The work breakdown structure is as follows:

WBS
TASK NAME
CODE
Contract Award 240d?
Project kick off meeting 1d?
Procurement 1d?
Pre- mob of Equipment and Personnel 5d
"Mobilization of equipment, labour and materials" 2d
Site Clearance 4d
"Erection of Temporary Facilities e.g Offices, WC, hoardings etc" 2d
ARCHIVE BUILDING 5d
Demolition work 53d?
Walls 11d?
Doors and Windows 2d
Finishes 1d?
Plumbing 1d?
Electrical 1d?
Roof 3d
Roof construction 5d
Roof Beam casting 15d
Roof carcassing 5d
Roof Covering 7d
Internal and External Walls 4d
Lintels 10d
Block walling 2d
Window and Burglary proofing 10d
Doors 2d
Fittings and Fixtures 1d
Entrance Canopy 10d
Steel archive file stores 3d
Wall Finishes 7d
Plastering/rendering/roughcast coatings 20d
Tiling 12d
Painting 7d
Floor Finishes 2d
Screeding 5d
Tiling 4d
Ceiling Finishes 5d
Suspended Ceiling 6d
Electrical Installation 6d
Distribution Board and Circuit Breakers 10d?
Cables and Conductors 2d
Conduits 3d
Power outlet and Lightings 1d?
Fittings and Accessories 4d
Earthing 3d
Mechanical Installation 2d
Sanitary appliances 7d
Accessories 7d
Piping work 2d
ADMINISTRATIVE BUILDING 4d
Demolition work 62d?
Walls 6d?
Doors and Windows 3d
Finishes 2d
Plumbing 1d?
Electrical 2d
Roof 1d?
Roof construction 2d
Roof Beam casting 16d
Roof carcassing 5d
Roof Covering 6d
Internal and External Walls 3d
Lintels 11d
Block walling 2d
Window and Burglary proofing 11d
Doors 2d
Fittings and Fixtures 2d
Entrance Canopy 5d
Wall Finishes 5d
Plastering/rendering/roughcast coatings 16d
Tiling 10d
Painting 6d
Floor Finishes 3d
Screeding 8d
Tiling 4d
Ceiling Finishes 4d
Suspended Ceiling 6d
Electrical Installation 6d
Distribution Board and Circuit Breakers 10d
Cables and Conductors 1d
Conduits 3d
Power outlet and Lightings 2d
Fittings and Accessories 3d
Earthing 2d
Mechanical Installation 1d
Sanitary appliances 7d
Accessories 7d
Piping work 3d
FIRST MILESTONE 3d
GATE HOUSE 0d
Substructure 36d?
Top soil / trench excavation 9d?
Filling / Disposal of excavated materials 1d
Hardcore filling 1d?
"Concrete work in Foundation, oversite bed, step, ramp and Generator" 1d?
DPM 2d
Block Walling 1d?
Roof construction 3d
Roof Beam casting 6d?
Roof carcassing 2d
Roof Covering 3d
Internal and External Walls 1d?
Lintels 3d
Block walling 1d
Window and Burglary proofing 3d
Doors 1d?
Wall Finishes 1d?
Plastering/rendering/roughcast coatings 7d
Tiling 3d
Painting 2d
Floor Finishes 2d
Screeding 2d?
Tiling 1d
Ceiling Finishes 1d?
PVC Ceiling 1d?
Electrical Installation 1d?
Distribution Board and Circuit Breakers 6d?
Cables and Conductors 2d
Conduits 1d?
Power outlet and Lightings 1d
Fittings and Accessories 2d
Earthing 1d
Mechanical Installation 1d?
Sanitary appliances 3d?
Accessories 3d
Piping work 1d?
ARCHIVE BUILDING FENCING WORK 2d
Removal of Existing Chain-link fence 29d
Trench excavation 3d
Filling and disposal of excavated materials 3d
Blinding and concrete footing 2d
Block walling 3d
Copping 5d
Plastering/rendering/roughcast coatings 2d
Painting / Clear finishing 6d
Security Wire 2d
FUTURE DEVELOPMENT FENCING WORK 3d
Removal of Existing Chain-link fence 34d?
Trenches excavation 5d
Filling and disposal of excavated materials 4d
Blinding and concrete footing 2d
Block walling 3d
Copings 5d
Plastering/rendering/roughcast coatings 2d
Painting / Clear finishing 7d
Security Wire 3d
Steel Gate 2d
SECOND MILESTONE 1d?
EXTERNAL WORKS 0d
Site clearance 69d?
Kerbs laying 1d?
Painting of kerbs 5d
Walkway Precast Concrete Paving Slabs 1d
Covered Walkway 13d
Horticultural and Landscaping 14d
Manure filling 35d
Surface grading and weeding 5d
Grass planting and maintenance 2d
Flower planting and maintenance 14d
External Electrical 14d
Pole installation and lighting fittings 15d
Walkway and security lights and fittings 3d
Distribution board and fuse switch 3d
NEPA connection 1d
"Cables, conduits, switches and socket outlets" 2d
Generator works 3d
Earthing and lightening Arrestor 1d
External Mechanical 2d
"Soak-away, septic tank, manholes and inspection chambers 3d
Rehabilitation" 3d
ROAD CONSTRUCTION 16d?
Survey work and test 1d
Site Clearance 1d
Kerbs 3d
Shape and Compact 1d?
Laterite filling 3d
Stone base filling 3d
Asphalt 1d
Box Culvert 3d
As built drawing 10d
THIRD MILESTONE 0d
Close-out 2d
Demobilization 4d