Sunteți pe pagina 1din 16

Government College University Faisalabad

FORMAT FOR PREPARATION OF TRAINING REPORT


(Sixteen Weeks)

ARRANGEMENT OF CONTENTS:
The sequence in which the training report material should be arranged and bound as
follows:

1. Cover Page
2. Inner Title Page (Same as cover page)
3. Certificate by Company/Industry/Institute
4. Certificate by Student
5. Acknowledgement
6. About Company/industry/institute
7. Table of Contents
8. List of Tables
9. List of Figures
10. Abbreviations and Nomenclature(If any)
11. Chapters
12. References
13. Data Sheet(If any)

The tables and figures shall be introduced in the appropriate places.

TYPING INSTRUCTIONS:

 The training report must be submitted in one Copy duly signed by the HOD. Students
should also submit the soft copy of report and presentation on CD in pdf+ doc format.
 The length of the training report may be about 40 to 70 page.
 The training report shall be computer typed (English- British, Font -Times Roman, Size-
12 point) and printed on A4 size paper. (Heading, titles and subtitles should be according
to format given in the sample)
 The training report shall be hard bound with cover page in Black color. The name of the
students, degree, duration of training period, name of the university including institute
name shall be printed in Golden letters on the cover page [Refer to sample sheet (outer
cover page)]
 The training report shall be typed with 1 line spacing with a margin 3.5 cm on the left,
2.5 cm on the top, and 1.25 cm on the right and at bottom. Every page in the report must
be numbered. The page numbering, starting from acknowledgements and till the
beginning of the introductory chapter, should be printed in small Roman numbers, i.e, i,
ii, iii, iv...... The page number of the first page of each chapter should not be printed (but
must be counted). All page numbers from the second page of each chapter should be
printed using Arabic numerals, i.e. 2,3,4,5... All printed page numbers should be located
at the bottom centre of the page.
 In the training report, the title page [Refer sample sheet (inner title pager)] should be
given first and printed in black letters.
 The table of contents should list all headings and sub-headings. The title page and
certificates will not find a place among the items listed in the Table of Contents. One and
a half line spacing should be adopted for typing the matter under this head.
 The list of tables should use exactly the same captions as they appear above the tables
in the text. One and a half spacing should be adopted for typing the matter under this
head.
 The list of figures should use exactly the same captions as they appear below the figures
in the text. One and a half spacing should be adopted for typing the matter under this
head.
 The list of symbols, abbreviation & nomenclature should be typed with one and a half
line spacing. Standard symbols, abbreviation etc should be used.
 Training report should consist of following chapters.
a. Chapter 1- Introduction
(Industrial Background
General introduction of your industry, year of establishment, evolution during the time,
address and website etc.

Organogram of Industry
Managerial structure of the organization including different department heads and
subordinates titles.

Products of Industry
What are the products of Industry and to which market these are exported? Who are the
potential users of industrial products?
)
b. Chapter 2- Training Work
Process Layout for Different Products
All steps involved from raw material to end product.

Machines Installed in the Industry


Details regarding the machines installed in industry, their purpose and working.
Complete layout and Single Line diagram of all electrical wiring in your industry.
Monthly and annually maintenance steps executed in your industry.

c. Chapter 3- Skill Attained.


Skills Attained
Specify the department in which you have worked, specify the machines, instruments,
equipment you were trained on. Any operation or maintenance task assigned to you.

d. Chapter 4-Feedback & Recommendations


Any Difficulty Faced during the Training

Your Feedback Regarding the Curriculum


What additional things or changes should be added in curriculum for the improvement
and development of your department in GCUF Sahiwal Campus?

REMEMBER:
Each chapter should be given an appropriate title. Tables & figures in a chapter
should be placed in the immediate vicinity of the reference where they are cited.
Footnotes should be used sparingly. They should be typed single space and placed
directly underneath in the very same page, which refers to the material they
annotate. Conclusion must not exceed more than two pages. Future scope also
must not exceed one page.

 The listing of references should be typed 4 line spaces below the heading
“REFERENCES” in alphabetical order in single spacing left – justified.
Please omit the unnecessary item in RED color like formats etc before printing

[SAMPLE SHEET (OUTER COVER PAGE)]

SUPERVISED INDUSTRIAL TRAINING REPORT


(21pt, Bold)

NATIONAL HYDRO POWER GENERATION


(Company Name)(18pt., 1.5line spacing, Centre Aligned, Bold)
TERBALA POWER STATION, ISLAMABAD
(Company Address)(14pt., 1.5 line spacing, Centre Aligned, Bold)

BSc ELECTRICAL ENGINEERING TECHNOLOGY (14pt, Bold)

SUBMITTED BY (14pt, Bold)

Muhammad Ali (Name, 14pt)


GCUF-….. (Reg. Number14pt)
1823 (ROll Number14pt)

Training Period
01-05-12 to 15-06-12 (14pt)

DEPARTMENT OF ELECTRICAL ENGIEERING


GOVERNMENT COLLEGE UNIVERISITY FAISALABAD
SAHIWAL CAMPUS (14pt, Bold)

