ZXG10 iBSC (V8.00.

00)
Installation and
Commissioning
Preparation Guide
ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

LEGAL INFORMATION

By accepting this certain document of ZTE CORPORATION you agree to the following terms. If you
do not agree to the following terms, please notice that you are not allowed to use this document.

Copyright © 2019 ZTE CORPORATION. Any rights not expressly granted herein are reserved. This
document contains proprietary information of ZTE CORPORATION. Any reproduction, transfer,
distribution, use or disclosure of this document or any portion of this document, in any form by any
means, without the prior written consent of ZTE CORPORATION is prohibited.

and are registered trademarks of ZTE CORPORATION. ZTE’s company name, logo
and product names referenced herein are either trademarks or registered trademarks of ZTE
CORPORATION. Other product and company names mentioned herein may be trademarks or trade
names of their respective owners. Without the prior written consent of ZTE CORPORATION or the
third party owner thereof, anyone’s access to this document should not be construed as granting,
by implication, estopped or otherwise, any license or right to use any marks appearing in the
document.

The design of this product complies with requirements of environmental protection and personal
security. This product shall be stored, used or discarded in accordance with product manual,
relevant contract or laws and regulations in relevant country (countries).

This document is provided “as is” and “as available”. Information contained in this document is
subject to continuous update without further notice due to improvement and update of ZTE
CORPORATION’s products and technologies.

ZTE CORPORATION

Address: NO. 55
Hi-tech Road South
ShenZhen
P.R.China
518057
Website: http://dms.zte.com.cn
Email: TSM.Aftersales@zte.com.cn

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. I


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

Revision History

Product Version Document Version Serial Number Reason for Revision


V1.0 R1.0 First published
Revised after being
V1.0 R1.1
modified by R&D

Author

Prepared
Date Document Version Reviewed by Approved by
by
2010-07-26 R1.0 Cai Kai Zhou Jun Chen Qi
2011-3-2 R1.1 Zhou Jun Chen Qi

Application
Applicable to GSM commissioning engineer
Applicable in GSM equipment commissioning phase

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. II


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

About This Document

Summary
Chapter Description
1 Preface
2 Installation Flow Introduces the installation flow
3 Environment Introduces the environment requirement
4 Auxiliary Equipment Preparation Introduces the requirement for auxiliary equipment
5 Personnel Arrangement Introduces the requirement for personnel
AppA Self-Check Table of Contains the Self-Check Table of Preparation for Engineering
Preparation for Engineering Installation and Engineering Preparation Feedback Form
Installation
AppB Physical Parameters for Contains the table for Physical Parameters for ZXG10 iBSC
ZXG10 iBSC (V8.00.00) (V8.00.00)

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. III
ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

TABLE OF CONTENTS

1 Preface..............................................................................................................1

2 Installation Flow...............................................................................................2

3 Environment.....................................................................................................2
3.1 Equipment Room Environment..........................................................................2
3.1.1 Equipment Room Construction..........................................................................3
3.1.2 Equipment Room Layout....................................................................................4
3.1.3 Lightning-Protection Design...............................................................................4
3.1.4 Requirements for Equipment Room Environment..............................................5
3.1.5 Grounding Inspection.......................................................................................10
3.1.6 Emergency Illumination System.......................................................................10
3.1.7 Power System..................................................................................................10
3.1.8 Transmission....................................................................................................11
3.1.9 IP Address Planning and Preparation...............................................................11
3.1.10 Transportation Path to Equipment Room.........................................................12
3.1.11 Equipment Temporary Storage.........................................................................12
3.2 Other Preparations...........................................................................................12
3.2.1 Personnel Preparation.....................................................................................12
3.2.2 Access Pass Preparation.................................................................................12
3.2.3 Vehicle Preparation..........................................................................................12

4 Auxiliary Equipment Preparation..................................................................13


4.1 Auxiliary Equipment Preparation......................................................................13

5 Personnel Arrangement................................................................................13
5.1 Training Personnel...........................................................................................14

AppA Self-Check Table of Preparation for Engineering Installation....................15

