1. GENERAL
1.1. Scope
This document presents the calculation of Neutral Pit 055-Z-101 located in PT. PERTAMINA (Persero)
Refinery Unit VI Balongan, Indonesia.

1.2. Codes, Standards, and References


All codes, standards, and References refer to :
 S-00-1310-001J “General Specification for Civil and Structural Design”.
 S-00-1311-003J “Soil Analytical Report For Soil Bearing Capacity”

1.3. Unit
All units are in METRIC unit

1.4. Specification of Material


 Steel Structure
Tensile strength (fy) = 2400 kg/cm2
 Concrete
Compressive strength (f’c) = 400 kg/cm2
 Reinforcing Steel Bar
Type = BjTD 40
Tensile Strength (fy) = 4000 kg/cm2

1.5. Unit Weight of Material


Steel = 7850 kg/m3
Concrete = 2400 kg/m3

1.6. Soil Data From Soil Bearing Capacity


Soil Stability = 5 ton/ m2
Uplift Factor = 1,2
REV
DOC. No.
JOB NO. .
0
0-0733-05-0000

2. DETAIL ANALYSIS
2.1. Structure Model

Fig. 1 Layout Neutral Pit

Pit Dimension  Slab Thickness : 0,4 m


 Length : 17,5 m  Slab Offsite From Wall : 2 m
 Wide : 12 m  Slab Length : 22,1 m
 Depth : 3,3 m  Slab Wide : 16,6 m
 Water Depth :3m  Concrete Density : 2,4 ton/m3
 Soil Water Depth : 2,3 m  Water Density : 1 ton/m3
 Wall Thickness : 0,3 m  Soil Density : 1,7 ton/m3

2.2. Loading Data


Wall Weight = ( 18,1 x 13,1 – 17,5 x 12,5) x 3,3 x 2,4 = 145,42 ton
Slab Weight = ( 22,1 x 17,1 x 0,4 x 2,4 = 362,79 ton
Full Water = (12 x 17,5 x 3 x 1 = 630 ton
Soil Weight = (22,1 x 17,1 – 18,1 x 13,1) x 3 x 1,7 = 718,08 ton
Soil Water Weight = (22,1 x 17,1 – 18,1 x 13,1 ) x 2,4 x 1 = 337,92 ton
REV
DOC. No.
JOB NO. .
0
0-0733-05-0000

2.3. Stability Check


1. Check Of Soil Compression
𝑊 145,41 + 362,79 + 630 + 718,08
= = 4,911 𝑡𝑜𝑛/𝑚 < 5,0 𝑡𝑜𝑛/𝑚 , 𝑂𝐾
𝐴 22,1 𝑥 17,1

2. Check Of Uplift
𝑊 145,41 + 362,79 + 718,08 + 337,92
= = 1,5 ≥ 1,2, 𝑂𝐾
𝑊 22,1 𝑥 17,1 𝑥 2,7 𝑥 1