MANAGEMENT TRAINEE TRAINING PLAN 6/27/2019 6/28/2019 6/29/2019 7/2/2019 7/3/2019 7/4/2019

i. QUALITY
1. BOM LIST 8hrs
WHAT IS BOM LIST? 6
HOW TO USE THE BOM LIST 2
2. MATERIAL SPECIFICATION 8hrs
DETERMINE SPECIFICATIONS BASED ON THE BOM LIST 4
ACCEPTANCE LIMIT OF MATERIALS 4
3. PRODUCTION SPECIFICATION 8
DETERMINE THE STANDARD SPECIFICATION OF PRODUCT
WATTAGE 2
VOLTAGE 2
AMPERE 2
PHYSICAL ATTRIBUTE 2
4. NON CONFORMITY
4.1 NATURE OF DEFECTS 8
MATERIALS (how it affects) 3
PROCESS (how it affects) 2
MANPOWER (how it affects) 3
ii. PRODUCTION PROCESS
1. E-FAN PROCESS
HOW IT IS MADE (STEP BY STEP PROCESS) 2
What are those critical process that affects quality and productivity 4
2. EQUIPMENT REQUIREMENTS
WHAT EQUIPMENT IS/ARE REQUIRED FOR EACH PROCESS 2
3. PERSONNEL ASSIGNMENT
WHO ARE RESPONSIBLE PERSON FOR EACH PROCESS 2
WHAT IS QUALIFICATION REQUIRED FOR EACH PROCESS
4. PRODUCTION CAPACITY
WHAT IS THE CAPACITY OF THE PRODUCTION LINE
WHAT IS KPI OF PRODUCTION LINE
TOTAL HOURS
MANAGEMENT TRAINEE TRAINING PLAN 7/6/2019 7/7/2019 7/8/2019 7/9/2019 7/10/2019 7/11/2019
iii. GENERATING REPORTS WS
1. PRINCIPLES OF REPORTS
WHAT IS IMPORTANCE OF REPORT? 2
A
WHY NEED FOR REPORT 2 S
2. DOCUMENTATION/DOCUMENTS REQUIREMENT S
WHAT ARE DOCUMENTS NEEDED? 2 2 E
3. ACCOMPLISHMENT OF REPORT R S
HOW TO USE THE FORMS/DOCUMENT 4 E S
IMPORTANCE OF ACCOMPLISHED DOCUMENTS 2 V M
4. REVIEW OF RECORDS I E
WHY NEED TO REVIEW THE RECORDS? 2 E N
WHEN TO REVIEW RECORDS 2 4 W T
5. PRESENTATION/INTERPRETATION OF RECORDS
WHO WILL SUBMIT THE RECORDS? 2 D
WHEN TO SUBMIT RECORDS 2
A
HOW ARE THE RECORDS ARE BEING KEPT 2
Y
WHEN TO RETRIEVE RECORDS 2
TOTAL HOURS
7/4/2019 7/5/2019 total hrs

16

2 4

8 8
60
7/11/2019 7/12/2019 total hrs

D
A E
S L 4
S I
E V 4
S E
S R
M A 6
E T
N I
T O 8
N
D
4
A D
Y A
4
Y 30
MANAGEMENT TRAINEE TRAINING PLAN Criteria Score

i. QUALITY 100% 0%
1. BOM LIST Direct Materials 55%
WHAT IS BOM LIST? Indirect Materials 30%
HOW TO USE THE BOM LIST Overhead Cost 15%
2. MATERIAL SPECIFICATION 100%
DETERMINE SPECIFICATIONS BASED ON THE BOM LIST 50%
ACCEPTANCE LIMIT OF MATERIALS 50%
3. PRODUCTION SPECIFICATION 100%
DETERMINE THE STANDARD SPECIFICATION OF PRODUCT
WATTAGE 20%
VOLTAGE 20%
AMPERE 20%
PHYSICAL ATTRIBUTE 40%
4. NON CONFORMITY 100%
4.1 NATURE OF DEFECTS
MATERIALS (how it affects) 50%
PROCESS (how it affects) 30%
MANPOWER (how it affects) 20%
ii. PRODUCTION PROCESS
1. E-FAN PROCESS 100%
HOW IT IS MADE (STEP BY STEP PROCESS) 40%
What are those critical process that affects quality and productivity 60%
2. EQUIPMENT REQUIREMENTS 100%
WHAT EQUIPMENT IS/ARE REQUIRED FOR EACH PROCESS 100%
3. PERSONNEL ASSIGNMENT 100%
WHO ARE RESPONSIBLE PERSON FOR EACH PROCESS 60%
WHAT IS QUALIFICATION REQUIRED FOR EACH PROCESS 40%
4. PRODUCTION CAPACITY 100%
WHAT IS THE CAPACITY OF THE PRODUCTION LINE 70%
WHAT IS KPI OF PRODUCTION LINE 30%
MANAGEMENT TRAINEE TRAINING PLAN
iii. GENERATING REPORTS 100%
1. PRINCIPLES OF REPORTS 10%
WHAT IS IMPORTANCE OF REPORT?
WHY NEED FOR REPORT
2. DOCUMENTATION/DOCUMENTS REQUIREMENT 10%
WHAT ARE DOCUMENTS NEEDED?
3. ACCOMPLISHMENT OF REPORT 35%
HOW TO USE THE FORMS/DOCUMENT
IMPORTANCE OF ACCOMPLISHED DOCUMENTS
4. REVIEW OF RECORDS 25%
WHY NEED TO REVIEW THE RECORDS?
WHEN TO REVIEW RECORDS
5. PRESENTATION/INTERPRETATION OF RECORDS 20%
WHO WILL SUBMIT THE RECORDS?
WHEN TO SUBMIT RECORDS
HOW ARE THE RECORDS ARE BEING KEPT
WHEN TO RETRIEVE RECORDS
TOTAL 100% 0%
0% 0% 0%

0% 0% 0%