AppB Physical Parameters for ZXG10 iBSC (V8.00.00).........................................18


B.1 Physical Parameters........................................................................................18
B.2 System Index...................................................................................................18
B.2.1 Physical Performance......................................................................................18

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. IV


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

FIGURES

Figure 3-1 Layout of Equipment Room...................................................................................4

TABLES

Table 3-1 Temperature and Humidity......................................................................................7

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. V


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

1 Preface
Dear users, thank you for using ZXG10 iBSC (V8.00.00) base station controller. To
further improve our cooperation and put the equipment into operation in time, ZTE has
compiled this guide to help user to complete the preparations before the engineering
installation. We hope user can make the preparations as required in this guide before
ZTE technicians arrive at commissioning site so that the equipment can be smoothly
commissioned and cut over into operation quickly during engineering implementation, so
as to create good social and economical benefit.

Before making preparations for engineering installation, user need make clear the
following matters:

1. If user has met any problem during the preparation for engineering installation, user
can contact ZTE regional office to obtain support at any time. ZTE has the
obligation to provide the corresponding help.

2. After completing all preparation work for engineering installation, please contact the
local regional office of ZTE (in the local province or region) in time so that ZTE can
assign corresponding engineering technicians to implement the engineering
installation.

3. If specific engineering installation has been implemented when project preparations


have not been completed for some reasons, user will be responsible for the
unfinished preparations specified in Installation Preparations Guide.

4. If specific engineering installation has been implemented when project preparations


have not been completed due to some reason, and if the project cannot be carried
on due to incomplete preparation, ZTE engineers have the right to stop the
installation for further negotiation and better arrangements before going back to the
project.

To make it convenient for user to contact ZTE, please confirm the following contents:

Address of ZTE local office (for maintenance) ___________________

Telephone (fax) No. of ZTE local office (for maintenance) ______

Person in charge (PIC) of ZTE local office (for maintenance) _____________

ZTE person in charge (PIC) for this project________________________

Telephone No. of ZTE person in charge (PIC) for this project_________________

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 1


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

2 Installation Flow
The installation flow of ZTE shall be implemented since the conclusion of the contract and it will not
be changed to the maintenance flow until it passes the final acceptance. The main process of the
installation is as follows:
Contract intention,
contract starts

ZTE dispatches persons for engineering survey

Detailing and concluding


the contract
The customer starts engineering
The customer has made preparations in accordance with the
the prepayment Engineering Preparation Guide

ZTE organizes
production and delivery ZTE makes inspection and provides guidance to the
engineering preparations on an irregular basis, and
completes the Engineering Preparation Completion Table
The goods
after this and requires for deployment
arrive on the site

Both ZTE and the customer jointly determine


the kickoff date and the responsible persons for both parties

At the installation site, ZTE and the


customer jointly install and debug the equipment

Upon completion of system installation and debugging, both parties organize the
preliminary system acceptance, and put the system under trial run after cutover

Final system acceptance


to end the installation

It shows that the smooth commissioning of a project requires close cooperation between
user and equipment supplier (ZTE).

3 Environment

3.1 Equipment Room Environment


In the equipment room to install iBSC (V8.00.00), check the following items before
installation: equipment room structure, indoor environment, power supply, grounding and
auxiliary equipment.

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 2


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

3.1.1 Equipment Room Construction

The equipment room includes switch room, control room (generally 20m 2), and auxiliary
room (the control room and the equipment room can be combined if conditions do not
permit). The following requirements should be met:

1. The construction for the equipment room and corridors is completed and internal
walls are completely dry.

2. The ground can support at least 450 kg/m2.

3. The net height of the equipment room is more than 3.20 m.

4. The main doors of the equipment room should be wide ( 1.8m) enough and high
( 2.2m) enough for the equipment. In addition, locks and keys should be provided
for equipment room.

5. Ventilation facilities work fine.

6. The ceiling, walls, doors, windows and floor in the equipment room are strong
enough. Measurement is taken to avoid dust. The roof should be in good condition
without leaking. Fire-proof materials must be used. The windows should be sealed.

