660MW

Overhaul
Inspect
HEV , HP
exhaust Check unit side MP drain Put the 5th
Rolling parameter: check valve for close pulverizer
8.4MPa(a)/375 ℃ valve for
closed.
Inspect Switch to main feedwater
turbine pipe
Establish water circulation when flushing qualified side HP Quit oil gun
and LP Put the 3th
drain for pulverizer
Boiler water circulating pump water charging
open.
GV controls Start low Stop boiler water Put the 4th
Unit large interlocking
spped at load warm- circulating pump pulverizer
test Cold-state flushing of boiler
up. Put LP
heater. Dry-wet state
Electric protection 260MW
Auxiliary Put turning gear Start electric pump feeding switching
interlocking test When
power 330MW
sytem separator
Heat engine protectiong When IV
Put jacking oil system Put gland seal system outlet
interlocking test control speed
190℃, 600r/min,
Contac Put dry submerged 220MW
perform perform
t DEH transmission test Generator hydrogen chain conveyor Put deaerator heating 100MW
hot-state pulverizer When TV
centra nsubstitutio inspection 2600r/min,IV control
flushing
lied Put auxiliary steam system maintain memory speed
Auxiliary machinery Put sealing oil Put auxiliary machinery oil
contro tank heating opening, TV-IV 2950r/min,
protection interlocking system switch TV to
switch TV-to IV control mode 30MW
l, test
Put lubricating oil ESP starts heating Put auxiliary boiler switched to TV GV mode
chenmi controlling
Valve and baffle system speed
Commisioning command transimission test
give whole startup
commands下达机组整套启 Boiler ignition Steam turbine rolling generator synchronzation

Generator insulation Boiler pressure


test Flush condenser Put air preheater Put oil gun of C,D layer pressurization put Start pulverizer C, D Report to scheduler, Quit flue gas Put the 2nd steam pump
bypass synchronize generator temperature probe
Start makeup
pump Put hydrogen dryer Put circulating Put ID fan Put preheater Close boiler steam Put synchronizing Close high and low Put unit superheat into automatic operation
water system continuous soot blow side drain device bypass
water chemistry
department Put flue gas temperature Put excitation system
Water Put circulating fan Put open water Put forced fan Start turbine side Put HP heater system Switch over auxiliary steam to 4th-stage extraction steam辅
Fire produce water probe
purification steam side drain
fighting
system station Put close cooler Put fire detector fan Put generator-transformer Switch over to auxiliary Shut off oil, put ESP
water unit protection power
supply
Put fuel circulation Switch electric to steam pump operation

Closed water Condensate Auxiliary


water tank boiler Put condensate Boiler purging Switch over auxiliary steam to HP exhaust
system put into
system flushing

Deaerator put 4th-stage extraction steam system


Air compressor Condensate
system put into water makeup
Start the 2nd pulverizer

Check HP drain for

supply to Supply to stator


gland seal cooling water
heater
Stator cooling
water flushing