 layout,

drawing: v.jg.jg.jg.kh/lkhlkl/l/nlkn/lknlkhkjgjhfghdgfsgdfadsGDSHGF.JG/KJH
KJGJHDGFSGFHVNBKMM/N,M,MN,MNMBNVFZDFAFDFBN.,M/.,/.M.M,.N
M,BNVBCZCXBVM,N.,M.,M,NMNVBCVB
B,MB,VMNVBNCBVCVBCBVCNBCNNBNBCEffluent & drain sewers layouts
and manholes location. Civil drawings (plan and elevation) for the facilities within the
unit like instrumentation control room, electrical sub-station, and laboratory. Pipe
racks and technological structure foundation drawings. Civil drawings for platforms.
Tank settlement data. Soil Properties.
 Instrument drawing:
VVNBMN,.M/,NMBNVCXCZCSQAZWSDCRFGBYHJMIKL.PL,POKJHBRFCQA
ZEDFVBHJM,;/FGNM,./SDFBNM,./DFGHJM,JMGBDCTray width requirement on
pipe rack/sleepers.
Instrumentation hook-up drawing.
Instruments drawings for control valves, safety valves, inline instruments etc.
 Electrical layout:
QQQQQQQQQQQQQQQQQQQQQQQQQQRRRRRRRRRRRRRRRRRRRRRRG
GDSSSYHYYYYYYYYYYYYYYYYYYYYYYYYRDRRRRRRRRRRRRRRRRR
RRRRRRRRRUUUUUUUUUUUUUUUTray width requirement on pipe rack/pipe
sleepers and cable trenches width in units/off-site. Electrical cable tray layout.
 Mechanical (Static/Rotary/Package) layout:
Mechanical datasheets for equipment like columns, vessels, tanks etc. Layout drawing
of packages items showing auxiliary equipment.
 HVAC (Heating, Ventilation, and Air conditioning): Layouts showing the HVAC duct
size and the location.

Outputs from Piping discipline:

 Overall plot plan showing location of various units, tankfarms, offsite, package units,
non-plant buildings, roads, culverts, piperacks, sleepers, etc.
 PMS (Piping Material Specification)& VMS (Valve Material Specification).
 Equipment general arrangement drawing/layouts indicating the location of all the
equipment within the unit, platforms , ladders, overhead crane elevation, monorail
location, cutouts for piping.
 Piperack general arrangement drawing & structures for equipment support
 Piping general arrangement drawing/Layouts showing all the piping and equipment.
 Piping Bill of Materials (BOM) with technical evaluation and technical bid analysis
(TBA).
 Piping stress analysis report for the critical lines.
 Support loading for critical lines for structure design.
 Drawing showing the vessel cleats location for pipe supports and platform/ladder.
 Layout for underground services.
 Piping isometrics with bill of material.
 Support location plan, support schedule, pipe support drawings.
 Purchase specification for insulation, painting, wrapping and coating.
 Material handling study.