Sunteți pe pagina 1din 7

1 I 15

ABB Power Generation

Harmony INFI 90 news The ABB Harmony INFI 90


news bulletin

Welcome to the first issue of the


Harmony INFI 90 news
Dear readers,

I’m pleased to bring you our first Harmony This news bulletin will help us share the which will be of interest to customers
INFI 90 news bulletin intended for users of news about ABB’s investments in new who have not yet signed up for a service
the ABB Harmony INFI 90 control system. products and software versions for the contract and lack these announcements.
You might wonder why we would start a Harmony INFI 90 control platform.
newsletter now for a control system that We plan to issue at least an annual news
was introduced in the 80s as Network 90. Secondly, we would like to tell you bulletin, packed with valuable information
It is not a marketing oversight, so let me about all upgrade possibilities designed for you. In addition, we encourage your
assure you there are good reasons. to increase the performance of this feedback and invite you to share your
system as well as the seamless, proven interests and comments with us. We are
First, it’s an opportunity to remind that migration possibilities for the HMI based delighted to provide any additional infor-
your Harmony INFI 90 control system on state-of-the-art hardware solutions, mation or advice you may need.
is still being developed and supported both of which can help secure your
by ABB. How can we do that? ABB’s equipment investments. I wish you happy reading.
commitment is the “Evolution without
obsolescence” concept. This keeps your And finally, we want to keep you up-to- Kind regards
control system up-to-date by just pro- date regarding worldwide ABB events Fabio Fargione
vi-ding small steps instead of a total including Harmony INFI 90 technology as Harmony Evolution Manager
replace solution. well as status reports and platform notes, ABB Power Systems Division
Project news Events

ABB Harmony upgrade provides secure,


reliable and powerful control

Duvha power station is a six unit, coal- The Duvha plant's control system con- from the late 1990s is based on Process
fired power plant operated by the South sists of the ABB Harmony INFI 90 Portal B / Windows 2000.
African electrical utility, Eskom, with a total process control system, with 17 power
installed capacity of 3,600 megawatts conditioning units (PCUs), multi-function After more than 15 years of good opera-
(MW). The plant is located in approxima- processors (MFP), bridge controllers tion the system faced normal component
tely 15 km east of Witbank in Mpumalanga (BRC100) and block I / Os. The original aging, in addition to fast evolution of the
province. human machine interface (HMI) solution plant operating system.

Site assessment and service solves plant water problem.


The Duvha plant were encountering NTCF modules in this component crea- report that presented a clear picture
problems with system stability in its ted a critical situation for the customer, of system status, highlighting critical
water treatment plant (WTP), where the in some cases forcing the shutdown of all actions and defining a multi-step ap-
Harmony INFI 90 control system has units, causing load shedding. proach in order to update the system
been operating since 1998. and make it more reliable.

The WTP is a critical component of the


site, and malfunctions can result in a to-
GEC engineers identified the problem
and provided Eskom with a solution to
fix the instability. Their system site as-
Welcome to the ABB events
tal plant shutdown. Normal aging of the sessment also generated a life cycle
Here you can find all events and conferences from the power generation industry that may be of interest for you.

All events are hosted by the Power Generation users themselves and focuson meeting, sharing experiences and
Engineering station upgrades enable new redundancy bridge controller. exchanging best practices. In addition, they are the perfect platform to experience the latest Harmony INFI 90 product
updates and system news by ABB.
The first step was an update of the Har- system, without impacting normal plant
mony engineering to the latest version of
Composer for Harmony applications.
operations. Benefits of If you would like to participate in one of the Power Generation events, please do not hesitate to contact us.

The engineering tool upgrade enabled the ABB solution


All data and parameters was saved and the customer to use the new BRC mo-
imported into the new engineering server, dules, and upgrade some of the existing
after the proper project conversion. The MFP modules. The ABB multi-step evolution Event Country Start date End date City
work was done in parallel to the running approach enables the customer
to better manage its maintenance MEORGA MSR-Spezialmessen 2015 Germany 10.06.2015 10.06.2015 Hamburg
budget. The system evolution
guarantees a more powerful
HydroVision International 2015 USA 14.07.2015 17.07.2015 Portland, Oregon
and reliable redundant system,
eliminating plant outages. International Desalination World
USA 30.08.2015 04.09.2015 San Diego, CA
Congress 2015
Between the first and the last step
of the evolution, all the replaced PowerGen Asia 2015 Thailand 03.09.2015 05.09.2015 Bangkok
devices can be “refreshed,” while
also ensuring the spare parts MEORGA MSR-Spezialmessen 2015 Germany 16.09.2015 16.09.2015 Landshut
needs of almost all the obsolete
components still installed. The
MEORGA MSR-Spezialmessen 2015 Germany 14.10.2015 14.10.2015 Braunschweig
direct involvement of the ABB GEC
Harmony and local ABB teams Russian
ensures a fast and proper response RUGRIDS-ELECTRO 2015 19.10.2015 22.10.2015 Moscow
Federation
to any future customer needs.
Power-Gen International 2015 USA 08.12.2015 10.12.2015 Las Vegas, NV

