Documente Academic
Documente Profesional
Documente Cultură
PROCUREMENT ID
: 17LF-0021
/CONTRACT ID
DATE OF OPENING OF
: December 28, 2016 @ 2:15 p.m.________
BIDS
Duly initiated Contractor’s List of Key Personnel for the Contract (Form DPWH-INFR-14)
Not related to HOPE, BAC, TWG, Secretariat, EMO/IU, within 3rd civil degree
Duly signed Bid Prices in the Bill of Quantities (Forms DPWH-INFR-17 and 18)
-------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-20-2016 Page 1 of 1
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID 17LF0021
Contract Name: Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
5 In applying in the major and similar Categories or Work given in Annex A of DO 139, series of 2016, the
following types of infrastructure are considered similar to the basic types of each other.
Road Highway, tollway, expressway, airport, runway, taxiway
Bridge Flyover, viaduct, elevated railway, interchange, piers at ports
Flood Control Dams, levee, pumping station, seawall, River Control, Revetment
Building School, Hospital, Housing, commercial building, industrial building, warehouse
Contract Name: Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
The venue of the Pre-Bid Conference is at DPWH Conference Room, First District
Eng’g. Office, Lucod, Baganga, Davao Oriental
Office Address: DPWH, First District Eng’g. Office, Lucod, Baganga, Davao Oriental
Contact Person: Dominga E. Vistal, Engineer III
BAC Vice-Chairman
Contact No. : 0948-546-9280
14.2a(3)(b) The minimum work experience requirements for the key personnel are the following
Total Same Position in
No. of
Position Experience Similar Works
Personnel
(Years) (Years)
Project Manager 1 5 3
Project Engineer 1 5 3
Accredited Materials & 1 - -
Quality Control Engineer
Foreman 1 5 2
1. The experience means total years of civil works experience (of any nature in
construction and engineering consultancy services)
2. Except for Materials & Quality Control Engineer, “Same Position in Similar Works”,
covers overall work experience for the designated position in similar bridge and road
construction
3. For Materials & Quality Control Engineer, “Same Position in Similar Works”, covers
overall work experience for the designated position in any engineering work.
Contract Name: Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
If WB, State: “Subject to prior concurrence by the World Bank, for foreign-funded
procurement, a ceiling may be applied to bid prices provided the condition in ITB 13.4b
are met.
17.1 Bids shall be valid Until One Hundred Twenty (120) calendar days from the date set for
the Bid Opening Bids.
18.2 Bid security shall be valid One Hundred Twenty (120) days from the date set for the
Opening of Bids.
20.4 The Bidders shall Submit one (1) original copy of the first and the second components of
its bid and shall be typed or written in indelible ink and shall be signed by the bidder or its
duly authorized representative/s.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID 17LF0021
Contract Name: Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
Equipment Used
Contract Name: Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
21.4 d
The Specific identification of this bidding process Completion of Multi-Purpose Building (
Covered Court, Stage with Bleacher) San Miguel. Cateel, Davao Oriental
22 The address for receipt of bids is: BAC Chairman, DPWH, First District Eng’g. Office,
Lucod, Baganga, Davao Oriental
The deadline for receipt of Bids is on December 28, 2016 until 10:00 A.M.
26.1 The place of bid opening is DPWH Conference Room, First District Eng’g. Office,
Lucod, Baganga, Davao Oriental .
The date and time of bid opening is on December 28, 2016 at 2:15 P.M.
Electronic Bidding will not be adopted for Bids Opening and Preliminary Examination in
28 this procurement.
Contract Name: Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
GCC
Clause
1.19 The Intended Completion Date is SIXTY (60) calendar days from the Effective
Date of the Contract.
Contract duration is breakdown as follows:
Working Days ---- 44 calendar days
Predetermined ---- 16 calendar days
Unworkable Days ---- Calendar days
1.24 The Procuring Entity is DPWH FIRST DISTRICT ENG’G. OFFICE, LUCOD, BAGANGA, DAVAO
ORIENTAL .
1.26 The Site is located at Cateel, Davao Oriental and is defined in drawings No. (Insert
number).
