1600 KVA prime power diesel generator, including control panels Interfaces with
A fire alarm and BMS , 0.9 pf and 415 V. 1 No
C 1600 KVA Dry type step down transformer in compliance with QGEWC. 6 No
CONNECTION FEES
Kahramaa including MV switchgear as per kahrama permit, Ooredoo and All other
CC Authorities Connection Fees PS item
MV switchgear Panels
Medium Voltage (MV) switch gear panels, cabels, connection between MV panels
& from MV panels to transformers & from transformer to LV panels, complete
D system as per kahramaa requirements, drawings and specifications.
item
Low voltage panels - LVP -complete as per Kahramaa requirements, drawings and
specification. (Ref Section 21 Electrical Work ).
L 2500 A Busbar riser include all accessories from TX's to LV-Panels 200 m
R1 To Collection
A SMDB-E BUILDING 1 1 No
B SMDB-E BUILDING 2 1 No
C SMDB-GROUND 1 No
D DB-MV 1 No
E DB-LV 1 No
F DB-GL1 1 No
G DB-GL2 1 No
H DB-RLS1, DBRLS2 2 No
J DB-GP1, DB-GP2. 2 No
L DB-GYM 1 No
N Power factor correction capacitor with detuned harmonic filter (300 kVAR) 10 step.
6 No
P TYPICAL 630 Amp TPN+E, EXTERNAL busbar from LVPs to power factor
correction capacitors Item
R Allow for cable trays and trunking as necessary for the completion of electrical
installation. Item
To Collection
PVC/ECC Fire Rated Cables as specified; laid on cable trays / trunking or drawn in
ducts.
To Collection
EARTHING SYSTEM
A Allow for earthing of all steel work, pipe work, trunking, equipment, metal sheathing
and armoring of cables etc as specified and in accordance with KAHRAMAA
regulations. Item
B Supply , install and test Medium/Low voltage Earthing system Complete system to
achieve 5 ohm maximum including, earth pits, rods, electrods, earthing cables, test
links, earthing busbars for the MV/LV panel, Generator and all electrical panels .
Item
C Supply , install and test Low current earthing system to achieve 0.5 ohm as per
drawings and specifications including, earth pits, rods, electrods, earthing cables
from, test links, earthing busbars for low current systems/ equipments.
Item
LIGHTNING PROTECTION.
High conductivity copper conductors including all joints and fittings as specified.
D 3x25 mm PVC coated copper conductors; fixing to concrete or block work with all
required accessories. Item
Earth pits complete with 15 mm diameter extensible copper bond earth rod driven
to required depths as specified and shown on drawing
K Earth pit; Earth termination pit complete with Earth electrode, single Flange Earth
Seal, connection to conductors 'with clamps and other accessories as specified.
Item
M Extra; 70mm2 CU.,PVC copper cable passing through 50 dia. 'UPVC pipe up to
roof as specified including all accessories and fixings Item
To Collection
D 13A Switched fuse spur unit with flexable outlet and accessorise. 26 No
Wiring to the following with PVC insulated cable in concealed conduits as specified.
M 13A Switched fuse spur unit with flexable outlet and accessorise. 26 No
P 13 Amp switched double socket outlet with USB port weather proof. 9 No
LIGHTING INSTALLATION
LED Luminaries complete as specified including all led lamps, accessories, ceiling
roses and the like as necessary; fixing in position including final connections and
terminations of wiring. (Refer the lighting legend for detailed description)
S Type A3 18 No
T Type B1 6 No
U Type B3 15 No
V Type B4 68 No
W Type B5 42 No
X Type B5/E 10 No
Y Type C1 13 No
Z Type C3 13 No
AA Type C3/E 5 No
To Collection
AB Type A2 32 No
AE Type P4 129 No
AF Type P2 470 No
AG Type P5 33 No
AJ Type P1 32 No
AL EXIT LIGHT 55 No
Supply and install programmable light control panels for eatch space to control the
light on/off and to provide percentage on/off, it will connect to operation room
control unit work station for controlling all light control panel, including all active
components, internal components, wiring, contactors, actuators, controllers, power
supply, connection to DB, programmable motion sensor and programmable push
button, cables, wires, trunking, also include interface to Fire Alarm and BMS
system etc as descriped in the drawings, specifications and as QCS2014.