2 The ABB Harmony INFI 90 news bulletin 1 | 15 The ABB Harmony INFI 90 news bulletin 1 | 15 3
Platform news Platform news

ABB control systems Harmony INFI 90 Available life cycle parts services
extends its life cycle support ABB offers a comprehensive range of ABB’s life cycle parts services portfolio ABB ensures that our customers receive
spare parts with short lead times, which meets customers’ needs to minimize the best possible return on their assets
helps minimize downtime if a failure costs and maximize the value of their throughout the entire product life cycle.
Symphony Harmony is a proven process control system used for demanding occurs. investments in ABB equipment.
applications in various industries.

The wide range of Harmony references introduced in 1980 as Network 90, the new generation enhances its predeces-
includes the power generation, chemical, system has gone through several evolu- sors and is backwardly compatible with

inventory Access™ Program


Preventive maintenance kits
pharmaceutical, pulp and paper, water tionary steps: INFI 90, INFI 90 Open, and them – all in accordance with our long-

Refurbished parts service


and wastewater, petrochemical, metals Symphony Harmony. held policy of ‘Evolution without obso-

Emergency parts service

Parts exchange service


and mining, food and beverage, cement, lescence. And now Symphony Harmony
and sugar industries – with over 6,000 For more than 30 years, ABB has evolved is taking the next step in its evolutionary

Parts repair service


Spare parts service
systems installed worldwide. Originally the Symphony family, ensuring that each path.

Parts test service

Evolution without
Non-active since

Obsolecence to
OIS2 x CVMS
OIU PGP
HMI MCS
OIS4x CNT
PPA
S+ Operations
PCV PPB

Product

Status
Engineering EWS WinTools Composer S+ Engineering

OIS Series Before 1998 Obsolete S+ Operations


S+ Control:
COM
Contollers MF
MFP BRC BRC300/400/410 Conductor VMS 2004 Limited O O O S+ Operations
HPC800/SPC700
Conductor NT 2010 Limited O O O S+ Operations

1980’s 1990’s – 2000’s – Today –


Process Portal B 2009 Limited O O O S+ Operations
System Network 90 INFI 90 Symphony Harmony Symphony Harmony
LAN90 PCV 2011 Classic O O O O O O O O S+ Operations
Continuous, upward compatible improvements Power Generation Portal 2014 Classic O O S+ Operations
Symphony Plus Operation Active
Introducing Symphony® Plus – Total plant automation for the power and Wintool/CAD EWS 2004 Obsolete S+ Enginering
water industries. Composer Harmony 5.x 2011 Obsolete S+ Enginering

Like its predecessors listed above, Sym- generation and water treatment. as customers continue to upgrade and Composer Harmony 6.1 Active
phony Plus is designed to meet the evolve their installed systems to our lat- Symphony Plus Engineering Active
requirements of plant owners in all geo- Automation Sentinel remains the key est generation offerings.
Network 90 Power System 1999 Obsolete MPSIII
graphic markets and in all types of power program for lifecycle system support
Modular Power System I 2001 Obsolete MPSIII
Modular Power System II 2003 Limited O O O MPSIII
Modular Power System III Active
ABB life cycle policy statement Bridge Controller Active
Multi-Function Processor 2006 Limited O O O BRC410

ABB’s control systems are designed for Harmony Area Controller 2004 Limited O O O HPC800
continuous evolution. It is ABB’s goal to Harmony Rack Controller BRC410 Active
protect our customers’ intellectual invest-
Active Classic Limited Obsolete
Harmony Din Controller HPC800 Active
ment (i.e. application software) beyond
the life cycles of the underlying platform Harmony Block I/O 2003 Limited O O O S800 I/O
products (i.e. hardware and software). Once a product has been removed from It is ABB’s intention to provide support Harmony Rack I/O HR Series Active
active sale, ABB will continue to support for as long as there are significant cus-
Harmony Din I/O SD Series Active
ABB will not “Remove from Active Sale” the product for at least 10 years, al- tomer needs after the “Manufacturing
any product or “family” of products un- though exceptions to this may occur if End” through field service, repair and Harmony with S800 I/O Active
til an equivalent replacement to those components or technologies needed are by making replacement spares (new or Harmony Control Network Active
products is available. no longer provided to ABB. refurbished modules) available.

