SPECIAL BOILER
MANUFACTURE CO., LTD.
Ⅴ Installation illustration
(Ⅶ)Maintenance …………………………………………………......(12)
Relief valve
Relief valve
Burner
Connect to
water softener
Ⅱ、Performance Characteristics
WNS series fuel oil (gas) steam boiler has the below characteristics:
(Ⅰ)The structure of the boiler is compact and fitted with imported burner( optional
for user's requirement), the main part (for fuel oil) of burner, such as oil pump、
fan、magnetic valve、ignition device and air register are all installed together;
automatically feed water according to water level change, devices that
automatically adjust the fan and oil proportion in load change of boiler are all very
convenient to operate;
(Ⅱ)Boiler system has burn out protection and low limit water level protection,
steam overpressure protection and alarm light device, they are all easy to
manipulate and reliable;
(Ⅲ)The boiler is completed equipped with auxiliary parts, after the whole
installation of boiler go to field out of factory, it is only need to install water
treatment、pipeline、chimney and connecting water、electricity、fuel(gas) , with
a short installation period;
(Ⅳ)Compact structure with little coverage of land, this can save the land invest
of boiler, and easy for installation and movement.
(Ⅴ)All kinds of boiler can selected matching burners which are suitable to light
oil、heavy oil、natural gas、coal gas and liquefied petroleum gas, adaptable and
with wide selection range.
Relief valve
Connect to
Maximum security level the chimney
Normal water level
Total valve
connect to
steam header Connect to water
pipe network
drainage
Oil-spill pipe
Drain pipe
Inlet tube
DN15
Outlet tube
Oil pointer
Drains
<1m3
drainage
outlet
Salt box
DN15
tubes
Drain contaminationDN40
Drains
Connect to
water softener
Oil tank
Ⅴ、Installation illustration
(Ⅰ)Preparing work before installation
The design of boiler room should commit by qualified construction units, and
agreed by related institution in advance, the arrangement of boiler room should
meet the related requirement. After the boiler carried to field, in order to operation
quickly, need to do following preparing work:
1 、Staff preparation
The installation of boiler should undertake by the unit who get the boiler
installation license, installation unit should equip with plumber、fitter、electrician、
crane man、Cold welder and auxiliary worker;They should work with fireman
together.
2 、Organize related people study materials
Organize related people to familiar with 《 Steam boiler safety technical
inspection regulation 》 、 boiler drawing 、 this 《 Installing and operating
instructions》, these technical documents will help to know and master the
procedure of install crane operation.
3 、Locate the installation place.
A、The installation place is better to get close to steam using place. In order to
slow down the construction expense and low down the pipe heat loss;
B 、Prepare the supply voltage of 380V and 220V,power should conform to the
boiler's total volume;
C、Convenience of water supply and pollution discharge;
D 、The convenience of storage and transportation of fuel;
E、The arrangement of boiler should conform to the boiler regulations in chapter
8 of 《steam boiler safety technical inspection regulations》published by labor
ministry;
F、When boiler is in installation and transportation please make sure in a good
road;
4 、Foundation preparation
According to boiler general drawing of boiler,draw out the overall mounting base,
make it can bear the weight of boiler.
5、Device inspection and acceptance
A、After the boiler arrived,check all the things according our company out of
factory list. According to overall drawing, recheck the completeness and condition
of device;
B 、When unload the whole boiler, can put pipe under the side channel, use steel
rope to pull it, make the whole boiler move slowly on the rolling pipe, the place to
insert the steel rope should be the former or back hole of two sides channel on
the base,any part of the boiler body shouldn't broken.
C 、If the boiler body need to be hosting, the hosting ability of device shall not
lower than boiler's transporting weight. Hosting rope should be installed on the 2
groups (or front and back) of hosting ring on boiler roof, do not host on random
place.
(Ⅱ) Installation requirement
1、The installation of boiler whole body
After lay the boiler, the left and right side of water level, left and right side of
water level should keep horizontal, allowed water gauge elevation derivation
should not exceed ±5mm, or should block up the lower steel plate, boiler can be
higher in front and lower in back, the allowance of difference can be 0-50mm;
2 、Installation of water feed pipeline
Water feed should comfort to GB1576《Industry boiler water quality regulation》;
outlet of soft water box should install the steel filter,generally the high level of
water box is required to be lower than the boiler ordinary water level. This can
avoid the water flow back into boiler when boiler stops; make the result that when
in next start has to discharge much water.
3、Main steam pipeline installation
The straight section which stretches out main steam pipe should be longer than
0.5m, between the main steam pipe and section cylinder should set two bends,
the diameter of them should bigger than 3 times of pipe diameter, or should install
expansion section. The lowest of pipe should install drain valve,to prevent pipe
shock by water, main steam pipe should be warm.
