10.67 12.72 13.33 13.96 14.59 15.23 15.88 16.54 17.22 17.90 18.60
130
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
131
SAMAR II ELECTRIC COOPERATIVE, INC. (SAMELCO II)
Number of Barangays: Status of Household Energization:
Grid: 491 87.9 % (72,626 HH / 82,600 HH)
San Jose de Buan Off-grid: 33
387,112
Industrial 5 3,728
Circuit kilometer: Others 1,707 6,390
Zumarraga 1,207.9 TOTAL 72,628 58,008
San Sebastian
Daram Customer/s Served by RES:
Sales for Customer/s served by RES:
MW
Marabut 8.00
LEGEND: Supply
Energized DU System 6.00
Substation Demand 4.00
Backbone Line 2.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 2.31 8.89 9.85 0.38 0.88 1.41 1.88 2.37 2.88 3.40
No. SS Name
Capacity Supply for PSA Approval: Captive Customers 4.00 0.00 0.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00
1 Catbalogan S/S 10 MVA Supply Contracted: Captive Customers 9.33 7.34 5.35 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Paranas S/S 5 MVA Peak Demand: Franchise 12.57 13.25 13.84 14.40 14.93 15.43 15.91 16.38 16.87 17.38 17.90
3 Bagolibas S/S 5 MVA Peak Demand: Captive Customers 12.92 13.65 14.24 14.85 15.38 15.88 16.41 16.88 17.37 17.88 18.40
SOUTHERN LEYTE ELECTRIC COOPERATIVE, INC. (SOLECO)
Number of Barangays: Status of Household Energization:
Grid: 492 96.1 % (92,893 HH / 96,700HH)
Off-grid: 8
30.00
Actual
San Francisco 25.00
20.00
San Ricardo
MW
Pintuyan 15.00
Supply 10.00
Limasawa
Demand 5.00
SS 0.00
No. SS Name 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Capacity
Supply Indicative 6.75 6.79 8.03 7.09 8.15 9.20 10.27 11.33 12.37 13.44
1 Himay-angan S/S 5 MVA
Supply for PSA Approval: Captive Customers 9.00 14.00 14.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00
2 San Isidro S/S 5 MVA
Supply Contracted: Captive Customers 21.38 4.19 0.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Pandan S/S 10 MVA
Peak Demand: Franchise 18.02 19.75 20.79 21.83 22.87 23.91 24.95 25.99 27.03 28.07 29.11
4 Maasin S/S 10 MVA
Peak Demand: Captive Customers 18.19 19.93 20.98 22.03 23.09 24.15 25.20 26.27 27.33 28.37 29.44
132
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
133
MARIPIPI MULTI-PURPOSE COOPERATIVE, INC. (MMPC)
Number of Barangays: Status of Household Energization:
Grid: - 42.9 % (818 HH / 1,907 HH)
Off-grid: 15
Franchise Population:
Residential 1,309 369
6,252 Commercial 38 68
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Industrial - -
Circuit kilometer:
Others 47 42
-
TOTAL 1,394 479
Customer/s Served by RES:
Sales for Customer/s served by RES:
0.35
Actual
0.30
0.25
0.20
MW
LEGEND: 0.15
Energized DU System Supply 0.10
Substation
Backbone Line Demand 0.05
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Supply for PSA Approval: Captive Customers 0.00 0.00 0.23 0.24 0.25 0.26 0.27 0.28 0.29 0.30
Supply Contracted: Captive Customers 0.28 0.30 0.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Peak Demand: Franchise
Peak Demand: Captive Customers 0.16 0.16 0.16 0.17 0.17 0.18 0.19 0.19 0.20 0.20 0.21
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Region IX
Utilities
IX Distribution
of Distribution Per Region
Utilities
Peak
Distribution
Demand
Utility
Region
1 (MW)
System Map
1 ZANECO 34.35
2 2 ZAMSURECO I 35.07
3 ZAMSURECO II 22.43
3
4 ZAMCELCO 93.99
Total 185.84
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 380,042 201,143
Commercial 25,427 157,924
Industrial 1,524 99,160
Others 15,007 405,395
Total 422,001 863,621
134
Region IX Distribution Utilities
135
ZAMBOANGA CITY ELECTRIC COOPERATIVE, INC (ZAMCELCO)
Number of Barangays: Status of Household Energization:
Grid: 90 68.4 % (131,288 HH / 192,000HH)
Off-grid: 8
807,129
Industrial 159 111,204
Circuit kilometer: Others 1,697 39,312
- TOTAL 103,475 441,420
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation System Loss: 121,586 MWh (21.60 %)
Backbone Line
MW
80.00
Supply 60.00
SS 40.00
No. SS Name Demand 20.00
Capacity
1 Sangali S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Putik S/S 40 MVA Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.82
3 Camanchile S/S 20 MVA Supply for PSA Approval: Captive Customers 35.00 35.00 35.00 53.00 53.00 53.00 53.00 53.00 53.00 53.00
4 Cabatangan S/S 10 MVA Supply Contracted: Captive Customers 59.00 119.56 101.56 89.56 106.56 106.56 106.56 106.56 106.56 106.56 106.56
5 San Jose Gusu S/S 30 MVA Peak Demand: Franchise 93.99 105.58 110.26 115.46 121.18 127.42 134.17 141.44 149.23 157.55 166.38
6 Recodo S/S 10 MVA Peak Demand: Captive Customers 93.99 105.58 110.26 115.46 121.18 127.42 134.17 141.44 149.23 157.55 166.38
ZAMBOANGA DEL SUR I ELECTRIC COOPERATIVE, INC. (ZAMSURECO I)
Number of Barangays: Status of Household Energization:
Grid: 616 71.0 % (116,112 HH / 163,500 HH)
Don Victoriano Chiongban Off-grid: 12
MW
Pitogo
30.00
Tabina Supply 20.00
SS 10.00
No. SS Name Demand
Capacity
0.00
1 Culo S/S 5 MVA 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Switch S/S 5 MVA Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Tiguma S/S 10 MVA Supply for PSA Approval: Captive Customers 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00
4 Balangasan S/S 10 MVA Supply Contracted: Captive Customers 15.00 22.00 27.00 51.24 51.24 51.24 51.24 51.24 51.24 51.24 51.24
5 San Jose S/S 10 MVA Peak Demand: Franchise 35.07 36.32 37.62 38.90 40.15 41.39 42.60 43.78 44.95 46.09 47.21