4 The ABB Harmony INFI 90 news bulletin 1 | 15 The ABB Harmony INFI 90 news bulletin 1 | 15 5
Platform news Platform news

Harmony INFI 90 Performance Fingerprint PGP Benchmark and Fingerprint


Identifying system performance Opportunities for system performance
improvement opportunities improvements
The Harmony Performance Fingerprint cycle status, operating condition and and PCU nodes communication loading. The PGP Benchmark and Fingerprint from the installed system and compared overview of the system status, and the
diagnoses system status and performance maintenance practices associated with More specifically, the audit includes net- provides a comprehensive diagnostic ana- to requirements and best practices. Fingerprint report presents the evaluated
in order to identify peak system opera- Harmony have critical roles in cost-effec- work monitoring/peak loading and per- lysis of the Power Generation Portal Non-optimal system states and settings findings and detailed recommendations
tion. Using ABB’s proprietary analyzer soft- tively managing the system, associated formance thresholds. (PGP) system. Performance, configura- are automatically identified. As a result, for improvement.
ware, Harmony Performance Analyzer™, control system equipment and applica- tion and life cycle parameters are read the Benchmark report provides a quick
ensures control system performance is not tions are also reviewed. Included in the Once the evaluation is complete, a com-
affected while ABB engineers perform Harmony Performance Fingerprint is the prehensive report is generated and the de-
the audit to collect system topology and measurement and analysis of INFINET tailed findings and strategy for issue reso-
configuration information. Because life performance, Controller CPU utilization lution are presented to the plant personnel. What is being checked
The PGP Benchmark and Fingerprint This includes: The PGP Benchmark and Fingerprint
include comprehensive measurement of − PGP internal core components establish a perfect initial step in achieving
What is being checked system parameters which are mandatory health-state improved system performance levels.
for reliable operation. − Database configuration consistency ABB continuously improves and ex-
− Module firmware levels − System settings that restrict maxi- software version levels to determine checks pands Health Check Services, and as
− Redundant modules with conflicting mum communication performance if updates may result in higher system − Hardware components configuration a result steadily improves the perfor-
firmware revisions − NIS communication poll rate settings performance. (B) System architecture is − Computer runtime parameters mance of its customer base.
− Potential communication loop − Module reporting error codes mapped during the Fingerprint so that − Network parameters and performance
performance issues problems such as communication inter-
− Situations that may cause temporary (A) The Harmony Performance Finger- ruptions can quickly and easily be identi-
system performance degradation print identifies hardware, firmware and fied and fixed.

Report
Report

A. Firmware version B. System architecture

6
Loop Node Mod Type Rev
C
1 15 0 INIIT03 B4
1 16 0 INIIT03 B4 7 8
1 17 0 INIIT03 B4 C C
1 18 0 INIIT03 B4
1 19 2 INICT03 G0
1 20 2 INICT03 G8 PCU = process control unit
1 21 2 INICT03 G3
C = console/computer
1 22 2 INICT03 G9 1 9
1 40 1 INIIT03 B4 PCU C
2 1 0 INNPM01 E5
2 1 2 IMMFP02 G5
2 1 3 IMMFP02 G5
2 2 0 INNPM01 E5 2 3
2 2 2 IMMFP02 G5 PCU PCU

6 The ABB Harmony INFI 90 news bulletin 1 | 15 The ABB Harmony INFI 90 news bulletin 1 | 15 7
Training Center

ABB Training Center


Your gateway to specific Harmony INFI 90 training

Training programs for engineers, pro- on-line. We help you to increase the skill in any given situation hence improving
grammers, maintenance and operations level and knowledge of your employees operational efficiency of your assets.
personnel provide up-to-date technical through  training assessment programs
expertise for existing and new products, including competence development, cus-
processes, and technology advances. tom courseware and coaching services.

We offer training on-site at ABB training Accurate training will increase your capa-
facilities, locally at your plant site, or bility to respond rapidly and efficiently

Course Title Course Goals Duration


Code
Symphony Harmony S-SH-BC The attendees will receive an overview of the system, 4 ½ days
Basics and Configuration a description of the configuration structure, the Monday
concepts and the capabilities of Symphony Harmony to Friday
control system.
Symphony Harmony S-SH-COMP This course covers the a complete methodology used 4 ½ days
Engineering Composer to control system programming, using a familiar Industry Monday to
Standard Windows User Interface. Using a process Friday
control loop model as a base project, the attendees will
use the Automation Architect program to create process
control configuration strategies and relevant documen-
tation. The attendees will be able to configure and modify
the configuration into the automation unit modules. They
will learn how to handle the engineering workstation,
as well as the usage of on-line functions.
Symphony Harmony S-SH-MNT Hands-on exercises give attendees the opportunity 4 ½ days
Diagnostic and to operate, install, and maintain the Harmony Rack I/O Monday to
Maintenance DCS. The attendees will be able to follow all operations Friday
related to installing and commissioning the system. They
will understand hardware documentation and recognize,
diagnose and remedy fault conditions within the Symphony
system using system diagnostic tools.
Power Generation S-SH-PGP The attendees will be able to understand and design basic 4 ½ days
Portal Operation and architecture of a Power Generation Portal system; they Monday to
Configuration will learn to operate and perform basic configuration tasks Friday
of a Power Generation Portal system.
Power Generation Portal S-SH-PGP_ADV The attendees will be able to design complex Power 4 ½ days
Advanced Configuration Generation Portal architectures, to perform advanced Monday to
editing tasks of databases and custom graphics, to Friday
export / import data to external hosts, to modify access
rights, and to perform advanced configurations of log
and report.

