Sunteți pe pagina 1din 1

BUILDING A

Stay Informed:
»» Project Hotline: 844-ULT-INFO (858-4636)

BETTER I-4
»» Sign up for email and text alerts at fdot.tips/I4Alerts
»» Follow @i4Ultimate on Twitter
»» Subscribe to our monthly newsletter at fdot.tips/I4News

EB I-4 BETWEEN SOUTH ST. AND LEE RD. SHIFTING TO FINAL CONFIGURATION
Church St
South St

Temporary ramp system between Colonial Drive and Lee Road is

Amelia St

Colonial Dr
eliminated, returning ramps to pre-construction configuration. 7
St

E
Anderson

Blvd
Hughey Ave
W

Lee Rd
Minnesota Ave
W E

e
Ivanho

Princeton St
1
Garland Ave
2

Par St
6
Orange Ave
Hughey Ave

Fairbanks Ave
3
W E
Magnolia Ave

Rosalind Ave
Garland Ave 2A 2B Colonial Dr W E
Amelia St

Lee Rd
Orange Ave
Orange Ave 5 Wymore Rd

Blvd
hoe
7 EB I-4 exit ramp to Lee Rd. connects

Par St
For more information about
A New exit the
point for direct access to Amelia St. Ivan directly from the mainline.
eastbound 2
closures preceding
B I-4
Newshift, please
exit point visit access to Colonial Dr.
for direct
https://i4ultimate.com/EBI4 W W E
E
E
Hughey Ave
W
W E
W E
Orange Ave
Magnolia Ave
Garland Ave
5 EB I-4 exit ramp to Par St. connects

Princeton St
EB I-4 entrance ramp from directly from the mainline.

Fairbanks Ave
3 Ivanhoe Blvd. connects
South St
And

directly to the mainline.


erso

4
n St

EB I-4 entrance and exit ramps at Princeton


St. connect directly with the mainline. EB I-4 entrance and exit ramps at
1 EB I-4 shift begins just before 6 Fairbanks Ave. connect directly
with the mainline.
Anderson St.

As soon as 5 a.m. the morning of Monday, June 24, the final configuration of eastbound I-4 between South Street and Lee Road (State Road 423) will open to
motorists. The eastbound I-4 temporary ramp system between Colonial Drive (State Road 50) and Lee Road will be eliminated, returning ramps to pre-construction PROJECT INFO
configuration. Motorists should anticipate additional capacity on the temporary ramp system over the weekend in preparation for the shift. With this shift, eight The $2.3 billion I-4 Ultimate project is reconstructing 21 miles of interstate from west
contiguous miles of eastbound I-4 will be set in their permanent configuration, marking significant completion on this part of the I-4 Ultimate project. of Kirkman Road to east of State Road 434 in Longwood. For more information
Two new exit ramps to Amelia Street and Colonial Drive will also open the morning of June 24, and the U-Turn from the Colonial Drive exit ramp under I-4 to about I-4 Ultimate, contact David Parks, I-4 Ultimate Community Outreach
southbound Hughey Avenue will be temporarily unavailable. Specialist, at 844-ULT-INFO (844-858-4636) or DavidParks@i4Ultimate.com.

Roadway shift subject to change. Construction progress, roadway conditions and weather may require schedule adjustments. Please check i4ultimate.com/alertsmap for the most up-to-date information.

For more information about closures preceding the eastbound I-4 shift, please visit I4Ultimate.com/EBI4
3872-20190619 © Florida Department of Transportation i4Ultimate.com Last Updated 6/19/2019

S-ar putea să vă placă și