Scope of Steel Works (Distribution of responsibility)

Kashmir Underpass Project, Faisalabad.


Sr Sub-
Description of Works NLC Remarks
Contractor
Steel Works
Providing all tools, labor and machinery for Steel Cutting, √
1
Bending and Fabrication
2 Provision and use of steel binding wire √
3 Provision and use of Welding rods √
4 Steel ring binder √
Provision and use of electric/gas welding plant including √
5
welding leads, plugs and safety switches
6 Electricity/Generator sets for T&P √
Provision of goggles, gloves and other safety items for √
7
the workers.
8 Wooden sleepers for cage preparation √
Crane/Labor for Loading and unloading of steel at the
9
steel yard
Tractor/Trailer for shifting of steel cages and material at √
10
the work site
11 Cage withholding system. √
Crane for loading/unloading of steel cages at yard and √
12
work site.
13 Lighting at the site of fabrication and storage of material √
14 Welders for steel welding of Stiffener and hooks/overlaps √
15 Provision of steel rebars √
Material to be
16 Spacer blocks etc. √
provided by NLC
Site Preparation Works
√ Should not be
17 Mobilization quoted twice if the
√ line items are
18 Camping Space for staff at site already mentioned
in piling works

19 Accommodation for Labor and staff

a) Quoted rates have to be inclusive of Income Tax. Any other taxes and/or duties should be quoted
as a separate item.
b) It is the Subcontractor's responsibility to submit the check requests timely and get the work
approved from the consultant. .
c) Subcontractor is responsible for the safety and security of any stores/items issued by NLC. Any
loss/theft/damage claims will not be entertained.
d) The Subcontractor is required to meet the applicable standards of Health and Safety at the site.
e) The subcontractor is also responsible for the keeping the site tidy during the works and leaving it
clean after the works have been completed.