Documente Academic
Documente Profesional
Documente Cultură
SAP Business One is an integrated enterprise resource planning (ERP) solution for small and
midsize businesses, as well as subsidiaries of large enterprises.
SAP Business One helps you manage every aspect of your company by providing you
with access to real-time business information through a single system. The application is
divided into a number of modules, which each cover a different business function.
SAP Business One is designed to be a flexible and extensible solution. The application is
available on premise or on demand, with standard interfaces to internal and external data
sources, mobile devices, and other analysis tools.
The Basic SAP Business one contains following menu…
Administration
Financials
Opportunities
Sales - A/R
Purchasing - A/P
Business Partners
Banking
Inventory
Resources
Production
MRP
Service
Human Resources
Reports
Budget Entry
Purchase Order
Material
Job Order
Issue
Job Order DC
WIP/Work Order
Gate Outward Completion
Optional
Gate Inward
SUB GRN
QC Inspection
Inventory
Stock
MERCHANDISE
A/R Invoice
PROCESS
Payments
Merchandise Add_On is mainly used for Planning requirements .Merchandise add_on
contains two modules.
1.Master
2.Transaction
Master Module
Master module is used to create and maintain the size, color, accessory details,
operation details, machine details and also creating Internal Order (IO) series...
Transaction Module
This module is used to planning the Order details, Fabric and Yarn details and
including with Budget...Let us see the flow one by one...
1.Order Entry
(Go to Menu → Merchandise → Transactions → Order Entry )
In this Order Entry screen you have to specify the necessary details as per buyer order
sheet.
Under the style entry screen , specify the required item code,order quantity,color and
size wise quantity.
Once you complete the details then give the ADD .After that you have to give the approval
for order entry screen.
Once you approved the Order Entry screen it will takes to next step else Particular IO number
is not showing for next process without the screen approval.
2.COMPONENT MASTER
(Go to Menu → Merchandise → Masters → Component Master)
3.FABRIC PROGRAM
4.BUDGET ENTRY
(Go to Menu → Merchandise → Transactions → Budget Entry )
You can load the Budget details based on IO number. Once you load the IO number
Customer and Quantity details are loaded automatically based on Order entry
Once you click 'Get Yarn Details' button then the Yarn details are loaded for particular IO
from Fabric Program
Now you have to define the operation process by clicking yellow arrow mark which is
in nearby Process
Sub Window will be open
Now you have to specify the details such as Operation, sequence,place ,rate and loss
percentage
You have to load the Input Item for first operation in the sequence
For Ex: Load Yarn Details for Knitting Operation
3.3.3 Color
You have to load color details and color break up for needed place..
Once you Gave all the details, then you have to rise work order for yarn to fabric
process by clicking 'Work Order Posting' button..
Work order Number will be generated for required fabric
Accessory master
Based On IO number and Style code you can create required Accessory for Production
quantity as well as Order Quantity
3.5 Accessory Requirement
If you want to process the Accessory ,you have to rise the work order for particular accessory
Now you have to specify the details such as Operation, sequence,place ,rate and loss
percentage
You have to load the Input Item for first operation in the sequence
For Ex: Load Fabric Details for Cutting Operation
You have to load Component details which is loaded from Component master Screen
Once you Gave all the details, then you have to rise work order for Fabric to Final
Garment process by clicking 'Work Order Posting' button in CMT Screen..
Work order Number will be generated for required FG item...
These are the planning method and process in Merchandise Add_On...Now we have to go to
iNexus add_on for Production process
You have to choose vendor code and vendor name from business partner master data
You have to select whether it is a credit or cash order including with department
You have to select the operation from required work order by clicking ' Item Details'
button which is given in bottom of the screen and click ok
You can change the Order Quantity if it is required
You have to specify rate, tax code, sac code, and account code
You can make job order for different vendor for a same operation and same IO
number
If you want gate inward entry, then you have to select Inward type as 'Against DC'
and enable the gate inward required selection box else inward type as 'Against JO' and
no need to enable gate inward required selection box
2. Job Order Dc
(Menu→Subcontracting/Service/JobWork→SubContracting→Job Order DC)
You have to choose vendor code and vendor name from business partner master data
If you want gate Outward entry, then you have to select type as 'Against DC' and
enable the gate outward required selection box else inward type as 'Against JO' and no
need to enable gate inward required selection box
You can make partial DC against Job Order quantity
2.1 Job Order Details
2.2 Job Order DC Input Items
You have to specify the WareHouse for Stock issue and have to give Bags/Rolls
You have to give serial batch details by clicking Serail/batch tracking button
Once You load the serial batch details ,the loaded serial batch details are shown in this
screen
3.Gate Outward Entry
If you make GRN against Gate entry then you have to choose Gate Entry/job order
tab as 'Against Gate Entry' else Against Job Order
You have to choose vendor Id and Gate pass number (i.e), gate inward number
4.1 Item Details
4.2 BOM Details
4.3 DC Details
4.4 Serial/Batch (Input Items)
Serial batch Output items are automatically loaded by system based on work order
information
5.Inward Inspection
(Menu→QualityManagement→Transactions→Inward Inspection)
These process are repeated until the work order operation is finish...These are the steps
involved in sub contracting process. Once you make GRN for final process in Work Order
the stock is posted into Inventory system
If FG/Fabric is In-House Process
A Work order defines which material is to be processed ,at which location, at what
time and how much work is required. It also defines which resources are to be used and how
the order costs are to be settled.
You may check all the information in work order is posted from the budget is right or wrong
This screen contains fabric details with color and component detail consumption
Have to check Serial batch criterion method ' Automatic' and Serial batch
consumption 'During production'
1.4 Size Color Details
This details are automatically loaded from budget based on order entry details
2.Material Issue
Material issue that means issue the materials from one warehouse to required warehouse for
production.
2.1 Summary
Overall fabric details are shown in this screen along with color and issued quantity
You can also load serial batch details in summary by choosing Issue method as
'Summary' in Material issue Header
2.2 Serial Batch Details
You have to give line no,contractor code and rate in table line details
In this screen shows consumption details for respective operation along with issued
qty,previous consumed qty and so on
3.3 Input Item Serial/batch details
If you give serial batch type as 'Issued against Work Order ',then the batches are loaded
automatically based on material issue
The data is fetched from table line master in operation details screen
3.5 Employee Details
The data is fetched from table line master in operation details screen .Employee details are
linked with Line master
These process are repeated until the work order operation is to be finished...These are the
steps involved in In House process...Once You make WIP for final process the stock is posted
into inventory by means of Goods Receipt