A Light Control Panel (indoor LCP, landscpe LCP, face light LCP, roof LCP) 10 No
E Work Station 1 No
Lighting switch
Supply and install lighting switches15A completes with all required equipwmnts as
per drawings, specification and QCS requirements.
Wiring to the following points with PVC insulated cable in concealed conduits as
specified.
J To Luminaries. Item
K To Lighting switches. 2 No
To Collection
Fire alarm addressable system equipment, fittings and accessories, interface with
all required equipwmnts as drawings and specification.
C Fire alarm control panel complete with battery, battery charger and all requirements
1 No
E Smoke detector. 65 No
F HEAT detector. 1 No
G CAMS device 1 No
J SPEAKER 12 No
M PC graphic analysis 1 No
N MIMIC Panel 1 No
P Fire telephone 15 No
Q EXIT LIGHTS 31 No
R EMERGENCY LIGHTING 45 No
W ELEVATOR STATUS/RECALL 1 No
Z To Smoke detector. 0 No
AA TO SPEAKER 12
R1 To Collection
AC To Heat detector 1 No
AD To CAMS device 1 No
AG To PC graphic analysis 1 No
AH To MIMIC panel 0 No
AJ To Fire telephone 15 No
AK Allow for interface with Lifts, fire pumps, PA Sound system, CCTV system, Exhaust
& fresh air, PR fans, MCC, DDC, Access Control, HVAC, BMS, FM200, ARESOL
system, Sliding door, Gate barrier, flow/tamper switch etc.as descriped in drawings,
specifications and as required by QCDD
Item
CO DETETION SYSTEM
AH Supply and install CO detection system completes with MCCs, DDCs, equipments,
fittings, cables, wires, trunking, and accessories, interface with all required
equipwmnts as per drawings, specification and QCDD requirements.(calculation &
drawngs to be provided for approval)
Item
F Controller Item
G Main rack including all equipment desciped in the drawing(amplifires, mixers, zone
selector, recivers, wireless microphone, decktop microphone, cd/mp3 player, am/fm
tuner). 3 No
H Allow for interface with fire alarm system, PABX system. Item
Wiring -fire rated cable- to the following as specified drawn in concealed PVC
conducting or in trunking/cable tray.
To Collection
N Wap hub 16 No
Supply and installation of a complete data and telephone system including all
active components, switches, tele boxes, cables, cable tray, trunking, conduits,
boxes,sockets, outlets and accessories as detailed on Drawings, Specification &
OOREDOO requirements.
R IDF 75 No
X IDF 75 No
Z Alllow for Connection to ooredoo room as per project & OOREDOO requirement.
Item
To Collection
CCTV System:
Supply, install, connect, test, commission and start up of IPCCTV system complete
including all active components, cameras, server, work station, NVR, UPS, MDF,
IDF, switches, multiplexer recorder, monitor, cable trunk, conduits, fittings,
Cat6A/Fiber cabling, intercases with BMS/FA/Access control systems, complete
with all necessary accessories and ancillary works as shown on drawings, technical
specifications and MOI regulations in order to provide a complete system .
G Work stations 10 No
H UPS Item
J MDF 2 No
K IDF 12 No
Allow for interface with BMS / FA / Access control systems etc.as descriped in
L drawings, specifications and as required by MOI Item
Allow for interface with Access control systems with the same software or different
M software giving full integration as one system
Q Visual display unit (VDU), complete with power cable, data cable, etc. Item
R Networkc ables to connect BASCPU to various DDC's around the building. Item
To Collection
Y
All other licenced software and hardware that might beneeded for the successful
operation of the entire BMS system and as defined in the specification
Item
Z Heavy duty alarm printer (Dotmatrix) as per specifications and complete with all
required cables and accessories for a successful operation Item
AB UPS system for the BAS station complete with all its accessories, cables, cables
trays, batteries, ..etc. Item
J Ditto as above but with enternal/external lighting control panels and server Item
K Ditto as above but with JET - smoke Exhaust - Fresh air fans. Item
N Ditto as above but with SEWAGE PIT & SUBMERSIBLE PUMPS Item
S Ditto as above but with service fresh & Exhaust Fans. Item
To Collection
B Multi switch 22 No
C Amplifier 10 No
E satellite dishes 8 No
F AM/FM antenna 2 No
G VHF/UHF antenna 2 No
H 2 DVD chanel 2 No
J TWIN LNB 8 No
K to TV outlet 10 No
L to Multi switch 22 No
M to Amplifier 10 No
Excavating trenches for cables or ducts not exceeding 1.5 m total depth including
grading bottoms, part backfilling with selected excavated material, compacting, and
removal of surplus excavated materials from site backfilling and warning tapes as
specified.
