Sunteți pe pagina 1din 1

Segment Specifications

Segment Name Notation Sketch (< Air Flow Direction) Length (Module) (For reference only) Optional

Damper located at front: L=5M Damper arrangement


Damper located at top or side: Flange
Air Inlet L=Dmp_L=5M~32M Manual damper
AI (Dmp_L is length module following air Motorized damper without actuator
Segment
flow direction at side or top damper, Motorized damper with On-Off actuator
determined by model and damper air Access door
flow rate) Moistureproof light
Damper arrangement
L=Dmp_L=5M~32M Fresh air ratio
(Dmp_L is max length module Flange
Mixing Box Manual damper
MB following air flow direction at side or
Segment top damper, will be determined by Motorized damper without actuator
model and damper air flow rate) Motorized damper with On-Off actuator
Access door
Moistureproof light
L=EA_Dmp_L +OA_Dmp_L=10M~36M Damper arrangement
(EA_Dmp_L is length module of Exhaust air ratio
exhaust air damper following air flow Flange
Economizer Manual damper
EE direction, OA_Dmp_L is length module
Segment of outdoor air damper following air Motorized damper without actuator
flow direction,and it is determined by Motorized damper with On-Off actuator
model and damper air flow rate) Access door
Moistureproof light

G1/G3/G4/F5 Plate filter


Open Return TiO2 Sterilizer
OF No occupy a separate segment
Filter Without filter (only offer plate filter frame)
Spare filter

G1/G3/G4/F5 Plate filter


Plate Filter Dual plate combination filter
PF L=2M
Segment Without filter (only offer plate filter frame)
Spare filter
Pressure difference gauge

G1/G3/G4/F5 Plate filter; G3/G4/F5/F6/F7/F8 Bag filter


L=4M 300mm Bag filter: 300/500mm Bag filter
Bag Filter L=5M Plate filter+300mm Bag filter: Single bag filter
BF Plate and bag combination filter
Segment L=6M 500mm Bag filter:
L=7M Plate filter+500mm Bag filter: Without filter (only offer bag filter frame)
Spare filter
Pressure difference gauge

F9/H10 Sub-HEPA filter


Sub-HEPA Without filter
HF L=4M
Segment Spare filter
Pressure difference gauge

1~4R Heating coil


L=3M 1R, 2R
Heating Coil Steel/copper header
HC L=4M 3R, 4R
Piping direction
Segment Note: L is 4M when TPC is 2 at 2R
1~2R copper tube with aluminium fin
heating coil
1~2R steel tube with aluminium fin

1~12R Cooling coil+1~4R Heating coil


L=5M~11M 1~12R Cooling coil+1~2R Steam coil
1. It is determined by coil row and Dual cooling coil
Cooling Coil combination mode Steel/copper header
CC
Segment 2. Evaporative humidifier, droplet Piping direction
eliminator installed in coil segment, Droplet eliminator
and no occupy a separate segment 50/100/150/200mm Evaporative humidifier (EV)
Humidifier brand

S-ar putea să vă placă și