7. The grooves should be damp-proof with smooth and regular margins and corners.
The cover boards should be seamless with the floor and the electric and power
cords should be well covered.

8. Equipment room color

Generally, patterned materials should not be used for the floor. The walls and roof
should use bright and light color. In addition, the paint should be lusterless or not
contain silicide.

9. Equipment room floor

Generally, antistatic and movable floor at the height of 300mm or 330mm is


recommended. The resistance value of each unit should be in accordance with
Technical Requirements for Raised Floor in Computer Rooms. The floor boards
should be tightly laid, and horizontal difference per square meter should be no
more than 2mm. If fixed floor is used, conductive floor should be used (the
resistance should be 1.0 × 107 Ω to 1.0 × 1010 Ω). The conductive or movable floor
must be grounded and can be connected to the grounding device with a current-
control resistor and a connection cable. The value of the current-control resistor
should be 1 MΩ.

10. The ground of the equipment room should be leveled horizontally and clean, and
the quantities, positions and sizes of the reserved hidden pipes, ground grooves
and holes should meet the technology design requirements.

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 3


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

11. The anti-earthquake feature of the equipment room should meet the following
standards:

The equipment room building should be one level higher on anti-earthquake


respect than the civil construction.

The equipment installation (especially in the equipment room with movable floor)
should take extra anti-earthquake measures on top of basic measures.

3.1.2 Equipment Room Layout

Cabinets may be arranged in one or more rows (when they are placed in the same room
together with iBSC or MSC racks), depending on the size of the room and the number of
racks.

The cabinet layout inside the equipment room should be easy to use. The following
requirements should be satisfied:

1. The space between two cabinet rows should not be less than 1m.

2. The front and back side of a cabinet should be at least 1m away from the wall.

3. The side of a cabinet should be at least 0.8 m away from the wall.

4. An aisle of at least 1.2m wide should be reserved in the equipment room, as shown
in Figure Environment-1 .

Figure Environment-1 Layout of Equipment Room

1.2m 0.8m

1.0m

3.1.3 Lightning-Protection Design


Lightning-protection and anti-electromagnetic measures should be taken in the
equipment room.

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 4


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

Caution:

The equipment room should be far enough from high-voltage power line, strong magnetic
field, strong electric sparks, or other factors that may have potential threat to the equipment
room.

In a building which is not high, the ground of the BSS equipment should be separate
from the electrical grounding or anti-lightening grounding, and should be away from
these devices as far as possible.

The buildings structures whose height are at the minimum 15m above the equipment
room, such as the chimney and antenna, should be designed according to the lightning-
protection requirements of civil buildings and structures.

In the design of lightning-protection, measures should be taken to guard against direct


lightning current. Protective measures should also be taken to prevent side lightning
when a high-rise building is used as the equipment room. In the areas where lightning
occurs frequently, side lightning occurs and preventive measures should be adopted
according to the actual situation. For example, you can connect the metal windows with
lightning-protection grounding system. Also, you can set metal lightning-protection straps
on outer wall at certain interval to avoid lightning.

The following lightning-protection measures should be taken for the main building of the
equipment room: Lightning-protection strips should be used for the part of the building
that is vulnerable to lightning strokes; the objects such as chimney and antenna should
be installed with overhead protection cable or lightning rod; the grounding device should
not be longer than 30 m, made of zinc-coated flat steel and multiple copper strands with
the sectional area not less than 40 mm x 4 mm or 95 mm2. For the telecommunication
building, the grounding resistance during the lightning should not be more than 10 .
The outdoor cables, metal pipes and other things should be well grounded outside.
Before the outdoor overhead lines are directly led into the building, a lightning arrester
should be installed at the entry point. For the chimney, antenna and other objects, a
lightning arrestor should be installed at the top. For the buildings and structures, it is
recommended to use the steel bars inside of the structure as the grounding wire.

