CLAVE CONCEPTO LOCALIZACION AREA DIAMETRO Kg/ml PZA CANTIDAD UNIDAD CROQUIS

EJE TRAMO TIPO LARGO ANCHO ALTURA


1.1 DESMONTE Y DESENRAICE 2.3 1.6 3.68 m2
1.2 DESPALME 3.68 0.15 0.552 m3
x 1.30
1.3 CARGA Y ACARREO volumen=0.552 abto 0.7176 m3
1.4 TRAZO Y NIVELACION 2.3 1.6 3.68 m2
2.1 EXCAVACION DE CEPAS 1 A-B Zapata 1.6 0.7 0.5 0.56 m3
2 A-B Zapata 1.6 0.7 0.5 0.56 m3
A 1_2 Zapata 2.3 0.7 0.5 0.805 m3
B 1_2 Zapata 2.3 0.7 0.5 0.805 m3
Total 2.73 m3
2.2 PLANTILLA 1 A-B Zapata 1.6 0.7 1.12 m2
2 A-B Zapata 1.6 0.7 1.12 m2
A 1_2 Zapata 2.3 0.7 1.61 m2
B 1_2 Zapata 2.3 0.7 1.61 m2
Total 5.46 m2
2.3 ACERO EN CIMENTACION 1 A-B N2 0.74 0.25 12 2.22 Kg
2 A-B N2 0.74 0.25 12 2.22 Kg
A 1_2 N2 0.74 0.25 16 2.96 Kg
B 1_2 N2 0.74 0.25 16 2.96 Kg
1 A-B N3 1.6 0.557 4 3.5648 Kg
2 A-B N3 1.6 0.557 4 3.5648 Kg
A 1_2 N3 2.3 0.557 4 5.1244 Kg
B 1_2 N3 2.3 0.557 4 5.1244 Kg
Total 27.7384 Kg
CLAVE CONCEPTO LOCALIZACION AREA DIAMETRO Kg/ml PZA CANTIDAD UNIDAD CROQUIS
EJE TRAMO TIPO LARGO ANCHO ALTURA
2.4 CIMBRA DE CIMENTACION 1 A-B Z int 1.45 0.25 1 0.3625 m2
Z ext 1.6 0.25 1 0.4 m2
2 A-B Z int 1.45 0.25 1 0.3625 m2
Z ext 1.6 0.25 1 0.4 m2
A 1_2 Z int 2.15 0.25 1 0.5375 m2
Z ext 2.3 0.25 1 0.575 m2
B 1_2 Z int 2.15 0.25 1 0.5375 m2
Z ext 2.3 0.25 1 0.575 m2
Total 3.75 m2
2.5 CONCRETO EN CIMENTACION 1 A-B Zapata 1.6 0.15 0.25 0.06 m3
2 A-B Zapata 1.6 0.15 0.25 0.06 m3
A 1_2 Zapata 2.3 0.15 0.25 0.08625 m3
B 1_2 Zapata 2.3 0.15 0.25 0.08625 m3
Total 0.2925 m3
2.6 MURO DE ENRASE 1 A-B Muro 1.6 0.3 0.48 m2
2 A-B Muro 1.6 0.3 0.48 m2
A 1_2 Muro 2.3 0.3 0.69 m2
B 1_2 Muro 2.3 0.3 0.69 m2
Total 2.34 m2
2.7 RELLENO COMPACTADO volumen de excavacion 2.73 m3
Plantilla 5.46 0.05 0.273 m3
volumen de zapata 0.2925 m3
muro de enrase 2.34 0.14 0.3276 m3
Total 1.8369 m3
Trans
3.1 ACERO EN LOSA A Nº3 1.8 0.557 12 12.0312 Kg
Long
Nº3 2.5 0.557 16 22.28 Kg
Total 34.3112 Kg
CLAVE CONCEPTO LOCALIZACION AREA DIAMETRO Kg/ml PZA CANTIDAD UNIDAD CROQUIS
EJE TRAMO TIPO LARGO ANCHO ALTURA
3.3 CONCRETO EN LOSA A 2.3 1.6 0.1 0.368 m3

4.1 CASTILLO 1 A-B K1 2.7 1 2.7 ml


2 A-B K1 2.7 2 5.4 ml
A 1_2 K1 2.7 1 2.7 ml
B 1_2 K1 2.7 2 5.4 ml
Total 16.2 ml
4.2 CADENA INTERMEDIA 2 A-B CI 1.6 1 1.6 ml
B 1_2 CI 2.3 1 2.3 ml
Total 3.9 ml
4.3 CADENA DE REMATE 1 A-B CR 1.6 1 1.6 ml
2 A-B CR 1.6 1 1.6 ml
A 1_2 CR 2.3 1 2.3 ml
B 1_2 CR 2.3 1 2.3 ml
Total 7.8 ml
4.4 MURO DE TABIQUE 1 A-B 1.6 2.7 4.32 m2
2 A-B 1.6 1.6 2.56 m2
A 1_2 2.3 2.7 6.21 m2
B 1_2 2.3 1.6 3.68 m2
Total 16.77 m2
4.5 FIRME DE CONCRETO A 2.3 1.6 3.68 m2
Total 3.68 m2
4.6 APLANADO FINO 1 A-B 1.6 2.7 2 8.64 m2
2 A-B 1.6 1.6 2 5.12 m2
A 1_2 2.3 2.7 2 12.42 m2
B 1_2 2.3 1.6 2 7.36 m2
Total 33.54 m2
4.7 COLOCACION DE LOZETA A 2.3 1.6 3.68 m2

4.8 SUMISTRO DE PINTURA 33.54 33.54 m2