FORM

GBC RAIL HAULAGE PROJECT 012

Curve Examination
AREA CURVE NUMBER BC/BTC Ch. EC/ETC Ch.

TRACK NAME DATE TRACK STRUCTURE : SLAB / EMBEDDED / BALLASTED


LOCATION VERSINE (CHORD 20 m) CANT (MM) 1/4 VERSINE NOTE
POINT NUMBER

POINT NUMBER
Km Hm ACTUAL SHIFTING NEW
VERSINE

CURVE DIRECTION (L / R)

+ ← → –
CURVE DATA

R DESIGN : m

R NEW : m

VERSINE AVE : mm

CURVE L : m

TCL1 : m

TCL2 : m

IA : deg

CANT Ca : mm

WIDENING W : mm

V MAX : km/h

50000
 

50000
 

CHORD C and VERSINE m

2
 
2 8

CHECKED BY INSPECTED BY

Ver 1.0 Rev 26 January 2018 Page _____ of _____


NOTE NOTE