3.1.4 Requirements for Equipment Room Environment


The following requirements for equipment room environment should be met:

1. The equipment room should be clean and free of dust, corrosive gases, waste
gases and chemical gases.

2. There should not be water pipes in the equipment room and the devices should not
be exposed to water.

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 5


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

3. There should not be any valves or emptying vents if there are heating devices in
the equipment room.

4. The air conditioning devices should be able to meet the temperature and humidity
requirement in the equipment room.

5. The devices should be protected from electrostatic harm and electromagnetic


interference.

3.1.4.1 Antistatic Requirements

The equipment should be well grounded. The antistatic floorboards or the leather floor
with semi-conductive materials should be used. Copper foils should be used for
grounding at certain points (copper foils are pasted between the cement ground and the
semi-conductive floor and connected with the grounding cable).

3.1.4.2 Dust-Proof Requirements

The equipment room should meet the following requirements:

1. The concentration of dust with the diameter greater than 5µm should be lower than
18,000 granules/cm3.

2. The dust particles should be non-conductive, non-magnetic and non-corrosive.

Recommended anti-dust measures for the equipment room:

3. Seal doors and windows. The outer window should have double-layered glasses
and be sealed, and doors should have dustproof sealing strips. The ideal situation
is a sealed equipment room with a skylight and air filter.

4. Keep the work clothes and slippers clean and change them frequently.

5. The operating equipment should be set in the outer room for convenience.

6. Keep indoor RH relatively high to reduce dust adherence caused by static


electricity.

7. The walls and ceiling of the equipment room must be painted or pasted with
wallpaper. Lusterless paint is recommended.

3.1.4.3 Temperature and Humidity Requirements

Table Environment-1 shows the requirements of temperature and humidity.

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 6


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

Table Environment-1 Temperature and Humidity

Temperature (oC) Relative Humidity (%)


Long-term Short-term
Item Long-term working Short-term working
working working
condition (Note 1) condition (Note 2)
condition condition
Scope 0C to 40C -5C to 45C 20% to 90% 5% to 95%
Note 1: Under normal working environment of the switch, the measurement values of temperature and humidity refer

to the value measured at 2 m above the floor and 0.4 m before the equipment (measurement is done when no

protective board is in the front or at the back of the rack).

Note 2: The short-term working condition means that the continuous operation period is no more than 48 hours for

each time, and no more than 15 days in a year.

Generally, air conditioners should be equipped.

1. Air conditioning humidity: 40% to 65%, 50% to 60% is recommended.

2. Air conditioning temperature: 18oC to 28oC. 20oC to 25oC is recommended.

3.1.4.4 Noise

The environment noise of the equipment room should keep lower than 70 dB.

3.1.4.5 Lighting

Direct sunlight should be avoided.

The light should be soft with average lighting level between 150 lux and 200 lux. In an
area where power-cut always happens, a light with direct current power supply should
be installed.

It is required that the storage battery room be equipped with an anti-explosion light. The
outer window should be pasted with paper or be painted to avoid direct sunlight.

The lighting conditions of the equipment room should meet the equipment maintenance
requirements, and three sets of lighting systems including normal lighting, spare lighting,
and emergency lighting should be prepared.

3.1.4.6 Atmospheric Pressure

Working: 1.08 x 105 Pa to 5.1 x 104 Pa (-500 mm to +500 mm)

Storage: 1.08105 to 1.2 x 104 Pa (-500 mm to +1500 mm)

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 7


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

3.1.4.7 Air Pollution

The equipment should not be exposed to corrosive air such as hydrogen sulfide, sulfur
dioxide, oxide containing ammonia, or smog such as oil solvents, smoke and dust. It is
prohibited to smoke in the equipment room or places where the equipment (including the
battery) is installed.

3.1.4.8 Air Conditioner

To meet the temperature and humidity requirements as mentioned above, air


conditioners are needed. There should be air conditioners with humidity adjustment
function in the large equipment room, while in small equipment rooms only ordinary
cabinet or window air conditioners are needed.

As the iBSC has built-in fans, it is unnecessary to install central air conditioning in the
equipment room. In fact, the equipment room with the central air conditioning still needs
to be equipped with independent air conditioners.

