CO-ORDINATION COMMENTS

1. Provide 150 mm space around cable tray

2. Space between power cable tray and wet services is 150 mm

3. Don't run wet services parallely above the tray

4. Don't run the duct and pipe inside the electrical room , IT room ,server room, & battery
room or related electrical equipments.

5. There should be minimum of 300mm space between FCU and ceiling.

6. Acoustic liner for FCU is not required for electrical, battery, transformer, mechanical etc.
i.e. rooms where the other equipment noise level will be higher than FCU. IDF ROOM

7. Don't take sudden 90 degree turns main duct from FCU,AHU.

8. No false ceiling area must avoid duct and chilled water pipe routing

9. If available smoke extract duct must put SD OR MSFD (MSFD is client requirement basic)

10. For supply, VCD must be provided near main duct. VCD must be placed minimum 75mm
far from the shoe branch.

11. Fresh air louver and extract air louver must be located minimum 2000mm away.

12. If available smoke extract duct must put SD OR MSFD (MSFD is client requirement basic)

13. For extract, VCD must be provided near air terminals.