S Allow for cutting and forming, holes, mortises, chases and the like, providing
sleeves as necessary and making good finishings for the plumbing and engineering
installations. Item
T Allow for concrete plinths including waterproofing for electrical and Engineering
equipment and the like as necessary. Item
U Allow for paint finishing to exposed pipe work including supports as specified. Item
V Allow for PVC ducts / sleeves including concrete beds and surrounds for pipes
passing beneath structures, beds and the like Item
W Allow for Fire sealant for all penteration of MEPD services through fire rated wall or
floor slap as per specification and QCD requirements Item
To Collection
Collection
B.2/21/1
B.2/21/2
B.2/21/3
B.2/21/4
B.2/21/5
B.2/21/6
B.2/21/7
B.2/21/8
B.2/21/9
B.2/21/10
B.2/21/11
B.2/21/12
To Summary
TOTAL FOR ELECTRICAL WORKS
GS/1
Excluded
ollection QR 0.00
ollection QR 0.00
ollection QR 0.00
ollection QR 0.00
-
ollection QR 0.00
-
-
-
0.00
ollection QR
-
Ground Floor B.02/S.21/39 Project Ref.: Building A and Building B
NBK SQUARE II – COMMERICAL (4B + G + M + 10F) and BILL NO.2 SECTION: 21- ELECTRICAL WORKS
2 RESIDENTIAL (4B + G + 10F)
ollection QR 0.00
ollection QR 0.00
-
-
-
Excluded
ollection QR 0.00
ollection QR 0.00
ollection QR 0.00
-
-
-
ollection QR 0.00
QR. -
GENERAL NOTES
Quantities, include are for guidance, the contractor shall check and
•
verify all quantities.
Contactor shall take the responsibility to hand over all the installation
• to the local authorities whenever needed
To Collection QR
d. Ø50 70 m 62.00
e. Ø65 30 m 86.00
f. Ø80 50 m 105.00
g. Ø100 30 m 137.00
2.0 Valves
a. 4 No.
Ø65 wet landing valve stainless steel type with stainless steel cabient 3,550.00
To Collection QR
113.00
R1 To Collection QR
L.V ROOM:
Required Aerosol capacity: 73,725.60 gm
a. Aerosol generator units capacity: 15 Nos.5000gm 1 No. 94,644.00
ELECTRICAL ROOM:
Required Aerosol capacity: 3,797.36.60 gm
b. Aerosol generator units capacity: 15 Nos.5000gm 1 No. 94,644.00
M.V ROOM:
One FM 200 cylinder filled with 317.1 KG (699.0 LB) for room void.
a. 1 Set. 192,460.00
One FM 200 cylinder filled with 317.1 KG (699.0 LB) for trench void .
b. 1 Set. 192,460.00
R1 To Collection QR
DIVISION 10 - Specialties
R1 To Collection QR
Collection
B.2/23/1
B.2/23/2
B.2/23/3
B.2/23/4
B.2/23/5
To Summary
TOTAL FOR FIRE FIGHTING SYSTEMS GS/1
QR.
Amount (QR)
Amount (QR)
5,525.00
5,525.00
Amount (QR)
16,800.00
5,830.00
8,400.00
4,340.00
2,580.00
5,250.00
4,110.00
14,200.00
Amount (QR)
61,510.00
Amount (QR)
7,200.00
452.00
10,440.00
8,846.00
16,196.00
22,544.00
Amount (QR)
65,678.00
Amount (QR)
94,644.00
94,644.00
192,460.00
192,460.00
Amount (QR)
574,208.00
Amount (QR)
8,700.00
4,836.00
3,627.00
438.00
239.00
Included
Amount (QR)
17,840.00
Amount (QR)
5,525.00
61,510.00
65,678.00
574,208.00
17,840.00
Amount (QR)
724,761.00