6 San Miguel S/S 5 MVA Peak Demand: Captive Customers 35.07 36.32 37.62 38.90 40.15 41.39 42.60 43.78 44.95 46.09 47.21
136
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
137
ZAMBOANGA DEL SUR II ELECTRIC COOPERATIVE, INC. (ZAMSURECO II)
Number of Barangays: Status of Household Energization:
Grid: 524 74.3 % (111,080 HH / 149,500 HH)
LEGEND:
Energized DU System Off-grid: 36
Substation
Backbone Line Lakewood Customer Captive Customer
Sales (MWh)
Classification Connection
Kabasalan
Residential 89,621 58,364
Commercial 5,317 23,504
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
MW
15.00
1,964.5
Supply 10.00
SS 5.00
No. SS Name Demand
Capacity
0.00
1 Sirawai S/S 5 MVA 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 R.T. Lim S/S 3.5 MVA Supply Indicative 0.19 6.09 0.00 0.00 0.13 1.08 2.04 3.00 3.95 4.90
3 Pangi S/S 10 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Danda S/S 5 MVA Supply Contracted: Captive Customers 28.72 23.04 18.00 33.30 28.30 26.30 26.30 26.30 26.30 26.30 26.30
5 Imelda S/S 5 MVA Peak Demand: Franchise 22.43 23.23 24.09 24.99 25.50 26.43 27.38 28.34 29.30 30.25 31.20
6 Imelda 2 S/S 5 MVA Peak Demand: Captive Customers 22.43 23.23 24.09 24.99 25.50 26.43 27.38 28.34 29.30 30.25 31.20
ZAMBOANGA DEL NORTE ELECTRIC COOPERATIVE, INC. (ZANECO)
Number of Barangays: Status of Household Energization:
Grid: 578 70.8 % (105,480 HH / 149,000 HH)
Off-grid: 7
Franchise Area:
Customer Captive Customer
5,267.7 sq. km. Dapitan City Sales (MWh)
Classification Connection
Franchise Population: Sibutad Residential 97,029 94,287
Rizal
957,997 Commercial 5,064 19,552
Circuit kilometer: Industrial 596 18,386
La Libertad
2,987.3 Katipunan Others 3,723 17,816
Roxas
TOTAL 106,413 150,042
LEGEND: Customer/s Served by RES:
Energized DU System Sales for Customer/s served by RES:
Substation
Backbone Line System Loss: 24,648 MWh (12.50 %)
Sindangan
Demand Annual Average Growth Rate (2016-2025) : 5.78 %
70.00
Liloy
60.00
50.00
Actual
40.00
MW
30.00
Supply 20.00
10.00
SS Demand
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Polo S/S 10 MVA Supply Indicative 3.10 9.24 0.00 0.00 0.00 0.00 1.13 4.08 7.12 10.24
2 Obay S/S 20 MVA Supply for PSA Approval: Captive Customers 0.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
3 Piao S/S 5 MVA Supply Contracted: Captive Customers 29.97 33.08 24.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00
4 Mucas S/S 5 MVA Peak Demand: Franchise 34.35 36.18 38.24 40.49 42.94 45.54 48.27 51.13 54.08 57.12 60.24
5 Comunal S/S 5 MVA Peak Demand: Captive Customers 34.35 36.18 38.24 40.49 42.94 45.54 48.27 51.13 54.08 57.12 60.24
138
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Region X
Per Region
Utilities
Utilities
Peak
Distribution
Demand
X Distribution
Utility
(MW)
of Distribution
1 1 CAMELCO 4.02
2 MORESCO II 22.52
2
Region
3 CEPALCO 165.39
System Map
4 3
5 4 MOELCI I 10.04
8 6 5 MORESCO I 68.36
7
6 BUSECO 26.05
9
7 MOELCI II 23.72
10
8 ILPI 35.64
9 LANECO 15.19
10 FIBECO 30.95
Total 401.88
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 674,530 412,578
Commercial 50,070 885,860
Industrial 2,148 68,890
Others 17,959 670,565
Total 744,707 2,037,893
139
CAGAYAN ELECTRIC POWER & LIGHT COMPANY, INC. (CEPALCO)
Number of Barangays: Status of Household Energization:
Grid: 112 59.9 % (112,611 HH / 187,949 HH)
Off-grid: -
MW
No. SS Name 200.00
Capacity
1 Pagawan S/S 10 MVA Supply 150.00
2 Moog S/S 10 MVA 100.00
3 Lumbo S/S 10 MVA Demand 50.00
4 Abi S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
5 Quibonbon S/S 10 MVA Supply Indicative 60.39 9.26 16.13 33.01 49.88 66.76 98.94 115.82 132.69 149.57
6 Opol S/S 10 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
7 Taboc S/S 10 MVA Supply Contracted: Captive Customers 209.25 152.25 302.25 292.25 292.25 292.25 292.25 276.94 276.94 276.94 276.94
8 Canituan S/S 10 MVA Peak Demand: Franchise 165.39 212.63 311.50 328.38 345.25 362.13 379.00 395.88 412.75 429.63 446.50
9 Sobros S/S 7 MVA Peak Demand: Captive Customers 165.39 212.63 311.50 328.38 345.25 362.13 379.00 395.88 412.75 429.63 446.50
140
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
141
ILIGAN LIGHT & POWER, INC. (ILPI)
Number of Barangays: Status of Household Energization:
Grid: 40 73.6 % (60,738 HH / 82,551 HH)
Off-grid: 4
Industrial 34 41,514
Others 22 2,138
TOTAL 61,536 202,593
Customer/s Served by RES:
Sales for Customer/s served by RES:
MW
308,406 30.00
Supply 20.00
Circuit kilometer:
322.3 Demand 10.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS
No. SS Name Supply Indicative 0.00 0.00 10.07 13.39 16.75 19.97 22.87 25.27 26.99 27.85
Capacity Supply for PSA Approval: Captive Customers 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Kiwalan S/S 12.5 MVA Supply Contracted: Captive Customers 40.45 47.09 39.75 39.75 39.75 39.75 39.75 39.75 39.75 39.75 39.75
2 Luinab S/S 30 MVA Peak Demand: Franchise 35.64 41.44 46.73 49.82 53.14 56.50 59.72 62.62 65.02 66.74 67.60
4 Palao S/S 30 MVA Peak Demand: Captive Customers 35.64 41.44 46.73 49.82 53.14 56.50 59.72 62.62 65.02 66.74 67.60
BUKIDNON SECOND ELECTRIC COOPERATIVE, INC. (BUSECO)
Number of Barangays: Status of Household Energization:
Grid: 173 80.6 % (89,599 HH / 111,200 HH)
Off-grid: -
70.00
Franchise Area:
60.00
4,904.3 sq. km.