1.30 The Start Date is the Effectivity Date as stated in the Notice to Proceed.
1.33
The Works consist of:
Construction of Bleacher (3.00mx33.60m) & Construction of Stage
(6.00mx6.00m)
5.1 The Procuring Entity shall give possession of all parts of the Site to the Contractor upon
issuance of Notice to Proceed.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID 17LF0021
Contract Name: Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
GCC
Clause
6.5 The Contractor shall employ the following Key Personnel:
1. Project Manager
2. Project Engineer
3. Accredited Materials & Quality Control Engineer
4. Foreman
5. Safety Officer
7.4 c No further instructions.
8.1 Unless otherwise indicated in the SCC, the Contractor cannot subcontract Works more
than the percentage specified in ITB Clause 8.1
8.3 The subcontractor must have a PCAB license and registered in the DPWH Civil Works
Registry. The subcontractor must be eligible for the portion of works it will undertake, and
shall submit documents required under Section 23.1 (Eligibility Requirements for the
Procurement of Goods and Infrastructure Projects) of the Rev. IRR of RA 9184.
10 None
(Insert address)
29.1 No day works are applicable to the contract.
31.1 The Contractor shall submit the Program of Work to the Procuring Entity’s Representative
within ten (10) days of delivery of the Letter of Acceptance.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID 17LF0021
Contract Name: Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
GCC
Clause
The period between Program of Works updates is (Insert Number) days.
31.3 The Amount to be withheld for late submission of an updated program of Work is (insert
amount)
39.1
The amount and schedule of the advance payment is fifteen percent (15%) of the Contract
Price, to make in Lumpsum or, at the most, two (2) installments.
40.2
Materials and equipment delivered on the site but not completely put in place shall be
included for payment
50.1
The Date by which the As-Built Drawings and/or Operating and Maintenance Manuals are
required is (Insert date)
50.2
The amount to be withheld for failing to supply the As-Built Drawing and/or Operating and
Maintenance Manuals by the date required is (Insert amount in Pesos equal to 10% of the
Contract Price)
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID 17LF0021
Contract Name: Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
a. DPWH Standards
The Procuring Entity Shall use the Standard Pay Items in the Project and
Contract Management Application (PCMA) in drawing up the Specifications.
Contract Name: Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
Contract Name: Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
BID FORM
Date: _______________
(b) We offer to execute the Works for this Contract in accordance with the said BDs, including the Bid Data Sheet,
General and Special Conditions of Contract, Specification and Drawings therein;
(c) We present our Bid to execute the Works, consisting of our Technical Proposal (Annex “A”) and our Financial
Proposal (Annex “B”);
1) Bid Security in the required form, amount and validity period, using Form DPWH-INFR-10, 11 or 12,
as applicable (Annex “A-1”)
2) Organizational Chart for the Contract, Using Form DPWH-INFR-13 (Annex “A3”)
3) Contractor’s Certification on Key Personnel for the Contract, using Form
DPWH-INFR-15 (Annex “A-5”)
4) List of Contractor’s Major Equipment Pledge for the Contract, using Form
DPWH-INFR-15 (Annex “A-5”)
5) Omnibus Sworn Statement required under RA 9184-IRR Sec. 25.2b)iv), using Form DPWH-INFR-16
(Annex ”A-6”)
(f) The Total price of our Bid for this Contract based on the unit prices in the said Bill of Quantities, excluding any
discounts offered in item (g) below, is: total Bid price in words and in figures;
(g) The discounts we offer and the methodology for their application for this contract are;
----------------------------------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-09-2016 Page 1 of 2
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID 17LF0021
Contract Name: Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
(h) Our Bid shall be valid for a period of ______________________________days after the date fixed for the
opening of bids in accordance with the Bidding Documents, and it shall remain binding upon us and may be
accepted by you at any time before the experiment of that period.
(i) If our Bid is accepted and we receive from you a Notice of Award, we commit, within ten (10) calendar days
after our receipt of the said notice, (1) to submit to you the required Performance Security and other
documents prescribed in the Bidding Documents, and (2) to sign the contract Agreement;
(j) We understand that, if the contract is awarded to us, this Bid, together with your written acceptance thereof
through your Notice of Award, shall constitute a binding contract between us, until formal Contract Agreement
is prepared and executed;
(k) We understand that you are not bound to accept the Lowest Calculated Bid or Any other Bid that you may
receive; and
(l) We acknowledge that failure to sign each page of this Form of Bid and the accomplishment Bill of Quantities
Shall be a ground for the rejection of our Bid.
