2Y16@250mmcc
2Y16@250mmcc 2Y16@250mmcc
NOTES:
3RD FLOOR 250 GENERAL:
DESCRIPTION:
250 x 650mm thick beam
650
8Y16@200mmcc 1. All dimensions to be checked on site
well jointed and bedded in
Y8 STIRRUPS sand mortar mix class 1:3 before commencement ofany work.
and reinforced with 8 high Use figured dimensions only.
6Y20@250mmcc
BEAM 1 steel reinforcement bars at Any discripancies should be reported
3,100
3,000
LOCATION : unless otherwise specified as interior
Ground-2nd floor
17x5 Y8@200mmcc Links room dimensions in metres.
C2
LENGTH:
6000 & 4250mm
CIVIL WORKS:
17x5 Y8@200mmcc Links NO : 84
1. All soils under slabs and around
external fountations to be treated for
D-01 termite control.
2ND FLOOR Detail 2. All soils on cut emberkments to be
6000 4250 stabilised. Slope not to exceed the
natural angle of repose.
4TH FLOOR 2Y16@250mmcc
2Y16@250mmcc 2Y16@250mmcc 3. All slabs at ground level to be
poured over 1000 gauge polythene
6Y20@250mmcc
250 sheeting on 50mm stone blinding
DESCRIPTION:
on hardcore.
3,100
6Y16@200mmcc
450
250 x 450mm thick beam
Y8 STIRRUPS well jointed and bedded in
6Y20@250mmcc sand mortar mix class 1:3 STRUCTURAL WORKS:
C1
and reinforced with 6 high 1. All black cotton soils to be removed
17x5 Y8@200mmcc Links 3,100 BEAM 2 steel reinforcement bars at
from all building plinths. All buildings
BEAM 2 200mmcc secured by Y8
BEAM SCHEDULE
3rd-4th floor 2. All basement columns to be provided
LENGTH: with angle iron protection 1500mm high.
6000 & 4250mm 3. All paved surfaces to be clear of black
NO : 56 cotton soil to a distance of 500mm outside
the edge of the surface.
4. Refer to structural Engineers details
3RD FLOOR for all r.c works.
5. Fountation depth to be determined on
6Y20@250mmcc site to structural Engineer's approval.
3,100
1550
MECHANICAL WORKS:
30x6 metal section flat core-rail.
550
Y8Linkups@200mmcc
1. All sanitry fittings, doors, windows
GROUND Y8Linkups@200mmcc
and lifts to schedules.
FLOOR COLUMN 1
COLUMN 2 2. All plumping and drainage to comply
DESCRIPTION: 100mm hardwood handrail with with city council's specifications.
DESCRIPTION: 300 x 550mm thick column 20mm thick masonary walling 30x6 metal section flat core-rail. 3. All service ducts to be accessible from
300 x 550mm thick column well jointed and bedded in every floor.
well jointed and bedded in sand mortar mix class 1:3
4. SVP denotes soil vent pipe to be
sand mortar mix class 1:3 175mm thick reinforced
1550
and reinforced with 6 Y16
and reinforced with 6 Y20 steel reinforcement bars at
1,100 provided at the head of drainage.
steel reinforcement bars at concrete stair slab
250mmcc secured by Y8
250mmcc secured by Y8
stirrups at 200mmcc.
steel metal balusters painted to
FIRE INSTALLATIONS
stirrups at 200mmcc. 150mm reinforced concrete slab approval. 1. Reserve at least 1200 liters of water
LEVEL :
LEVEL : 3RD - 4TH FLOOR to S.E details on floor above tank without automatic booster pump.
GROUND- 2ND FLOOR
HEIGHT: 3100 2. Emergency lighting system should
HEIGHT: 3100 NO : 24 be installed.
NO : 60 3. Install CO2 extinguishers together
SECTION XX SECTION YY with fire alarms in the kitchen.
COLUMN SCHEDULE
S-XX
1,100
B1-7Y20@200mmcc
15
Gauge 1000 polythene D.P.M 200
14 PROJECT TITTLE:
1,900
200
800
determined on site MASONRY BLOCK 15 x 187 = 2,800
WALL RC stair base
Masonry fondation walling
DRAWING TITTLE:
200
reinfored conrete
B2-16Y20@200mmcc
2
1
7
5
4
3
reinfored conrete strip mix class 20 1100
50mm thick mix class 20 50mm thick
murram binding 3,000 STRUCTURAL DETAILS
murram binding
600 600 RC STAIR WALL
STAIR PLAN
S-XX
RC FOUNDATION WALLING RC STAIR BASE
FOUNDATION WALLING SCALE: 1 : 100
Y16@150mmcc
DRAWN BY:
1,800
150
B1-Y16@150mmcc B2-Y16@150mmcc
B76/3596/2011
16Y32@200mmcc
RC SLAB DETAIL DETAIL 1
SUBMITTED :
300
16Y32@200mmcc
COLUMN BASE 6TH MAY, 2015