50.00
Franchise Population:
40.00
563,991 Actual
MW
30.00
Circuit kilometer: Supply 20.00
1,464.4
Demand 10.00
SS
No. SS Name 0.00
Capacity 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Damilag S/S 5 MVA Supply Indicative 1.04 6.68 0.00 0.00 0.44 0.00 2.53 3.57 6.80 10.23
2 Lunocan S/S 15 MVA Supply for PSA Approval: Captive Customers 10.60 22.60 40.79 40.79 40.79 45.19 45.19 47.19 47.19 47.19
3 Sumilao S/S 10 MVA Supply Contracted: Captive Customers 23.19 23.23 8.23 8.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23
4 Casisang S/S 10 MVA Peak Demand: Franchise 26.05 34.87 37.50 39.63 41.93 43.45 47.09 49.94 52.99 56.22 59.64
5 Aglayan S/S 10 MVA Peak Demand: Captive Customers 26.05 34.87 37.50 39.63 41.93 43.45 47.09 49.94 52.99 56.22 59.64
142
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
143
CAMIGUIN ELECTRIC COOPERATIVE, INC. (CAMELCO)
Number of Barangays: Status of Household Energization:
Grid: 58 97.2 % (20,995 HH / 21,600 HH)
Off-grid: -
Franchise Area: Customer Captive Customer
238 sq. km. Sales (MWh)
Classification Connection
Franchise Population: Residential 19,437 10,453
- Commercial 898 4,039
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Circuit kilometer:
Industrial - -
250.84 Others 616 2,560
TOTAL 20,951 17,052
Customer/s Served by RES:
Sales for Customer/s served by RES:
12.00
10.00
LEGEND: 8.00
Actual
Energized Coop System
Substation 6.00
MW
Primary Backbone
Supply 4.00
Demand 2.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.07 0.02
SS
No. SS Name Supply for PSA Approval: Captive Customers 0.00 4.00 6.73 6.73 6.73 6.73 6.73 6.73 6.73 6.73
Capacity
Supply Contracted: Captive Customers 6.43 5.43 3.01 3.01 3.01 3.01 3.01 3.01 0.00 0.00 0.00
1 Esperanza S/S 5 MVA
Peak Demand: Franchise 4.02 4.10 4.21 4.37 4.58 4.85 5.20 5.63 6.16 6.80 6.75
Peak Demand: Captive Customers 4.02 4.10 4.21 4.37 4.58 4.85 5.20 5.63 6.16 6.80 6.75
FIRST BUKIDNON ELECTRIC COOPERATIVE, INC. (FIBECO)
Number of Barangays: Status of Household Energization:
Grid: 300 79.2 % (136,721HH / 172,600 HH)
Off-grid: -
LEGEND:
Energized DU System Customer Captive Customer
Substation Sales (MWh)
Classification Connection
Backbone Line
Residential 111,590 66,595
Commercial 8,073 28,848
Industrial 353 41,591
Kalilangan Others 3,876 10,141
San Fernando TOTAL 123,892 147,176
Customer/s Served by RES:
Sales for Customer/s served by RES:
Kadingilan 70.00
Franchise Population: 60.00
791,420 Actual
50.00
MW
5,789.7 Supply 30.00
20.00
SS
No. SS Name Demand 10.00
Capacity
1 Dabong-dabong S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Lumbo S/S 10 MVA
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Anahawon S/S 10 MVA
Supply for PSA Approval: Captive Customers 10.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 39.00 35.00
4 Camp 1 S/S 10 MVA
Supply Contracted: Captive Customers 42.18 24.60 24.00 24.00 24.00 24.00 24.00 21.00 21.00 21.00 21.00
5 Palma S/S 5 MVA
Peak Demand: Franchise 30.95 31.76 32.47 33.17 33.88 34.58 35.29 35.99 36.70 37.40 38.11
6 Barandias S/S 5 MVA
Peak Demand: Captive Customers 30.95 31.76 32.47 33.17 33.88 34.58 35.29 35.99 36.70 37.40 38.11
144
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
145
LANAO DEL NORTE ELECTRIC COOPERATIVE, INC. (LANECO)
Number of Barangays: Status of Household Energization:
Grid: 340 74.1 % (88,641 HH / 119,600 HH)
Off-grid: 70
30.00
Sultan Naga Dimaporo
Franchise Area: 25.00
3,011.4 sq. km. Actual
20.00
Franchise Population: 15.00
MW
676,395
Supply 10.00
Circuit kilometer:
61.3 Demand 5.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.18 1.73 3.42 5.26
SS Supply for PSA Approval: Captive Customers 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
No. SS Name
Capacity Supply Contracted: Captive Customers 5.00 11.15 13.00 18.00 18.00 15.00 15.00 15.00 15.00 15.00 15.00
1 Kauswagan S/S 10 MVA Peak Demand: Franchise 15.19 16.26 17.17 18.17 19.26 20.45 21.75 23.18 24.73 26.42 28.26
2 Kapatagan S/S 10 MVA Peak Demand: Captive Customers 15.19 16.26 17.17 18.17 19.26 20.45 21.75 23.18 24.73 26.42 28.26
MISAMIS OCCIDENTAL I ELECTRIC COOPERATIVE, INC. (MOELCI I)
Number of Barangays: Status of Household Energization:
Grid: 227 94.7 % (55,287 HH / 58,400 HH)
Off-grid: -
Plaridel
Customer Captive Customer
Sales (MWh)
Franchise Area: Classification Connection
797 sq. km. Sapang Dalaga Residential 43,588 25,064
Franchise Population: Lopez Jaena Commercial 2,090 10,280
568,661 Industrial 91 5,019
Others 1,362 6,030
Circuit kilometer:
1,750.3 TOTAL 47,131 46,393
Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND: 25.00
Energized DU System 20.00
Substation
Actual
MW
Backbone Line 15.00
Supply 10.00
Demand 5.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SS
No. SS Name Supply for PSA Approval: Captive Customers 16.00 16.00 16.00 19.50 19.50 19.50 19.50 19.50 19.50 19.50
Capacity
Supply Contracted: Captive Customers 9.92 11.35 8.76 15.56 13.56 13.56 13.56 13.56 13.56 13.56 13.56
1 Bunawan S/S 5 MVA
Peak Demand: Franchise 10.04 10.53 11.01 11.53 12.12 12.75 13.44 14.18 14.98 15.83 16.73
2 Villaflor S/S 10 MVA
Peak Demand: Captive Customers 10.04 10.53 11.01 11.53 12.12 12.75 13.44 14.18 14.98 15.83 16.73
146
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
147
MISAMIS OCCIDENTAL II ELECTRIC COOPERATIVE, INC. (MOELCI II)
Number of Barangays: Status of Household Energization:
Grid: 253 93.6 % (81,943 HH / 87,500 HH)
Off-grid: -
-
Industrial 46 32,689
Circuit kilometer: Others 1,296 6,473
794.9
TOTAL 64,126 123,545
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation System Loss: 16,210 MWh (11.60 %)
Backbone Line
40.00
35.00
30.00
Actual
25.00
20.00
MW
Supply 15.00
10.00
Demand 5.00
SS 0.00
No. SS Name 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Capacity
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.95
1 Jomi S/S 5 MVA
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Basirang S/S 10 MVA
Supply Contracted: Captive Customers 26.11 30.19 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 25.00
3 Bañadero S/S 20 MVA
Peak Demand: Franchise 23.72 26.09 27.45 28.10 28.75 29.41 30.08 30.77 31.47 32.20 32.95
