6000 4250

2Y16@250mmcc
2Y16@250mmcc 2Y16@250mmcc
NOTES:
3RD FLOOR 250 GENERAL:
DESCRIPTION:
250 x 650mm thick beam

650
8Y16@200mmcc 1. All dimensions to be checked on site
well jointed and bedded in
Y8 STIRRUPS sand mortar mix class 1:3 before commencement ofany work.
and reinforced with 8 high Use figured dimensions only.
6Y20@250mmcc
BEAM 1 steel reinforcement bars at Any discripancies should be reported
3,100

200mmcc secured by Y8 to theArchitect immediately.


C1 6Y16@250mmcc
BEAM 1 stirrups at 200mmcc.
2. All dimensions are in milimetres

3,000
LOCATION : unless otherwise specified as interior
Ground-2nd floor
17x5 Y8@200mmcc Links room dimensions in metres.

C2
LENGTH:
6000 & 4250mm
CIVIL WORKS:
17x5 Y8@200mmcc Links NO : 84
1. All soils under slabs and around
external fountations to be treated for
D-01 termite control.
2ND FLOOR Detail 2. All soils on cut emberkments to be
6000 4250 stabilised. Slope not to exceed the
natural angle of repose.
4TH FLOOR 2Y16@250mmcc
2Y16@250mmcc 2Y16@250mmcc 3. All slabs at ground level to be
poured over 1000 gauge polythene
6Y20@250mmcc
250 sheeting on 50mm stone blinding
DESCRIPTION:
on hardcore.
3,100

6Y16@200mmcc

450
250 x 450mm thick beam
Y8 STIRRUPS well jointed and bedded in
6Y20@250mmcc sand mortar mix class 1:3 STRUCTURAL WORKS:

C1
and reinforced with 6 high 1. All black cotton soils to be removed
17x5 Y8@200mmcc Links 3,100 BEAM 2 steel reinforcement bars at
from all building plinths. All buildings
BEAM 2 200mmcc secured by Y8

C2 17x5 Y8@200mmcc Links


stirrups at 200mmcc.
LOCATION :
to be clear of black cotton soil to a
distance of 3m.

BEAM SCHEDULE
3rd-4th floor 2. All basement columns to be provided
LENGTH: with angle iron protection 1500mm high.
6000 & 4250mm 3. All paved surfaces to be clear of black
NO : 56 cotton soil to a distance of 500mm outside
the edge of the surface.
4. Refer to structural Engineers details
3RD FLOOR for all r.c works.
5. Fountation depth to be determined on
6Y20@250mmcc site to structural Engineer's approval.
3,100

6. All walls less than 200mm thick to be


steel metal balusters reinforced with hoop irons at
painted to approval. every alternate course.
C1 17x5 Y8@200mmcc Links 150mm reinforced concrete slab 7. All adjacent r.c work and masonry
walls to be tied with strap irons at every
300
300 to S.E details on floor above course.
6Y16@250mmcc
6Y20@250mmcc 100mm hardwood handrail with
550

1550
MECHANICAL WORKS:
30x6 metal section flat core-rail.
550

Y8Linkups@200mmcc
1. All sanitry fittings, doors, windows
GROUND Y8Linkups@200mmcc
and lifts to schedules.
FLOOR COLUMN 1
COLUMN 2 2. All plumping and drainage to comply
DESCRIPTION: 100mm hardwood handrail with with city council's specifications.
DESCRIPTION: 300 x 550mm thick column 20mm thick masonary walling 30x6 metal section flat core-rail. 3. All service ducts to be accessible from
300 x 550mm thick column well jointed and bedded in every floor.
well jointed and bedded in sand mortar mix class 1:3
4. SVP denotes soil vent pipe to be
sand mortar mix class 1:3 175mm thick reinforced

1550
and reinforced with 6 Y16
and reinforced with 6 Y20 steel reinforcement bars at
1,100 provided at the head of drainage.
steel reinforcement bars at concrete stair slab
250mmcc secured by Y8
250mmcc secured by Y8
stirrups at 200mmcc.
steel metal balusters painted to
FIRE INSTALLATIONS
stirrups at 200mmcc. 150mm reinforced concrete slab approval. 1. Reserve at least 1200 liters of water
LEVEL :
LEVEL : 3RD - 4TH FLOOR to S.E details on floor above tank without automatic booster pump.
GROUND- 2ND FLOOR
HEIGHT: 3100 2. Emergency lighting system should
HEIGHT: 3100 NO : 24 be installed.
NO : 60 3. Install CO2 extinguishers together
SECTION XX SECTION YY with fire alarms in the kitchen.

COLUMN SCHEDULE

S-XX
1,100

B1-7Y20@200mmcc
15
Gauge 1000 polythene D.P.M 200
14 PROJECT TITTLE:
1,900

200 GROUND FLOOR


RC SLAB B2-11Y20@200mmcc 13
A42 BRC mesh Y12@200mmcc
12 PROPOSED MIXED URBAN DEVELOPMENT
steel reinforcement
1870/VIII/ 157
3,000

150mm Concrete slab BEAM 1 11


10
50mm quarry dust blinding Y12@200mmcc
RC masonry block wall 9
PROJECT TITTLE
MASONRY BLOCK
steel reinforcement
WALL
700

300mm crushed rock PROPOSED MIXED URBAN DEVELOPMENT


hardcore on approved B1-16Y20@200mmcc STAIR BASE
depth to be compacted soil backfill S-YY S-YY
200

200
800
determined on site MASONRY BLOCK 15 x 187 = 2,800
WALL RC stair base
Masonry fondation walling
DRAWING TITTLE:
200

reinfored conrete
B2-16Y20@200mmcc

2
1
7

5
4
3
reinfored conrete strip mix class 20 1100
50mm thick mix class 20 50mm thick
murram binding 3,000 STRUCTURAL DETAILS
murram binding
600 600 RC STAIR WALL
STAIR PLAN

S-XX
RC FOUNDATION WALLING RC STAIR BASE
FOUNDATION WALLING SCALE: 1 : 100

1,800 PROJECT TITTLE:


Y16@150mmcc
10Y25@ 200mmcc
16Y32@250mmcc T1-Y16@150mmcc T2-Y16@150mmcc PROPOSED MIXED URBAN DEVELOPMENT
10Y25@ 200mmcc

Y16@150mmcc
DRAWN BY:
1,800

150

Y8 STIRRUPS @200mmcc BEAM 2


550

B1-Y16@150mmcc B2-Y16@150mmcc

MWANIKI GI. PETER


800

B76/3596/2011
16Y32@200mmcc
RC SLAB DETAIL DETAIL 1
SUBMITTED :
300
16Y32@200mmcc
COLUMN BASE 6TH MAY, 2015