The following measures are recommended:

1. Two AC lines or an extra generator should be used to ensure power supply to the
air conditioners.

2. It is better to install three or at lease two air conditioners in the equipment room,
because the equipments cannot work properly or even break down once the only
air conditioner goes wrong especially in hot weather. If two air conditioners are
equipped, the situation gets better. However, it is better to have three, especially
when small-power air conditioners are used. For example, you can switch on one of
them at cool night or in spring or autumn, and switch on two if the temperature
rises. In the daytime of hot days, we can switch on all the three air conditioners.
The above method can save energy, reduce the continuous working hours of a
single air conditioner and improve reliability.

3.1.4.9 Cabling Requirements

The following requirements for cabling should be met:

1. Cables should be laid out in grooves, and such moisture-proof, rodent-proof and
fire-proof measures can be taken.

2. Cables should not be mixed with power cables in layout, so as to avoid


interferences.

3. The operator should provide grooves for cable distribution.

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 8


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

4. The cabling rack should be prepared as required by the design drawing, and the
installation position of the cabling rack upon upper cabling is generally 2.5m above
the ground.

3.1.4.10 Security Requirements

The following requirements for security should be met:

1. The equipment room should be equipped with proper fire protection facilities as
smoke sensors and temperature sensors, which should be in good condition.

2. The sockets with different voltages in the equipment room should be clearly
labeled.

3. It is strictly prohibited to store flammable or explosive articles in the equipment


room.

4. Cover the reserved holes in the floors.

Fire Protection Distance between Civil Buildings in Code for Fire Protection Design of
Buildings stipulates that: The telecommunication buildings should be at the highest
levels of fire protection. Fire resistance in design should be at the first level (high
buildings) and second level, and fire protection distance between them should not be
less than 6m. If fire resistance in design of adjacent buildings is at the third level and
fourth level, the distance between them should not be less than 7m.

3.1.4.11 Environment Conditions for Equipment Storage

iBSC is a valuable electronic device, so the environment for its storage must be water-
proof and shock-proof.

3.1.4.12 Communication Guarantee

Toll line should be offered in the equipment room, so that the customer can contact ZTE
in a quick and timely manner during the installation and maintenance.

3.1.4.13 Desks and Chairs

In the equipment room, workstations and printers can be placed on desks and chairs. A
desk and a chair must be available in equipment room. The table should be about 80cm
high, and the chair 40cm.

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 9


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

3.1.5 Grounding Inspection

The grounding cables in the equipment room should be wired separately in a radial
mode or a planar mode. Prevent any closed circuit formed through the concrete bar or
the rack.

The working grounding, protection grounding, and lightning-protection grounding of the


equipment should be separate with a grounding resistance of less than 1Ω.

The size of the grounding cable should be determined by the maximum current. Covered
copper line is recommended, and bare copper line is prohibited.

3.1.6 Emergency Illumination System

For the unit with frequent power off, an emergency light (DC) should be installed.

3.1.7 Power System

It is necessary to check the following items for the power supply in the equipment room.

1. Requirements of DC power supply

 The standard voltage of power supply for iBSC (V8.00.00) is -48V in the
equipment room, with an allowed range of -57V to -40V.

 iBSC racks are equipped with two power sources. The DC power supply
equipment should provide two power source terminals for each iBSC rack.

 The noise level indices of DC power voltages should meet the general
technical specifications regulated by the former Ministry of the Posts and
Telecommunications of P. R. China.

 The DC power supply should have an over-voltage/current protection and


indication system.

2. AC power supply requirements

 Three-phase power supply: 380V ± 10%, 50Hz ± 5%, waveform distortion <
5%.

 Single-phase power supply: 220V ± 10%, 50Hz ± 5%, waveform distortion <
5%.

 The backup generator should have the same voltage and frequency
requirements as the above with waveform distortion range from 5% to 10%.