4 Basirang S/S 10 MVA Peak Demand: Captive Customers 23.72 26.09 27.45 28.10 28.75 29.41 30.08 30.77 31.47 32.20 32.95
MISAMIS ORIENTAL I RURAL ELECTRIC SERVICE COOPERATIVE, INC. (MORESCO I)
Laguindingan Number of Barangays: Status of Household Energization:
Grid: 156 92.0 % (83,188 HH / 90,400 HH)
City of El Salvador
Libertad Off-grid: -
100.00
SS Actual
No. SS Name 80.00
Capacity
1 Pagawan S/S 10 MVA 60.00
MW
2 Moog S/S 10 MVA
3 Lumbo S/S 10 MVA Supply 40.00
4 Abi S/S 10 MVA
5 Quibonbon S/S 10 MVA 20.00
Demand
6 Opol S/S 10 MVA
0.00
7 Taboc S/S 10 MVA 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
8 Canituan S/S 10 MVA Supply Indicative 12.87 15.52 6.43 8.55 12.25 14.28 18.74 19.14 22.14 27.18
9 Cabula S/S 1 MVA Supply for PSA Approval: Captive Customers 5.00 15.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
10 Mabuaya S/S 0.58 MVA Supply Contracted: Captive Customers 54.92 60.84 52.50 73.55 73.55 73.55 73.55 73.55 73.55 73.55 73.55
11 Talakag S/S 1.5 MVA Peak Demand: Franchise 68.36 78.71 83.02 84.98 87.10 90.80 92.83 97.29 97.69 100.69 105.73
12 Sobros S/S 7 MVA Peak Demand: Captive Customers 68.36 78.71 83.02 84.98 87.10 90.80 92.83 97.29 97.69 100.69 105.73
148
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
149
MISAMIS ORIENTAL II ELECTRIC SERVICE COOPERATIVE, INC. (MORESCO II)
Number of Barangays: Status of Household Energization:
Grid: 269 77.6 % (69,388 HH / 89,400 HH)
LEGEND:
Energized DU System
Off-grid: -
Substation
Backbone Line Franchise Area: Customer Captive Customer
Magsaysay Sales (MWh)
150 sq. km. Classification Connection
Talisayan Residential
Sugbongcogon 57,927 41,133
Franchise Population:
Binuangan Balingoan Commercial 1,851 5,220
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
-
Industrial 388 41,743
Circuit kilometer: Others 1,427 5,126
673.3
TOTAL 61,593 93,222
Lagonglong Customer/s Served by RES:
Sales for Customer/s served by RES:
MW
20.00
SS Supply 15.00
No. SS Name 10.00
Capacity
1 Magsaysay S/S 5 MVA Demand 5.00
2 Gingoog S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
3 Agay-ayan S/S 10 MVA Supply Indicative 3.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Wilmar S/S 4 MVA Supply for PSA Approval: Captive Customers 0.00 8.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00
5 Sugbongcogon S/S 5 MVA Supply Contracted: Captive Customers 23.23 19.66 34.40 34.40 34.40 34.40 34.40 34.40 34.40 25.00 25.00
6 Balingasag S/S 5 MVA Peak Demand: Franchise 22.52 23.47 24.51 25.55 26.60 27.64 28.68 29.72 30.76 31.81 32.85
7 Solana S/S 5 MVA Peak Demand: Captive Customers 22.52 23.47 24.51 25.55 26.60 27.64 28.68 29.72 30.76 31.81 32.85
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Region XI
Utilities
XI Distribution
of Distribution Per Region
Utilities
Peak 1
Distribution
Demand
Region
Utility
(MW)
System Map
3 2
1 DANECO 80.70
2 DORECO 20.48
3 DLPC 357.04
4 DASURECO 48.81 4
Total 507.03
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 626,119 323,857
Commercial 70,443 1,427,006
Industrial 5,967 85,919
Others 21,405 972,682
Total 723,935 2,809,464
150
Region XI Distribution Utilities
151
DAVAO LIGHT AND POWER COMPANY, INC (DLPC)
Number of Barangays: Status of Household Energization:
Grid: 261 98.1 % (499,177 HH / 508,609 HH)
Off-grid: 5
Franchise Area: Customer Captive Customer
3,561 sq. km. Sales (MWh)
Classification Connection
400.00
300.00
MW
200.00
Supply
100.00
Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 141.67 239.59 255.12 269.98 287.70 357.13 373.14 384.94 357.00
SS Supply for PSA Approval: Captive Customers 68.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name
Capacity Supply Contracted: Captive Customers 449.13 388.28 223.47 193.47 193.47 193.47 193.47 140.00 140.00 140.00 140.00
1 DRA S/S 100 MVA Peak Demand: Franchise 357.04 383.32 415.14 433.06 448.59 463.45 481.17 497.13 513.14 524.94 497.00
2 ERA S/S 150 MVA Peak Demand: Captive Customers 357.04 383.32 415.14 433.06 448.59 463.45 481.17 497.13 513.14 524.94 497.00
DAVAO DEL NORTE ELECTRIC COOPERATIVE, INC. (DANECO)
Number of Barangays: Status of Household Energization:
Grid: 373 72.8 % (177,867 HH / 244,300 HH)
Off-grid: 1
Samal
City
Demand Annual Average Growth Rate (2016-2025) : 7.17 %
LEGEND:
Energized DU System 180.00
Substation 160.00
Backbone Line
140.00
120.00
SS Actual
No. SS Name 100.00
Capacity
MW
1 Monkayo S/S 10 MVA 80.00
2 Montevista S/S 12 MVA 60.00
3 Compostela S/S 10 MVA
Supply 40.00
4 Mipangi S/S 10 MVA Demand 20.00
5 Asuncion S/S 20 MVA
0.00
6 Mirafuentes S/S 10 MVA 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
7 Mirafuentes 2 S/S 10 MVA Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.29 31.18 55.78
8 Apocon S/S 20 MVA Supply for PSA Approval: Captive Customers 35.00 40.00 40.00 40.00 40.00 40.00 40.00 35.00 35.00 35.00
9 Canocotan S/S 20 MVA Supply Contracted: Captive Customers 91.37 114.23 116.26 113.00 98.00 98.00 98.00 98.00 93.00 80.00 70.00
10 Maco S/S 10 MVA Peak Demand: Franchise 80.70 81.47 85.54 90.52 96.55 103.73 112.17 121.99 133.29 146.18 160.78
11 Mabini S/S 5 MVA Peak Demand: Captive Customers 80.70 81.47 85.54 90.52 96.55 103.73 112.17 121.99 133.29 146.18 160.78
152
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
153
DAVAO DEL SUR ELECTRIC COOPERATIVE, INC. (DASURECO)
Santa Cruz
Bansalan Number of Barangays: Status of Household Energization:
Digos City Grid: 305 75.3 % (152,177 HH / 202,200 HH)
Magsaysay Off-grid: 32
868,700
Industrial 900 117,135
Circuit kilometer: Others 11,613 15,186
2,191.6 TOTAL 153,709 259,364
LEGEND: Customer/s Served by RES:
Energized DU System Don Marcelino Sales for Customer/s served by RES:
Substation
Jose
Backbone Line System Loss: 25,038 MWh (9.29 %)
Abad
Santos
Demand Annual Average Growth Rate (2016-2025) : 6.24 %
100.00
90.00
80.00
70.00
Actual
60.00
Sarangani
Island 50.00
Balut
MW
Island 40.00
Supply 30.00
SS 20.00
No. SS Name Demand 10.00
Capacity
1 Astorga S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Matanao S/S 10 MVA Supply Indicative 0.00 0.00 1.07 5.38 4.72 9.03 13.25 17.31 21.15 25.33