8 The ABB Harmony INFI 90 news bulletin 1 | 15 The ABB Harmony INFI 90 news bulletin 1 | 15 9
Contact Contact

Harmony INFI 90 presence worldwide


We are here to support you

Harmony INFI 90 Global Execution


Center ABB Italy – Power Systems Division
Fabio Fargione
Phone: +39 335 6506 0423
Email: fabio.fargione@it.abb.com

ABB UK: Oliver Jennes


Phone: +44 7710 380081
Email: oliver.jennes@uk.abb.com

ABB Canada: Kevin L. Aris


Phone: +1 403 650 7131 ABB Cina: Li Zhou
ABB Poland: Piotr Szkoda
Email: kevin.l.aris@ca.abb.com Phone: +86 181 0119 6655
Phone: +48 601 883 937
Email: li.zhou@cn.abb.com
Email: piotr.szkoda@pl.abb.com

ABB USA: Tom Maczuzak


ABB South Korea: Jong-Sig Park
Phone: +1 440 585 6862 ABB Spain: Juan-Carlos Larranaga
Phone: +82 104 098 3181
Email: tom.maczuzak@us.abb.com Phone: +34 63 645 5176
Email: jong-sig.park@kr.abb.com
Email: juan-carlos.larranaga@es.abb.com

ABB Thailand: Chaiwoot Saarddee


ABB Algeria: Elias Mouallem Phone: +66 89 9278 660
Phone: +213 98 2501058 Email: chaiwoot.saarddee@th.abb.com
Email: elias.mouallem@dz.abb.com

ABB Singapore: Anupam Banerjee


Phone: +65 96 38 8569
Email: anupam.banerjee@sg.abb.com
ABB Italy: Fabio Fargione
ABB India: Ahmad Khan
Phone: +39 335 6506 0423
Phone: +91 99 0149 1123
Email: fabio.fargione@it.abb.com
Email: ahmad.khan@in.abb.com
ABB Australia: Nirupa Chander
ABB Greece: Paris Papageorgiou Phone: +61 3 8577 7078
Phone: +30 6936 900 368 Email: nirupa.chander@au.abb.com
ABB UAE: Prakash Mysore
Email: paris.papageorgiou@gr.abb.com
Phone: +971 50 8121048
Email: prakash.mysore@ae.abb.com

ABB Chile: Hugo Herrera ABB Egypt: Mohamed Mostafa


Email: hugo.herrera@cl.abb.com Phone: +20226251320
Email: mohamed.mostafa@eg.abb.com ABB Turkey: Baris Unver
Phone: +90 533 961 8537
Email: baris.unver@tk.abb.com

ABB Argentina: Daniel Guerrero ABB South Africa: Edith Kikonyogo ABB Indonesia: Homijujung Sihombing
Phone: +54 911 6026 5606 Phone: +27 60 544 6346 Phone: +62 811 213 1513
Email: daniel.guerrero@ar.abb.com Email: Edith.Kikonyogo@za.abb.com Email: homijujung.sihombing@id.abb.com

10 The ABB Harmony INFI 90 news bulletin 1 | 15 The ABB Harmony INFI 90 news bulletin 1 | 15 11
Contact us
Harmony Global Execution Center

ABB Italy SpA Notice

06.15
The information in this document is subject to change without notice
Power Systems Division Service
and should not be construed as a commitment by ABB. ABB assumes
Via Enrico Albareto 35, no responsibility for any errors that may appear in this document. In

9AAK10103A1068
16153 Genoa, Italy no event shall ABB be liable for direct, indirect, special, incidental or
Hotline Phone: +39 010 607 37 77 consequential damages of any nature or kind arising from the use
of this document, nor shall ABB be liable for incidental or consequential
Email: gec.harmony@it.abb.com
damages arising from use of any software or hardware described in
this document. This document and parts thereof must not be reproduced
ABB Training Center or copied without written permission from ABB, and the contents thereof
Power System Division Service must not be imparted to a third party nor used for any unauthorized

© Copyright 2015 ABB All rights reserved


purpose.
Via Luciano Lama 33,
20099 Sesto San Giovanni MI
Phone: +39 02 24143858
Email: loredana.dialessio@it.abb.com

new.abb.com/power-generation/
power-plant-automation/harmony

S-ar putea să vă placă și