Sunteți pe pagina 1din 2

Le 06/19/2019

DIMENSIONNEMENT OF PILECAP ON ONE PILE


Reference: Henry Thonier Tome 2+Projet 2011
The author
PROJECT: Bd1 is not responsible
PILECAP N°: PC01 for the use of
the program
Inputs
Load (in tonnes) Column dimension
G= 150 t a = 0.40 m
Q= 75 t b = 0.40 m

Concrete fck= 25 Mpa Pile Diameter Report


Steel fyk= 390 Mpa Diameter D = 0.50 m
Edge e = 0.15 m
Tolerance Construction: 0.075 m <0.10 m cover rebar = 0.05 m
*0.075m by default

Results: Bottom and Links


Dimensions of Pilecap Heigth of Pilecap Dia. lg t kg/m
A = 0.80 m H final= 0.60 m OK 7 HA16 1.70 1.578
B = 0.80 m Hmin= 0.60 m 7 HA16 1.70 1.578
5 HA14 3.08 1.208
Rebars of Pilecap Bottom bars cm Top bars
Asx (cm2) 14.07 Bottom bars 7 HA16 14.1 10.00 OK 7 HA16 1.70 1.578
Asy (cm2) 14.07 Bottom bars 7 HA16 14.1 10.00 OK 7 HA16 1.70 1.578

Aminx= 5.72 cm2 =0.13/100*B*d Quantity:


Aminy= 5.72 cm2 =0.13/100*A*d Concrete= 0.384
Horizontal bars cm Steel= 93.74
Links horizontal 13.81 cm2 =max(A's+As, 2.H) 5 HA14 15.39 10.00 OK Density= 244.1

Design:
Ned = 1.35*G+1.5*Q= 315 T Med= 23.63 t.m = Ned * tolerance Construction
A=B=D+2*e= 0.80 m (dimension pile cap) Asx=Asy= 14.07 cm2 = Med / (0.9*d*fyk / 115)
C=sqrt(pi D^2/4)= 0.44 m (dimension pile as a square)
H mini >= 0.75*B = 0.60 m (hight minimum) Ned/S= 16.04 Mpa Stress, where S is area of pile,
If stress > 5MPa, we need tie bars A's and As
d = H final - cover = 0.55 m (H final see table inputs below) F's= 26.25 t =0.25*Ned*[ 1 - min(a,b) / min(B,H) ] for top rebars
8.d.fyd = 14.9 T/cm2 * m A's= 7.74 cm2 for rebar for top part

Asx = Ned |C-a| / 8 d fyd = 0.91 cm2 IF(C<a,Top bars, Bottom bars) Fs= 20.59 t =0.25*Ned*[ 1 - C / min(B,H) ] for bottom rebars
Asy = Ned |C-b| / 8 d fyd = 0.91 cm2 IF(C<b,Top bars, Bottom bars) As= 6.07 cm2 for rebar for bottom part

Settlement Calculation (a signle pile) Ref: Foundation Engineering 8e (Braja M. Das)


Settlement: se= 46.3 mm (s1+s2+s3) total settlement of a signle pile must smaller than 50mm
s1= 1.1 mm (Qp+ξ.Qs)*L / (Ap.Ep)
Qp= 27.5 t (load carried at point under working condition)
Qs= 0 t (load carried at frictional resistance under working condition)
ξ= 0.62 between 0.5 to 0.67
D= 0.300 m (diameter of pile)
L= 6.00 m (length of pile)
Ap= 0.07069 m2 (section of pile)
Ep= 21000 Mpa (moduls elastic of pile material)
s2= 45.1 mm (Qp/Ap*D/Es (1-u^2)*Ip
Es= 20 Mpa (moduls elastic of Soil at or below point)
u= 0.3 (poisson's ratio of soil)
I= 0.85 0.85 influence factor
s3= 0 mm (Qs/pL).D/Es (1-u^2).Is
p= 0.94248 m perimeter of pile
Is= 3.56525 influence fator =2+0.35*sqrt(L/D)

Fichier 424750474.xls
Le 06/19/2019

Report

kg t
18.78
18.78
18.61

18.78
18.78

m3
kg
kg/m3

If stress > 5MPa, we need tie bars A's and As


t =0.25*Ned*[ 1 - min(a,b) / min(B,H) ] for top rebars

t =0.25*Ned*[ 1 - C / min(B,H) ] for bottom rebars

Fichier 424750474.xls