3 Cogon S/S 20 MVA Supply for PSA Approval: Captive Customers 17.00 22.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
4 Paligue S/S 10 MVA Supply Contracted: Captive Customers 55.15 53.83 44.32 49.36 49.40 54.44 54.48 54.52 54.56 54.60 54.00
5 Malalag S/S 5 MVA Peak Demand: Franchise 48.81 52.11 56.19 60.43 64.77 69.15 73.50 77.76 81.87 85.75 89.33
6 Malita S/S 5 MVA Peak Demand: Captive Customers 48.81 52.11 56.19 60.43 64.77 69.15 73.50 77.76 81.87 85.75 89.33
DAVO ORIENTAL ELECTRIC COOPERATIVE, INC. (DORECO)
Number of Barangays: Status of Household Energization:
Grid: 183 87.4 % (95,336 HH / 109,100 HH)
Off-grid: -
Franchise Population:
Residential 65,324 46,627
517,618 Commercial 6,646 20,129
Industrial 193 20,217
Circuit kilometer:
Others 2,343 10,302
1,438.2
TOTAL 74,506 97,274
Banaybanay Customer/s Served by RES:
Sales for Customer/s served by RES:
25.00
Actual
LEGEND:
Energized DU System 20.00
Substation Governor Generoso
Backbone Line 15.00
MW
Supply 10.00
5.00
SS Demand
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Cateel S/S 3.75 MVA
Supply Indicative 1.95 2.74 5.74 6.22 6.68 7.13 7.58 8.04 8.52 9.04
2 Baganga S/S 5 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3 Mati S/S 20 MVA Supply Contracted: Captive Customers 17.37 19.22 20.50 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00
4 Lupon S/S 10 MVA Peak Demand: Franchise 20.48 21.16 23.24 23.74 24.22 24.68 25.13 25.58 26.04 26.52 27.04
5 San Isidro S/S 10 MVA Peak Demand: Captive Customers 20.48 21.16 23.24 23.74 24.22 24.68 25.13 25.58 26.04 26.52 27.04
154
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Region XII
Utilities
Distribution
Distribution Per Region
Utilities
Peak
Distribution
Demand
1 Utility
of XII
(MW)
3
Region
2 COTELCO -
System Map
1 14.39
PPALMA
2 COTELCO 35.02
3 CLPC 26.30
4
4 SUKELCO 28.71
5
6 5 SOCOTECO I 40.22
6 SOCOTECO II 155.25
Total 299.90
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 507,040 282,655
Commercial 40,085 466,225
Industrial 1,648 69,206
Others 18,201 639,668
Total 566,974 1,457,755
155
COTABATO LIGHT AND POWER COMPANY, INC. (CLPC)
Number of Barangays: Status of Household Energization:
Grid: 63 100.0 % (82,905 HH / 82,905 HH)
Off-grid: -
40.00
MW
30.00
LEGEND:
Energized DU System Supply 20.00
Substation
Backbone Line Demand 10.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 0.00 7.53 14.24 14.96 15.67 16.38 17.10 17.81 18.52 19.23
No. SS Name
Capacity Supply for PSA Approval: Captive Customers 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Salimbao S/S 15 MVA Supply Contracted: Captive Customers 61.55 41.45 12.95 11.95 11.95 11.95 11.95 11.95 11.95 11.95 11.95
2 Sinsuat S/S 12 MVA Peak Demand: Franchise 26.30 24.77 25.48 26.19 26.91 27.62 28.33 29.05 29.76 30.47 31.18
3 Malagapas S/S 10 MVA Peak Demand: Captive Customers 26.30 24.77 25.48 26.19 26.91 27.62 28.33 29.05 29.76 30.47 31.18
156
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
157
COTABATO ELECTRIC COOPERATIVE, INC. (COTELCO)
Number of Barangays: Status of Household Energization:
Grid: 348 83.4 % (137,807 HH / 165,300 HH)
Off-grid: -
110,521
Industrial 264 28,514
Circuit kilometer: Others 5,848 17,338
3,636.1
TOTAL 137,807 164,371
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Kabacan Energized DU System
Substation
System Loss: 23,637 MWh (12.57 %)
Backbone Line
60.00
50.00
Actual
40.00
MW
30.00
Supply 20.00
SS 10.00
No. SS Name Demand
Capacity
1 Bagong Silang S/S 10 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Kidapawaan S/S 10 MVA Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.93 16.85 18.84
3 Paco S/S 10 MVA Supply for PSA Approval: Captive Customers 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00
4 Manubuan S/S 5 MVA Supply Contracted: Captive Customers 40.00 45.00 38.00 38.00 43.00 43.00 43.00 43.00 23.00 18.00 18.00
5 Kabacan S/S 10 MVA Peak Demand: Franchise 35.02 36.42 37.88 39.40 40.97 42.61 44.32 46.09 47.93 49.85 51.84
6 Mlang S/S 10 MVA Peak Demand: Captive Customers 35.02 36.42 37.88 39.40 40.97 42.61 44.32 46.09 47.93 49.85 51.84
COTABATO ELECTRIC COOPERATIVE, INC. – PPALMA (COTELCO-PPALMA)
Number of Barangays: Status of Household Energization:
Grid: 195 56.7 % (45.564 HH / 80,400 HH)
Off-grid: -
25.00
20.00
Actual
15.00
MW
10.00
Supply
Demand 5.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.69 1.53 7.41 8.27
SS Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name
Capacity Supply Contracted: Captive Customers 18.23 16.07 19.00 19.00 19.00 19.00 19.00 19.00 19.00 14.00 14.00
1 Gumaga S/S 10 MVA Peak Demand: Franchise 14.39 15.04 15.89 16.80 17.35 18.10 18.87 19.69 20.53 21.41 22.27
2 Villarica S/S 10 MVA Peak Demand: Captive Customers 14.39 15.04 15.89 16.80 17.35 18.10 18.87 19.69 20.53 21.41 22.27
158
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
159
SOUTH COTABATO I ELECTRIC COOPERATIVE, INC. (SOCOTECO I)
Number of Barangays: Status of Household Energization:
Grid: 169 64.8 % (106,006 HH / 163,500 HH)
Off-grid: 6
LEGEND:
Residential 81,856 98,656
Energized DU System Commercial 10,200 39,582
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Santo Niño
Substation
Backbone Line
Industrial 447 69,291
Others - 384
TOTAL 92,503 207,913
Customer/s Served by RES:
Sales for Customer/s served by RES:
MW
Supply 30.00
20.00
SS Demand
No. SS Name 10.00
Capacity
1 Norala S/S 5 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Dajay S/S 10 MVA
Supply Indicative 0.00 1.61 0.00 17.78 20.51 13.34 11.27 14.30 17.42 20.64
3 Morales S/S 10 MVA
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 KCC S/S 5 MVA Supply Contracted: Captive Customers 43.65 56.39 44.10 49.10 33.10 33.10 43.10 48.10 48.10 48.10 48.10
5 Matulas S/S 10 MVA Peak Demand: Franchise 40.22 44.04 45.71 48.24 50.88 53.61 56.44 59.37 62.40 65.52 68.74
6 San Roque S/S 5 MVA Peak Demand: Captive Customers 40.22 44.04 45.71 48.24 50.88 53.61 56.44 59.37 62.40 65.52 68.74
SOUTH COTABATO II ELECTRIC COOPERATIVE, INC. (SOCOTECO II)
Number of Barangays: Status of Household Energization:
Franchise Area:
Grid: 204 57.1 % (173,052 HH / 303,000 HH)
466,208 sq. km.