3. Requirements of UPS

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 10


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

 Input voltage (V): 220V ± 10%

 Input frequency (Hz): 50Hz ± 5%

 Power factor: > 0.95

 Output voltage: 220V ± 3% to 220V ± 5%

 Output frequency (Hz): 50Hz to 60Hz

 Harmonic distortion: < 5%

 Output waveform: Sine wave

 Working mode: Online

 Dynamic response duration: < 2ms

4. Different sockets in the equipment room should be clearly marked to separate


power electricity from lighting electricity.

5. There should be audible/visible alarms for under current, under voltage and over
voltage conditions.

6. Pay attention when handling 220V or 380V AC power voltage (if any) in the
equipment room.

7. Double check the power polarities before installation.

Electric Shock:

Upon checking the power supplies, pay attention to the switch-on status of switches, and
beware of electric shock.

3.1.8 Transmission

Make sure the transmission (between equipment and from equipment to DDF) inside the
equipment room is ok.

3.1.9 IP Address Planning and Preparation

Item Content Remarks


iBSC Installation IP address of OMP:

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 11


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

Internal IP address of OMCR:


External IP address of OMCR:
Internal IP address of OMCB:
External IP address of OMCB:
RPU virtual address: _________
IPBB OMCB gateway address:___________
Server Installation Server IP address:

3.1.10 Transportation Path to Equipment Room

The main doors of the equipment room should be wide ( 1.8 m) enough and high ( 2.2
m) enough for the sake of equipment transportation. In addition, locks and keys of the
equipment room should be complete.

3.1.11 Equipment Temporary Storage


Before installation the iBSC equipment should be kept in a storage room in good
package. The storage room should be free from damage materials such as water,
vibration, fire, high temperature, corrosion, electromagnetic interference, etc. In short, it
must reach the environment requirement for equipment room.

3.2 Other Preparations

3.2.1 Personnel Preparation

The process of project implementation is also the process of onsite training. The
maintenance people should be there during the installation.

3.2.2 Access Pass Preparation

Enough passes for the installation engineers should be prepared by the operator during
installation to ensure engineering progress.

3.2.3 Vehicle Preparation

In some case, vehicle should be provided.

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 12


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

4 Auxiliary Equipment Preparation

4.1 Auxiliary Equipment Preparation


The following requirements should be met:

1. The proper DC power supplies are ready.

2. The optical cables are properly connected and the transmission is checked.

3. The maintenance console for the equipment is installed in a proper position in


accordance with room layout.

4. The equipment room (civil construction and decoration) and its environment should
meet the requirement.

5. -48V power cable should be laid out to the equipment.

6. The grounding cable should be laid out to the equipment.

7. Install DDF.

8. A person should be available to assist the installation engineer.

9. The safety and quality measurements on the implementation site should meet
relevant regulations.

10. The related networking devices, such as switch, router and HUB should be properly
installed.

5 Personnel Arrangement

Caution:

Non-professionals should not maintain or debug the interior of any equipment unless
instructed by professionals on site.

Replacing any parts or modifying the equipment might result in unexpected dangers.
Therefore, do not replace any parts or modify the equipment unless otherwise
authorized.

To ensure your safety, please contact ZTE Corporation if you have any problem.

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 13


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

5.1 Training Personnel


The process of project implementation is also the process of onsite training, so the
operator should dispatch the personnel who may be responsible for the future equipment
room maintenance for training in the implementation; meanwhile, the customer is
required to send some special persons for coordination for some reasons (such as
different customs).