4、Oil supply pipe installation
A 、 Oil tank should equip with water drain valve atmospheric valve, on the
atmospheric valve should install fire arrestor, on the pipe of oil inlet and outlet
should install filter. The installation place depends on concrete circumstances,
generally it will install on ground or underground, the total length should less than
5mm, when the oil tank is placed underground, should keep the height difference
of ground and oil pump center lower than 2.5cm.
B、Daily-use oil tank should set oil level auto-control system (by user), and
overflow pipe(diameter should be bigger thanDN32)、overflow oil will go back to
oil tank, oil outlet also should install filter, the installation place is better to higher
than burner, in order for the inhale oil of burner.
C、There are "oil in " and " oil return" two port, only need to connect the related
oil pipe and water-return oil pipe of daily-use oil tank and install the filter on the
oil port.
D、Oil pipeline should equip with filter. One of the fuels of boiler is light diesel oil.
After the oil supply distribution of light diesel oil should heat oil. So in all seasons
should use low grade diesel. If have condition, user should do frost protection
measure to avoid fuel oil frozen.
E、Daily-use oil tank and oil storage tank should conform to fire controlling
requirement.
5、Fuel gas pipeline installation
A、Boiler fuel gas should keep a "gas inlet" port,only need to connect the gas
supply pipe of boiler ;
B、Gas pipe including stop valve、filter、reducing valve、magnetic valve、leak
inspection device consisted of pressure control components and adjusting valve;
C、The most unsafe factor of fuel gas is leaking,so when during installing, make
sure to check the fuel gas pipeline strictly and especially the check of magnetic
valve,in order to prevent the explode and fire accident caused by fuel gas leaking.
6、Requirement of chimney
A、Requirement of chimney
Chimney should be installed vertically. The length between the chimney of boiler
commonly not be longer than 10m,bend not more than three and are not the
90℃ right angle bend. The height of the chimney usually is 15m and comfort for
requirement of environment protection. The outlet of chimney should better
installed rain hat,the distance between lower edge of chimney hat and chimney
outlet should longer than 0.7 times of chimney diameter. Chimney also should
have thunder-arresting measurement.
B、The chimney should have right angle bend, must use curve bend, this is to
prevent the resistance of smoke too big to deteriorate the combustion and smoke
flow situation.
C、Each boiler should have separate chimney, do not use a same chimney with
the other boiler, or it will make the combustion status get worse.
D、In west plateau area of China, because the atmosphere pressure is low, the
water steam bill be easy to change to dew and drop into back smoke box. This
will damage the smoke case and more easily to happen especially in the low load
of boiler and low temperature of atmosphere. To avoid this, installation unit can
install a ring and discharge the water in the ring. Detailed method: Install a steel
ring which is bent by 4.5/2.8 inequilaterally angle steel with on the 100mm upper
of chimney flange joint of chimney and boiler,weld the chimney in the inner
diameter, make it to be water storage plate, (also can use steel pipe withΦ50mm,
divide to 4 part along the diameter, then bend and weld it to a steel ring)make
the dew water receive by steel ring, then drill a little hole on the water plate,
install on socket and induct the dew water to ground.
7、Water pump installation
When install the vertical pump should be perpendicular to foundation plan.
(Ⅲ)Main function of electric control box
On the electric control box gathers boiler controlling(burner、water pump and
automatic control)switch button,user can use wire to connect burner、water
pump, and motor electrode water level controller and pressure regulator
according to "electric diagrams",then get through external main power,the box
case should be protectively earthing , detailed instruction should refer to
installation and use instructions of electric controlling box.
(Ⅳ)Installation of pipe、instrument、valve and auxiliary parts
l 、Install according to tube valve instrument drawing.
2 、The safety valve should installed after the water pressure test,safety valve
should install steam discharge pipe to discharge steam to safety place out of
boiler room. In the lowest of steam discharge pipe should install conduit pipe,
valve is not allowed to install on conduit pipe.
3 、Pollution discharge pipe connected to blow down tank or other safe place,
pipe should be firm, to avoid the movement of pipe and come to strike back and
scald accident
4 、The steam pipe of main steam valve should be connected by user, at least
should have 2 bends, or draw tube should be added, keep the warmness of pipe
outer face.
standard5 、 The elevation deviation of water gauge shall not
exceed±5mm,( boiler normal is the criterion), on the gauge should mark with
“highest level"|"lowest level" and ordinary level. The lower water drain pipe of
water gauge, must connected to a safety place,the gauge should be flexible
without leakage, lighting facility should be installed for inspection.
6 、When install pressure gauge and electric contact pressure,need to make
the dial vertical, mark red line on pressure gauge, display the permit highest
working pressure. The pressure surge pipe is forbidden to keep warm.
7 、The boiler is equipped with pressure regulator or electric connecting pressure
gauge,installation unit adjust the actual highest and lowest using pressure
according to user's requirement. In trial operation if pressure reach to this valve
will stop boiler automatically, restart the burner when pressure turn down back,
keep on trail operation , make working pressure always in an extent range.