Off-grid: -
Franchise Population:
1,237,106 Customer Captive Customer
Sales (MWh)
Classification Connection
Circuit kilometer: Residential 149,769 275,053
7,720.7 Gen. Santos City
Polomolok Commercial 9,788 152,024
Industrial 234 282,610
Others 7,993 38,306
TOTAL 167,784 747,992
Kiamba
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation
Backbone Line System Loss: 91,807 MWh (10.93 %)
SS
No. SS Name Demand Annual Average Growth Rate (2016-2025) : 2.28 %
Capacity
1 Kiamba S/S 5 MVA
350.00
2 Maasim S/S 5 MVA
3 Cargrill S/S 10 MVA 300.00
4 Fishport S/S 20 MVA
250.00
5 Airport S/S 2 MVA
Actual
6 DOLE S/S 5 MVA 200.00
7 Calumpang S/S 20 MVA
MW
150.00
8 Pentagon S/S 35 MVA Supply
9 Main S/S 20 MVA 100.00
10 Leon Llido S/S 20 MVA Demand 50.00
11 Tupi S/S 5 MVA
12 New Society S/S 20 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
13 Polomolok S/S 20 MVA
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 DOLE Cananery S/S 10 MVA
Supply for PSA Approval: Captive Customers 0.00 30.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00
15 Ligaya S/S 10 MVA
Supply Contracted: Captive Customers 169.13 184.13 205.00 205.00 205.00 205.00 205.00 205.00 205.00 205.00 205.00
16 Alabel S/S 10 MVA Peak Demand: Franchise 155.25 159.18 163.12 167.05 170.98 174.91 178.85 182.78 186.71 190.64 194.58
17 Glan S/S 5 MVA Peak Demand: Captive Customers 155.25 159.18 163.12 167.05 170.98 174.91 178.85 182.78 186.71 190.64 194.58
160
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
161
SULTAN KUDARAT ELECTRIC COOPERATIVE, INC. (SUKELCO)
Number of Barangays: Status of Household Energization:
Franchise Area: Kabuntalan Grid: 188 53.2 % (95,713 HH / 179,800 HH)
6,262 sq. km. Off-grid: 124
Franchise Population: Customer Captive Customer
798,310 Sales (MWh)
Classification Connection
Gen. S.K. Pendatun
Circuit kilometer: Lambayong Paglat Residential 77,560 81,538
3,614.7 Commercial 4,621 22,903
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Pandag
Industrial 157 30,932
Buluan
Mangudadatu Others 3,281 6,356
Tacurong Pres. Quirino TOTAL 85,619 141,730
City
Customer/s Served by RES:
Sales for Customer/s served by RES:
LEGEND:
Energized DU System System Loss: 19,213 MWh (11.94 %)
Substation
Backbone Line
Demand Annual Average Growth Rate (2016-2025) : 3.60 %
45.00
40.00
Actual
35.00
30.00
25.00
MW
20.00
Supply 15.00
10.00
SS Demand
No. SS Name 5.00
Capacity
1 Datupaglas S/S 5 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
2 Malipayon S/S 7.5 MVA Supply Indicative 0.00 4.29 2.09 6.30 7.56 11.48 12.75 14.02 15.29 16.56
3 Kalandagan S/S 5 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Malvar S/S 10 MVA Supply Contracted: Captive Customers 34.25 33.48 26.68 29.97 26.97 26.97 24.32 24.32 24.32 24.32 24.32
5 Isulan S/S 10 MVA Peak Demand: Franchise 28.71 29.58 30.97 32.06 33.27 34.53 35.80 37.07 38.34 39.61 40.88
6 Dukay S/S 5 MVA Peak Demand: Captive Customers 28.71 29.58 30.97 32.06 33.27 34.53 35.80 37.07 38.34 39.61 40.88
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
CARAGA
Utilities
Distribution
of Distribution Per Region
Utilities
Peak
Distribution
1 Demand
Utility
CARAGA
(MW)
1 DIELCO 3.06
System Map
2
3 2 SIARELCO 4.21
3 SURNECO 29.68
4 ANECO 54.50
4
5 SURSECO II 13.39
5
6 ASELCO 33.01
7 SURSECO I 10.79
7 Total 148.65
6
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 473,234 134,348
Commercial 21,841 220,023
Industrial 1,584 58,131
Others 14,787 334,770
Total 511,446 747,272
162
CARAGA Distribution Utilities
163
AGUSAN DEL NORTE ELECTRIC COOPERATIVE, INC (ANECO)
Number of Barangays: Status of Household Energization:
Grid: 253 97.1 % (151,845 HH / 156,300 HH)
Off-grid: -
100.00
80.00
Actual
SS 60.00
MW
No. SS Name
Capacity 40.00
1 Santiago S/S 5 MVA Supply
2 Cabadbaran S/S 5 MVA 20.00
3 Soriano S/S 5 MVA Demand
4 Emco S/S 5 MVA 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
5 Ampayon S/S 10 MVA Supply Indicative 0.00 0.00 0.00 0.00 0.00 1.10 4.76 8.45 12.43 15.88
6 Villakanangga S/S 10 MVA Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 Butuan S/S 40 MVA Supply Contracted: Captive Customers 60.51 79.47 104.43 74.43 74.43 74.43 74.43 74.43 74.43 74.43 74.43
8 Manapa S/S 15 MVA Peak Demand: Franchise 54.50 58.33 61.53 64.89 68.36 71.91 75.53 79.19 82.88 86.86 90.31
9 Nasipit S/S 5 MVA Peak Demand: Captive Customers 54.50 58.33 61.53 64.89 68.36 71.91 75.53 79.19 82.88 86.86 90.31
AGUSAN DEL SUR ELECTRIC COOPERATIVE, INC (ASELCO)
Number of Barangays: Status of Household Energization:
Grid: 301 92.4 % (131,417 HH / 142,300 HH)
Off-grid: 13
60.00
50.00 Actual
40.00
MW
30.00
Supply 20.00
Demand 10.00
SS
No. SS Name
Capacity 0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
1 Bayugan S/S 10 MVA Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.63 3.25
2 Talacogon S/S 5 MVA Supply for PSA Approval: Captive Customers 10.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00
3 San Francisco S/S 10 MVA Supply Contracted: Captive Customers 36.89 44.10 34.10 46.82 46.82 46.82 46.82 46.82 46.82 46.82 46.82
4 Philsaga S/S 20 MVA Peak Demand: Franchise 33.01 38.84 42.10 45.26 48.32 51.31 54.21 57.03 59.78 62.45 65.07
5 Trento S/S 5 MVA Peak Demand: Captive Customers 33.01 38.84 42.10 45.26 48.32 51.31 54.21 57.03 59.78 62.45 65.07
164
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
165
SIARGAO ELECTRIC COOPERATIVE, INC. (SIARELCO)
Number of Barangays: Status of Household Energization:
Grid: 126 91.8 % (29,006 HH / 31,600 HH)
Santa Monica
Off-grid: 6
Burgos
