SIWA-PAS EDC realizes the The automation systems can be Apart from SIWA-PAS EDC, fur-
connection of PCS 7-controls to ordered pre-mass-produced and ther migration components for
SINAUT LSX. This component is tested - this simplifies the order SINAUT LSX are available, which
released in all LSX-configura- procedure, since the compilation enable an extension of plants to
tions from version 2.33/ 2.43. of individual modules can be left the state-of-art technology. Other
Here, PCS 7-technology can be out. parts of the migration strategy
employed parallel to the existing The object driven parameteriza- are:
automation- and remote action tion of the automation systems is
systems. The LSX-logging system carried out with the help of the • SIWA-PAS FEP
was extended with the paramete- fully-graphic project planning tool (Front-End-Processor):
rization of the S7-line. of SIMATIC PCS 7. This allows The PC-based MTU for the
planning with “Drag and Drop” connection of SINAUT RTUs.
and central loading and modifi- • SIWA-PAS OS:
EDC-Operation System cation of the automation systems The PC-based workstation with
via the plant bus. This generali- Windows NT as the operating
The EDC-operation system reali- zation leads to significant savings system and WinCC as visuali-
zes the event driven communi- during the project planning, modi- zation software.
cation of the automation systems fication and maintenance of the
to the control system. On the oc- software. If you have further questions
casion of a state alteration in the regarding the migration strategy,
process, the automation system please contact us.
creates a time stamp, which en-
ables an ontime processing in the
So far New
control system. This guarantees
an exact observation of the pro- SINAUT LSX SIWA-PAS OS
cess, since the values are listed in
curves and report windows in real
time. Calculation values and ar-
chives are being adjusted with the
help of the time stamp in case of
late transmission.
Through the saving of unneces-
sary telegrams, system resources FEP
are being spared and the perfor-
mance of the plant configuration
is increased.
Acknowledgements can either be EDC
implemented centrally via the
control system or decentrally.
Siemens AG
Industrial Solutions & Services
Water, I&S OCW W
Schuhstraße 60
91050 Erlangen
GERMANY
Tel.: +49 9131 73 20 87
Fax: +49 9131 8835 31301
E-Mail: water@erlm.siemens.de
Web: www.siemens.com/water