Name:
Signed:
Date: ____________________
---------------------------------------------------------------------------------------------------------------
DPWH-INFR-09-2016 Page 2 of 2
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID 17LF0021
Contract Name:
Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
Contract Location:
San Miguel, Cateel, Davao Oriental
--------------------------------------------------------------------------
-------
BILL OF QUANTITIES
Part No. : __________________
BLEACHERS
PART A. EARTHWORK
In words _____________________ In words: _________________________
803(1) Structure Excavation Cu.m. 54.00 ______________________________ __________________________________
In figures: _____________________ In Figures:
__________________________
In words: _________________________
SUB-TOTAL FOR THIS PAGE _________________________________
In Figures: _________________________
Submitted by:
Date:
Name of the Representative of the Bidder
Position
----------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 1 of 7
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH)
Contract ID 17LF0021
Contract Name:
Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
Contract Location:
San Miguel, Cateel, Davao Oriental
--------------------------------------------------------------------------
-------
BILL OF QUANTITIES
Part No. : __________________
PART C. FINISHNG
In words _____________________ In words: _________________________
1047(2) Structural Metal Kgs. 2,999.12
In words: _________________________
SUB-TOTAL FOR THIS PAGE
In Figures: _________________________
Submitted by:
Date:
Name of the Representative of the Bidder
Position
Name of Bidders
----------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 2 of 7
Contract ID 17LF0021
Contract Name:
Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
Contract Location:
San Miguel, Cateel, Davao Oriental
--------------------------------------------------------------------------
-------
BILL OF QUANTITIES
Part No. : __________________
STAGE
A. EARTHWORK
In Figures: _________________________
Submitted by:
Date:
Name of the Representative of the Bidder
Position
Name of Bidders
----------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 3 of 7
Contract ID 17LF0021
Contract Name:
Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
Contract Location:
San Miguel, Cateel, Davao Oriental
--------------------------------------------------------------------------
-------
BILL OF QUANTITIES
Part No. : __________________
In Figures: _________________________
Submitted by:
Date:
Name of the Representative of the Bidder
Position
Name of Bidders
----------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 4 of 7
Contract ID 17LF0021
Contract Name:
Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
Contract Location:
San Miguel, Cateel, Davao Oriental
--------------------------------------------------------------------------
-------
BILL OF QUANTITIES
Part No.
PART C. FINISHING
In words _____________________ In words: _________________________
1046(2)a CHB Non-Load Sq.m. 77.04
Bearing (Including,
Reinforcing Steel)
In figures: _____________________ In Figures:
__________________________
In words: _________________________
SUB-TOTAL FOR THIS PAGE
In Figures: _________________________
Submitted by:
Date:
Name of the Representative of the Bidder
Position
Name of Bidders
----------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 5 of 7
Contract ID 17LF0021
Contract Name:
Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
Contract Location:
San Miguel, Cateel, Davao Oriental
--------------------------------------------------------------------------
-------
BILL OF QUANTITIES
Part No.
PART D. ELECTRICAL
In words _____________________ In words: _________________________
1100 Conduits, Boxes and l.m. 63.00
Fittings
In figures: _____________________ In Figures:
__________________________
In words: _________________________
SUB-TOTAL FOR THIS PAGE
In Figures: _________________________
Submitted by:
Date:
Name of the Representative of the Bidder
Position
Name of Bidders
----------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 6 of 7
Contract ID 17LF0021
Contract Name:
Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
Contract Location:
San Miguel, Cateel, Davao Oriental
--------------------------------------------------------------------------
-------
BILL OF QUANTITIES
Part No.
In words: _________________________
In words: _________________________
GRAND TOTAL FOR THIS
PROJECT
In Figures: _________________________
Submitted by:
Date:
Name of the Representative of the Bidder
Position
Name of Bidders
----------------------------------------------------------------------------------------------------
DPWH-INFR-17-2016 Page 7 of 7
Contract Name: Completion of Multi-Purpose Building ( Covered Court, Stage with Bleacher)
--------------------------------------------------------------------------
-------
SUMMARY OF BID PRICES
(All Parts of Bill of Quantities)
1. Part No. – Enter the “Part No.” for each section of the Bill of Quantities (BOQ) where unit prices are
entered.
2. Part Description – Enter the “Part Description” corresponding to the “Part No.”
3. Total Amount – Enter the “Total Amount” in Pesos for all pages having the same “Part Description”
Contract ID:
P
P
----------------------------------------------------------------------------------------------------------------------------------------------------------------------
DPWH-INFR-18-2016 Page 1 of 1