Franchise Area: Customer Captive Customer
Sales (MWh)
650.4 sq. km. Classification Connection
Residential 27,292 12,232
Franchise Population:
San Benito Commercial 911 4,634
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
110,653
Industrial - -
Circuit kilometer: Others 803 2,359
567.3
TOTAL 29,006 19,226
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
General Substation System Loss: 1,726 MWh (8.24 %)
Luna Backbone Line
Demand Annual Average Growth Rate (2016-2025) : 5.41 %
Middle
8.00
Bucas
7.00
Socorro
6.00
Actual
5.00
East Bucas 4.00
MW
3.00
Supply 2.00
Demand 1.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.20 2.74 2.97 3.18 3.53 3.86 4.20 4.52 4.83 5.13
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SS Supply Contracted: Captive Customers 4.21 4.28 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
No. SS Name
Capacity Peak Demand: Franchise 4.21 4.49 4.74 4.97 5.18 5.53 5.86 6.20 6.52 6.83 7.13
1 Cagdianao S/S 5 MVA Peak Demand: Captive Customers 4.21 4.49 4.74 4.97 5.18 5.53 5.86 6.20 6.52 6.83 7.13
SURIGAO DEL NORTE ELECTRIC COOPERATIVE, INC. (SURNECO)
Number of Barangays: Status of Household Energization:
Grid: 188 86.7 % (70,213 HH / 81,000 HH)
Off-grid: 15
Hikdop Island
50.00
Actual
40.00
LEGEND: 30.00
MW
Energized DU System
Substation 20.00
Backbone Line Supply
10.00
Demand
0.00
SS 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
No. SS Name Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
1 Looc S/S 20 MVA Supply for PSA Approval: Captive Customers 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Mapaso S/S 5 MVA Supply Contracted: Captive Customers 18.22 31.23 33.25 49.00 56.80 56.80 56.80 56.80 56.80 56.80 56.80
3 Tubod S/S 10 MVA Peak Demand: Franchise 29.68 29.95 33.34 35.38 37.32 41.48 43.73 46.12 49.11 51.71 54.40
4 Claver S/S 5 MVA Peak Demand: Captive Customers 29.68 29.95 33.34 35.38 37.32 41.48 43.73 46.12 49.11 51.71 54.40
166
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
167
SURIGAO DEL SUR I ELECTRIC COOPERATIVE, INC. (SURSECO I)
Number of Barangays: Status of Household Energization:
Grid: 112 96.1 % (72,153 HH / 75,100 HH)
Off-grid: -
Industrial 4 3,416
Circuit kilometer:
Others 1,330 6,417
1,027.6
TOTAL 72,156 49,303
Customer/s Served by RES:
Sales for Customer/s served by RES:
20.00
Actual
15.00
LEGEND:
MW
Energized DU System 10.00
Substation Supply
Backbone Line 5.00
Demand
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS
No. SS Name Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
Supply for PSA Approval: Captive Customers 4.00 9.00 9.00 9.00 9.00 9.01 9.01 9.01 9.01 9.01
1 Tabon S/S 5 MVA
Supply Contracted: Captive Customers 8.68 7.64 5.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00
2 San Fernando S/S 5 MVA
Peak Demand: Franchise 10.79 11.02 11.33 11.63 11.92 12.20 12.47 12.74 12.99 13.25 13.49
3 Barobo S/S 5 MVA
Peak Demand: Captive Customers 10.79 11.02 11.33 11.63 11.92 12.20 12.47 12.74 12.99 13.25 13.49
SURIGAO DEL SUR II ELECTRIC COOPERATIVE, INC. (SURSECO II)
Number of Barangays: Status of Household Energization:
Grid: 191 90.4 % (70,687 HH / 78,200 HH)
Off-grid: 6
MW
Energized DU System 20.00
Substation Supply 15.00
Backbone Line
10.00
Demand 5.00
SS 0.00
No. SS Name 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Capacity Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Madrid S/S 5 MVA Supply for PSA Approval: Captive Customers 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00
2 Tandag S/S 10 MVA Supply Contracted: Captive Customers 17.22 16.47 10.46 23.46 23.46 23.46 23.46 23.46 23.46 23.46 23.46
3 Cagwait S/S 5 MVA Peak Demand: Franchise 13.39 14.78 15.77 17.00 18.49 20.27 22.36 24.81 27.62 30.84 34.48
4 Lianga S/S 5 MVA Peak Demand: Captive Customers 13.39 14.78 15.77 17.00 18.49 20.27 22.36 24.81 27.62 30.84 34.48
168
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
169
DINAGAT ISLAND ELECTRIC COOPERATIVE, INC. (DIELCO)
Number of Barangays: Status of Household Energization:
Grid: - 82.4 % (23,976 HH / 29,100 HH)
Off-grid: 100
Industrial - -
Circuit kilometer: Others 961 1,933
365.4
TOTAL 22,830 13,119
Customer/s Served by RES:
LEGEND: Sales for Customer/s served by RES:
Energized DU System
Substation
Backbone Line
System Loss: 735 MWh (5.31 %)
6.00
5.00
Actual
4.00
MW
Cagdianao 3.00
Supply 2.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Dinagat Supply Indicative 0.00 0.00 3.65 3.93 4.23 4.56 4.92 5.30 5.71 6.14
Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SS Supply Contracted: Captive Customers 4.21 4.81 5.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name
Capacity Peak Demand: Franchise 3.06 3.16 3.39 3.65 3.93 4.23 4.56 4.92 5.30 5.71 6.14
1 NPC-SPUG Dinagat - Peak Demand: Captive Customers 3.06 3.16 3.39 3.65 3.93 4.23 4.56 4.92 5.30 5.71 6.14
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
ARMM
Distribution
of Distribution Utilities
Utilities Per Region
Peak
Distribution
Demand
1 Utility (MW)
ARMM
1 LASURECO 23.69
System Map
2 MAGELCO 11.32
2
3 BASELCO 8.36
3
4 SULECO 7.87
4 5 SIASELCO 0.66
6 TAWELCO 4.92
6 5
Total 56.82
2015
Customer 2015
Number of
Classification Energy Sales
Customers
Residential 132,073 19,836
Commercial 5,832 7,153
Industrial 211 16,072
Others 1,939 144,879
Total 140,055 187,940
170
ARMM Distribution Utilities
171
LANAO DEL SUR ELECTRIC COOPERATIVE, INC. (LASURECO)
Number of Barangays: Status of Household Energization:
Grid: 1,159 40.4 % (56,357 HH / 139,500 HH)
Franchise Area: Off-grid: 24
13,979 sq. km.
