Title: Topographic Survey for Dam, Pipeline & Access Road Design.
(Naselesele Village, Taveuni)
1. .Introduction:
Topographic study is just the account of directions and tallness information of existing highlights situated in a
specific study territory. This information can be utilized to make spot stature maps, shape maps, or
progressively complex landscape models of the reviewed zone. The aim of this project is to do a
topographical survey for Dam, Pipe Alignment & Access road design at Naselesele village in the Island of
Taveuni.
A topographic survey locates and maps the physical features of a property or landscape. It also indicates
varying levels of elevation, vegetation, and underground utility installations
2. Background:
Taveuni region is currently supplied with water surface sources and a number of boreholes, which is
chlorinated before it enters the distribution system. The existing infrastructure is aging and required
upgrading, the reservoir do not have requires an alternative source of water to cater for such crisis.
The region is subjected to periodic droughts, which result in water shortages for both existing consumers and
other people in the study area who rely on local sources of supply.
Naselesele Village falls towards the Northern side of Taveuni. The village has a borehole, which fills its own
reservoir. Due to the recent drought, the potential of this source dropped, thus, required demand cannot be
met.
Our Team has located a source at the upper Mua area through Water Authority where a gravity Dam is likely
to be constructed and this will replace the Naselesele source.
Therefore, this research will based on the topographic surveying of pipeline route, dam location and access
road through Naselesele village.
The proposed site for our project is NaseleseleVillage situated in the island of Taveuni
[Document title]
4. Objectives:
To compile plans and Trig information in the area for traverse closure and checking
To conduct topographical survey of the possible route, Dam location and access road within our study
area.
To design a gravity dam, access road and pipe alignment using our topographical data
5. Methodology:
The proposed strategies for our information gathering are as per the following.
Key Outcomes:
Schedules: Information, for example, assessment chamber modifies, pipe measurement sizes,
and so on can be produce.
References:
file:///C:/Users/User/Desktop/toposurveying/entire-4511.pdf
https://www.ths-concepts.co.uk/what-is-a-topographic-survey/
http://uregina.ca/~sauchyn/geog411/topographic_surveying.html
[Document title]
Weeks 1 2 3 4 5 6 7 8 9 10 11 12 13 14
Selection of Project
Title
Project Proposal
Submission
Discussion &
Preparation of the
Project
Proceed with
Capstone Project
Literature Review
Submission of
Literature Review
Review of
Implementation Plan
Collection of Data