Documente Academic
Documente Profesional
Documente Cultură
METHODOLOGY
TABLE OF CONTENTS
1. Purpose
2. Scope of Work
3. Abbreviation
4. Reference Documents
5. Standards
8. Construction Methodology
11. Appendix
ss
1. PURPOSE:
This plan is prepared for the requirements of method statement for Construction of Temporary Site
Facilities (TSF) including utilities from mobilization to completion and support facilities at MDHP
project. This methodology is based on the information provided in the RFQ by Descon Engineering
Limited through email dated 02-05-2019.
MDHP project is located in Province KPK, The project is executed to deal with the waste water of……………..
Temporary works contains the following items.
Water services and distribution
Temporary electric power and light
Field office and storage shed
Temporary enclosures
Waste disposal services
Construction aids and miscellaneous services and facilities.
Barricades, warning sign, lights
Environmental protection
Health and safety regulations
Police, Fire Department and Rescue Squad rules
Environmental protections regulations
Site layout of the sewage & sewage treatment plant location shall be as the following drawings:
3. ABBREVIATIONS
3.1. WAPDA : Water and Power Development Authority
3.2. DEL : Descon Engineering Limited
3.3. PAS : Petrocon – Al-Hadeed – 7Star (Joint Venture)
3.4. MI : Magazine In-charge
4. REFERENCE DOCUMENTS:
4.1. Standards
4.1.1. Technical Proposal
4.1.2. Project layout
4.1.3. Code for construction and acceptance of….
5. STANDARDS
5.1. As per Clause 3.1.3 of Specifications shared by DEL vide RFQ dated 25.04.2019
Site Manager Reports to the Construction Manager will be in-charge of the construction of temporary works.
He will coordinate all concerned parties and ensure site works are completing in time and with proper
quality.
Site Engineer reports to the Site Manager will be in charge of the construction quality.
In order to contact with them on site instantly, the detailed information about them will be provided as
follows.
Site Safety Officer, who create and maintain safe working conditions in all operations. Assist Site Engineers to
organize the work area so that workers can perform their duties with maximum efficiency.
Before start working inspect equipment and tools, Record of all injures and damages on site and submit
reports as requires.
The program of construction shall be temporary site office and facilities works.
The schedule of construction is as follows.
Description Start Time Finish Time
7.3. Manpower
The estimated manpower is tabulated as follows, which will be subject to revision on actual requirements
during implementation.
Description Number Required Remarks
8. METHODOLOGY OF WORKS
8.1. Process flow
ss
Permit &
Plans Survey Excavation Foundtions
Insurance
Land-
Punchlist Finishing
Scaping
We will record the existing elevation levels prior to commencement of the construction and we will search for
existing services in the area.
Before the works started locate the area where temporary worked is implemented shall be surveyed and set
out accurately in the presence of the Engineer’s Representatives and approved by them.
8.2.2. Procedure for temporary work
8.2.2.1. Materials
Provide new materials; if acceptable to the Architect, undamaged previously used materials in serviceable
condition may be used. Provide materials suitable for the use intended. Their use and methods of
installation shall not create unsafe unsafe conditions or violate requirements of applicable codes and
standards.
8.2.2.2. First Aid Supplies: Comply with governing regulations.
8.2.2.3. Temporary Site Facilities work according site layout
The following temporary work will be constructed in the project area during construction of MDHP project
area.
Site Office & Accommodation area at
Facilities work
8.2.2.3.1. Site Office & Accommodation Area
Site office area consist of the following facilities which is described below.
A. Site Office: 2 Nos Site office will be constructed for contractor and 1 Nos of Site office for Consultant
which will be separated from site office by wall.
B. Dormitory: 3 Nos. of dormitory will be constructed near at site office area.
Also one dining room will be constructed at east side of the site office area ear consultant office.
C. Other facilities:
Basketball court
Flaf platform
Workshop
Warehouse
Security room
Oil tank
Parking area
D. Access road, Two entry gates which will be 6m in width and internal road will be 4m in widh. One
entry gate for site office and another is for workshop and warehouse.
8.2.2.3.2. Facilities Work
A. Pile foundation temporary works facilities:
ss
During the construction of pile foundation work, the following temporary works will be constructed.
i. Camp for pile construction at west south area of the plant and which will be remain until the pile
foundation work finish.
ii. Temporary …..
B. Major structural work facilities
i. Bathing plant and raw material storage area at south west direction of the project 1 nos of batching
plant will be constructed where a water tank will be constructed.
ii. Raw material storage: Where materials and equipment must be stored, and are of value or attractive
for theft, provide a secure lockup. Enforce discipline in connection with the installation and release of
material to minimize the opportunity for theft and vandalism.
Raw material such as sand, small aggregate and big aggregate and reinforcement and other material which
will be used until finish the project.
Sand Storage: sand storage at
Stone chip storage: This project will be constructed with two size of aggregate such as big and small.
iii. Other facilities Work:
Laboratory & Office: 1 nos of laboratory will be constructed at the project area. And one office also implement
near laboratory.
Security Room: 1 nos of security room will be implement at the entrance of the project. Entry gate will be 6m
width. Install substantial temporary enclosure of partially completed areas of construction. Provide
locking entrances to prevent unauthorized entrance, vandalism, theft and similar violations of
security.
Toilet: In every corner of the project toilet and septic tank will be placed.
C. Access Road: Project access road will constructed in required places as per the requirements of the
construction.
8.2.2.4. Electrical Outlets and Linings
Provide light fixtures to illuminate the rooms and the laboratory facility. Provide adequate electrical supply to
every room for both contractor and consultant.
8.3. Execution
8.3.1. Installation
A. Use qualified personnel for installation of temporary site facilities. Locate facilities where they will
serve the project adequately and result in minimum interference with performance of the work.
Relocate and modify facilities as required.
B. Provide each facility ready for use when needed to avoid delay. Maintain and modify as required. Do
not remove until facilities are no longer needed, or are replaced by authorized use of completed
permanent facilities.
8.3.2. Temporary Utility Installation
8.3.2.1. General: Engage the appropriate local utility company or personnel to install temporary service or
connect to existing service.
8.3.2.2. Water Service: Water may be taken from local authority or placing underground system in such
quantities and at such times as they are available. If this is done, provide all temporary materials
necessary to extending the utility to where they will be used.
8.3.2.3. Temporary Electric Power Service:
When not available from local authority, must arrange own portable power and pay for electric service. If
electricity provide by employer than contractor need to arrange the required things and pay the
amount of money for using electricity
8.3.2.4. Barricades:
Warning Sign and Lights: Comply with standards and code requirements for erection of structurally adequate
barricades. Paint with appropriate colors, graphics and warning sign to inform personnel and the
public of the hazard being protected against. Where appropriate and needed provide lighting,
including flashing red or amber lights.
ss
g) All information leading to the accident including information, description, photos, time, location,
sources, witness statements, police and medical reports shall be prepared and submitted by the
project manager.
h) An emergency procedure reporting system will be placed on site a notice board with contract number.
Emergency vehicle, male nurse & safety office contact mobile to be highlighted on the bard on the
site.
9.4. Permit Requirements
a) Vehicle permit for trucks
b) Defensive driver permit
c) All the drivers have to undergo a Tool Box Talk regarding the Traffic Management on site.
d) Daily check of vehicle before commencement of duty is recommended.