Customer Captive Customer
Sales (MWh)
Franchise Population: Classification Connection
1,025,209 Saguiaran
Residential 48,647 62,127
Pantar
Piagapo Ditsaan-Ramain Commercial 2,056 5,737
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Circuit kilometer:
1,159.3 Buadiposo-Buntong Industrial 20 676
Balindong Mulondo Others 678 3,511
TOTAL 51,401 72,052
Bacolod Kalawi
Madamba Poona Bayabao Customer/s Served by RES:
Pualas Sales for Customer/s served by RES:
45.00
Sultan
40.00
Dumalondong Actual
35.00
30.00
25.00
Kapatagan
MW
20.00
Supply 15.00
LEGEND:
Energized DU System 10.00
Substation
Demand 5.00
Backbone Line
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 25.77 25.77 27.77 27.77 28.77 28.77 29.77 29.77 30.77 30.77
SS Supply for PSA Approval: Captive Customers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No. SS Name Supply Contracted: Captive Customers 17.96 10.23 10.23 10.23 10.23 10.23 10.23 10.23 10.23 10.23 10.23
Capacity
1 Dansalan S/S 40 MVA Peak Demand: Franchise 23.69 36.00 36.00 38.00 38.00 39.00 39.00 40.00 40.00 41.00 41.00
Peak Demand: Captive Customers 23.69 36.00 36.00 38.00 38.00 39.00 39.00 40.00 40.00 41.00 41.00
MAGUINDANAO ELECTRIC COOPERATIVE, INC. (MAGELCO)
Number of Barangays: Status of Household Energization:
Grid: 330 23.7 % (27,485 HH / 116,200 HH)
Off-grid: 49
30.00
25.00
Datu
Abdullah 20.00
Sanki Actual
MW
15.00
LEGEND:
Supply 10.00
Energized DU System Demand
Substation 5.00
Backbone Line
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
SS Supply Indicative 0.00 8.97 13.13 13.85 14.59 15.36 16.16 16.97 17.81 18.66
No. SS Name
Capacity Supply for PSA Approval: Captive Customers 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
1 Simuay S/S 10 MVA Supply Contracted: Captive Customers 4.52 4.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Salbu S/S 5 MVA Peak Demand: Franchise 11.32 13.04 18.97 23.13 23.85 24.59 25.36 26.16 26.97 27.81 28.66
3 Capiton S/S 5 MVA Peak Demand: Captive Customers 11.32 13.04 18.97 23.13 23.85 24.59 25.36 26.16 26.97 27.81 28.66
172
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
173
BASILAN ELECTRIC COOPERATIVE, INC. (BASELCO)
Number of Barangays: Status of Household Energization:
Grid: - 55.5 % (42,305 HH / 76,200 HH)
Off-grid: 269
Tuburan
Industrial 7 1,079
Maluso Others 399 3,597
Tipo Tipo
Franchise Area: TOTAL 29,321 25,918
Al Barka
1,359 sq. km. Customer/s Served by RES:
Sales for Customer/s served by RES:
Franchise Population: Ungkaya Pukan
391,179 System Loss: 11,226 MWh (30.22 %)
Circuit kilometer:
679.6 Demand Annual Average Growth Rate (2016-2025) : 8.13 %
Tabuan-Lasa 20.00
18.00
LEGEND: 16.00
Energized DU System 14.00
Substation
Actual
12.00
Backbone Line 10.00
MW
8.00
Tongkil
Supply 6.00
Demand 4.00
2.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 7.18 7.94 8.82 9.85 11.03 12.37 13.89 15.60
SS Supply for PSA Approval: Captive Customers 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
No. SS Name Supply Contracted: Captive Customers 9.82 10.15 10.46 0.64 0.64 0.64 0.64 0.64 0.64 0.64 0.64
Capacity
1 NPC-SPUG Basilan - Peak Demand: Franchise 8.36 8.65 9.19 9.82 10.58 11.46 12.49 13.67 15.01 16.53 18.24
Peak Demand: Captive Customers 8.36 8.65 9.19 9.82 10.58 11.46 12.49 13.67 15.01 16.53 18.24
SIASI ELECTRIC COOPERATIVE, INC. (SIASELCO)
Number of Barangays: Status of Household Energization:
Grid: - 31.5 % (4,258 HH / 13,500 HH)
Franchise Area: Off-grid: 66
18.0 sq. km.
Customer Captive Customer
Franchise Population: Sales (MWh)
Classification Connection
17,029
Residential 2,481 1,761
Circuit kilometer: Commercial 234 587
-
Industrial
Others 144 208
TOTAL 2,859 2,556
Customer/s Served by RES:
Sales for Customer/s served by RES:
2.50
2.00
1.50
MW
Supply 1.00
174
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
175
SULU ELECTRIC COOPERATIVE, INC. (SULECO)
Number of Barangays: Status of Household Energization:
Kulassian Grid: - 30.8 % (26,428 HH / 85,800 HH)
Pandukan
Off-grid: 330
Industrial - -
Others 29 4,556
Capual
TOTAL 15,208 32,685
Customer/s Served by RES:
Sales for Customer/s served by RES:
MW
395.7
Supply 4.00
LEGEND: Demand 2.00
Energized DU System
Substation 0.00
Backbone Line 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.20 0.20 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SS Supply for PSA Approval: Captive Customers 0.00 0.00 8.50 8.85 9.05 9.35 9.65 9.90 10.05 10.30
No. SS Name Supply Contracted: Captive Customers 7.35 8.00 8.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Capacity
1 NPC-SPUG Sulu - Peak Demand: Franchise 7.87 8.20 8.40 8.60 8.80 9.00 9.30 9.60 9.85 10.00 10.25
Peak Demand: Captive Customers 7.87 8.20 8.40 8.60 8.80 9.00 9.30 9.60 9.85 10.00 10.25
TAWI-TAWI ELECTRIC COOPERATIVE, INC. (TAWELCO)
Number of Barangays: Status of Household Energization:
Grid: - 27.8 % (13,110 HH / 47,200 HH)
Off-grid: 186
Franchise Area:
1,208.1 sq. km. Customer Captive Customer
South Ubian
Sales (MWh)
Classification Connection
Franchise Population:
86,926 Residential 10,225 11,235
Commercial 557 3,861
Circuit kilometer:
198.6
Industrial - -
Tandubas
Languyan Tandubas Others 263 1,449
TOTAL 11,045 16,544
Panglima Sugala Customer/s Served by RES:
Sapa-Sapa
Bongao Sales for Customer/s served by RES:
Sitangkai 25.00
Sibutu
20.00
15.00
MW
LEGEND: Actual
Energized DU System
Supply 10.00
Substation
Demand 5.00
0.00
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Supply Indicative 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
SS Supply for PSA Approval: Captive Customers 5.68 5.85 6.39 6.99 7.65 8.37 9.16 10.03 10.98 12.02
No. SS Name Supply Contracted: Captive Customers 5.40 5.68 5.85 6.39 6.99 7.65 8.37 9.16 10.03 10.98 12.02
Capacity
1 NPC-SPUG Bongao - Peak Demand: Franchise 4.92 5.66 6.51 7.48 8.61 9.90 11.38 13.09 15.05 17.31 19.90
Peak Demand: Captive Customers 4.92 5.66 6.51 7.48 8.61 9.90 11.38 13.09 15.05 17.31 19.90
176
DISTRIBUTION DEVELOPMENT PLAN, 2016-2025
Redentor E. Delola
Assistant Secretary
Irma C. Exconde
Assistant Director
Thelma B. Ejercito
OIC-Chief, Power Planning and Development Division
Madonna M. Naling
Rodel S. Limbaga
Verdick D. Idanan
Ladylyn T. Castañeda - Salvanera
Andrew P. Catayong
Cezar John A. Estrada
Marc Louie L. Olap
Arthur Kent M. Holt
Gilbert T. Sy
Department of Energy
Energy Center, Rizal Drive, Bonifacio Global City (BGC)
Taguig City, Philippines 1632
Tel. Nos. 840-2173; 479-2900 local 202, 386
Website: http://www.doe.gov.ph
Facebook: http://www.facebook.com/doe.gov.ph
Instagram: @DOE_PH
Twitter: @DOE_PH