2015
SAMPLE SHEET (INNER TITLE PAGE)

SUPERVISED INDUSTRIAL TRAINING REPORT


NATIONAL HYDRO POWER GENERATION
TERBALA POWER STATION, ISLAMABAD

SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE AWARD OF


THE DEGREE OF (12pt, Centre Aligned)

BSc ELECTRICAL ENGINEERING TECHNOLOGY

SUBMITTED TO

THE FACULTY OF THE ELECTRICAL ENGINEERING DEPARTMENT


GOVERNMENT COLLEGE UNIVERISITY FAISALABAD
SAHIWAL CAMPUS (14pt, Bold)

SUBMITTED BY
Name of Student (14pt) Roll No. (14pt)
Muhammad Ali 1823

Training Period
01-05-12 to 15-06-12 (14pt)

GOVERNMENT COLLEGE UNIVERISITY FAISALABAD


SAHIWAL CAMPUS
SAMPLE SHEET

ACKNOWLEDGEMENT
I would like to place on record my deep sense of gratitude to Er.. _____________, line manager of Light
I would like to place on record my deep sense of gratitude to Er.. _____________, line manager of Light
I would like to place on record my deep sense of gratitude to Er.. _____________, line manager of Light
I would like to place on record my deep sense of gratitude to Er.. _____________, line manager of Light
I would like to place on record my deep sense of gratitude to Er.. _____________, line manager of Light
I would like to place on record my deep sense of gratitude to Er.. _____________, line manager of Light

Signature of Student

Muhammad Ali (1823)


SAMPLE SHEET

CERTIFICATE
I hereby certify that I have completed the Sixteen weeks Training in partial fulfillment of the requirements for the
award of BSc ELECTRICAL ENGINEERING TECHNOLOGY .I did my training in National Hydro Power
Corporation at Salal power station Dhyangarh, Reasi, Jammu & Kashmir from 01-05-12 to 15-06-12.

The matter presented in this Report has not been submitted by me for the award of any other degree elsewhere.

Signature of Student
Muhammad Ali (1823)

Examined by:

1. (Name of the Supervisor)


2. (Signature with date)

INCHARGE/HOD

Engineering Technology Department


SAMPLE SHEET

CERTIFICATE from the company


(This is only sample, attach the certificate provided by the company)

Note: This certificate must be typed on the company letter head.

This is to certify that Mr.___________________________ has partially


completed / completed / not completed the Training in our
Organization / Industry during the period 01-05-12 to 15-06-12. His
overall performance during the period was Excellent / Very Good / Good
/ Average / Poor.

Signature & Seal of Training Manager


SAMPLE SHEET

TABLE OF CONTENTS
Page No.

Acknowledgement i

About Company/industry/institute ii
List of Tables iii

List of Figures iv

List of Abbreviations v

List of Nomenclature vi
Chapter 1: Introduction

1.1 2

1.2 .... ......... 8

1.2.1 10

1.2.2 ........... 12

1.2.2.1 13

1.2.2.2 . . . . . . . . . . 15

1.2.2.3 . . . . . . . . . . 16

1.2.3 . . . . . . . . . . . . 17

1.3 . . . . . . . . . . .. . . . . . . 18
1.4 .................. 19

Chapter 2: Training Work 20

2.1 22
2.2 ……………. 23

2.2.1 26

2.2.2 ………… 27

2.3 29

Chapter 3: Skill Attained 30


Chapter 4: Feedback & Recommendations 43
References 59
Data Sheet
Sample Sheet
List of Tables

Table Title Page

3.1 Values Assigned to Standard k-ε Turbulence Model Coefficients ................ 55

3.2 Values Assigned to RNG k-ε Turbulence Model Coefficients ...................... 57

4.1 Engine Specifications. .................................................................................... 90

4.2 Geometrical Details of the Injector ................................................................ 90

4.3 Boundary and Initial Conditions .................................................................... 94

4.4 Grid Independence Study ............................................................................... 99


Sample Sheet

LIST OF FIGURES

Figure Title Page


3.1 Lagrangian Droplet Motion ........................................................................... 70

4.1 Vertical Manifold. ........................................................................................ 95

4.2 20O Bend Manifold......................................................................................... 95

4.3 90O Bend Manifold....................................................................................... 95

4.4 Spiral Manifold .............................................................................................. 95

4.5 Spiral Manifold Configuration (θ = 225o) ..................................................... 96

4.6 Spiral Manifold with Different Flow Entry Angles (20 O, 32.5O and 45O)........ 96
Sample Sheet

NOMENCLATURE

English Symbols

A Pre-exponential constant

Cp Specific heat,J/kg-K

c Reaction progress variable

Dd Instantaneous droplet diameter, m

Dm Instantaneous droplet diameter


Sample Sheet

ABBREVIATIONS

ATDC After Top Dead Center

BDC Bottom Dead Center

BTDC Before Top Dead Center

CA Crank Angle

CAD Computer Aided Design

CCS Combined Charging System

CFD Computational Fluid Dynamics

CO Carbon Monoxide

CTC Characteristic– Time Combustion

S-ar putea să vă placă și