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 14


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

AppA Self-Check Table of Preparation for


Engineering Installation

Self-Check Table of Preparation for Engineering Installation

SN Self-check Items Preparation


1 Minimum height from the beam: 3.2 m  Yes  No
2 Floorboard bearing load: > 450 K/m 2
 Yes  No
3 Wall paper pasted on the walls or flat paint not easy to pulverize  Yes  No
4 Available with an antistatic floor  Yes  No
Long-term working temperature range: 15 to 30ºC
5  Yes  No
Short-term working temperature range: 0 to 45ºC
Anti-electromagnetic interference; an electric field of not more than
6  Yes  No
300mV/m and a magnetic field of less than 11Gs
The dust whose diameter is more than 5μm should be less than or
7  Yes  No
equal to 3 × 104 granules/m3 in density.
The shock-proof measure should be one degree higher than the
8  Yes  No
local basic earthquake intensity.
Illumination: Direct sunshine should be avoided. The storage battery
9 room should be equipped with the anti-explosion lamp with an  Yes  No
appropriate light intensity of 150 to 200 Lux
Fire-protection measurements meet up to China Level 2 fire-
10  Yes  No
protection standard
DC voltage: Primary power supply and storage battery are in mutual
11  Yes  No
hot backup, with a working range of -41 V to - 57 V
Charging and Discharge voltage of storage battery, floating charge
12  Yes  No
voltage: 52.8 ± 0.5 V, discharge voltage: 43.2 V
The storage battery can switch between the charging/discharging
13  Yes  No
status automatically
14 Standby diesel generator  Yes  No
15 AC power voltage: 220 V ± 20 V  Yes  No
16 Available with the -48 V power cable under the rack  Yes  No
17 Power alarm for power-off or fault  Yes  No
The working ground, protection ground and lightning protection
18 ground of the equipment should be grounded separately, and the  Yes  No
grounding resistance is typically less than 1 Ω.
The grounding cables should be led to under the rack; general
19  Yes  No
checking of grounding
20 IP address planning and preparation  Yes  No
21 Equipment transportation path to the equipment room  Yes  No

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 15


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

SN Self-check Items Preparation


22 Personnel arrangement  Yes  No
23 Temperature and humidity requirements  Yes  No
24 Illumination requirements  Yes  No
25 Atmospheric pressure  Yes  No
26 Air quality  Yes  No
27 Safety requirements  Yes  No
28 Communication guarantee  Yes  No
29 Emergency illumination  Yes  No
30 Temporary storage of equipment  Yes  No
31 Commissioning of transmission equipment  Yes  No
32 Vehicles  Yes  No
33 Equipment room construction  Yes  No
34 Cabling requirements  Yes  No

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 16


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 17


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

AppB Physical Parameters for ZXG10 iBSC


(V8.00.00)

B.1 Physical Parameters


1. Dimension of iBSC (V8.00.00)

External Dimension of iBSC (V8.00.00): 2000 mm × 600 mm× 800 mm (H × W × D)

2. Power supply: -48VDC (-57V to -40V)

3. Weight

A single ZXG10 iBSC cabinet should be no more than 360 kg.

4. Ambient temperature: -15 ºC to + 30 ºC (Long term)

5. Relative humidity: 40% to 65% (Long term)

B.2 System Index

B.2.1 Physical Performance

B.2.1.1 Dimensions and Colors

1. Rack dimensions

The dimensions of a single rack of ZXG10 iBSC (V8.00.00): 2000 mm × 600 mm ×


800 mm (H × W × D).

2. Cabinet color

IBSC cabinet color: Dark blue

B.2.1.2 Equipment Weight and Bearing Requirement of Floor in the Equipment


Room

1. The maximum weight of a single cabinet reaches 350 kg (including a front door, a
back door and a side door).

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 18


ZXG10 iBSC (V8.00.00) Installation and Commissioning Preparation Guide Internal Use
Only▲

2. The equipment room floor is required to have the bearing capacity of 450 kg/m 2.

B.2.1.3 Power Supply

Power system range:

Supply voltage: -48 VDC

DC voltage fluctuation range: -40 V to -57 V

AC voltage fluctuation range: ±10%

B.2.1.4 Power Consumption

The power consumption for a single rack (within built-in PCU and TC): if E1 is used in all
the interfaces: 2558 W; if IP is used in all the interfaces: 2542 W (including 160 W for
SBCX).

The power consumption for dual racks (within built-in PCU and TC): if E1 is used in all
the interfaces: 6368 W; if IP is used in all the interfaces: 3808 W (including 160 W for
SBCX).

Note:

For more information about the equipment parameters, please refer to the ZXG10 iBSC
(V8.00.00) System Description.

ZTE Confidential Proprietary © 2019 ZTE CORPORATION. All rights reserved. 19