PROCESS LEVEL ENERGY

MANAGEMENT TEAM
ON
ASH HANDLING PLANT
MEMBERS:
R K OJHA, LEADER

ROMIT MOHAPATRA,
MEMBER

K V REDDI, MEMBER

DILIP DAS, MEMBER


NALCO AT A GLANCE

WIND POWER PLANT CORPORATE OFFICE SOLAR POWER PLANT

BAUXITE MINES ALUMINA REFINERY ALUMINIUM SMELTER

CAPTIVE POWER PLANT PORT FACILITIES


ROLLED PRODUCT UNIT
SALIENT FEATURES

BAUXITE MINES: ALUMINA REFINERY: ALUMINIUM SMELTER:


 Area od deposit – 16Sq.KM  Capacity – 22.75 Lakh TPA  Capacity – 4.60 Lakh TPA
 Resource – 310 MT  Atmospheric pressure digestion  180KW Cell technology
 Capacity – 68.25 Lakh TPA  Pre-desilication & inter-stage  Micro-processor based pot
 Transport – 14.6KM long cable cooling for higher productivity regulation system
belt conveyor  Co-generation –4X18.5MW power  Ingot, wire rod, billet, strip
casting

CAPTIVE POWER PLANT: ROLLED PRODUCT UNIT: PORT FACILITIES:


 Capacity – 1200 MW  Capacity – 50000 MT/ annum  Location: Visakhapatnam
 Micro-processor based burner  Products – Cold rolled sheets, coils  Export - Alumina
management system from continuous caster route  Import – Caustic Soda
 Automatic turbine run-up  Technology – FATA Hunter of Italy  Mechanised storage and ship
system handling facilities
 Specially designed barrel type
high pressure turbine

WIND POWER PLANT: SOLAR POWER PLANT:


 Capacity – 50.4 MW, A.P.,  Capacity – 260 KW
commissioned in Dec’2012  Commissioned roof top solar
 Capacity – 47.6 MW, Rajastan, power plant at Corporate Office
commissioned in Jan’2014
ALUMINA REFINERY
ALUMINA MAKING PROCESS

STEAM GENERATION PROCESS

BOILERS: TURBOGENERATORS:
Make – M/s BHEL Make – M/s BHEL
Capacity – 4 Boilers of 200TPH Capacity – 4 TGs’ of 18.5MW
– 1 Boiler of 250TPH Type - Extraction back
Type - VU40, Bi-drum, natural pressure TG
circulation, oil/ p.f. fired, fixed Higher cycle efficiency due to
tangential corner fired co-generation
PROCESS FLOW DIAGRAM
FUEL

STEAM
AIR BOILER FLUE GAS
CHIMNEY

ECONOMISER

DM WATER AIR PRE-HEATER


DRY ASH
COLLECTION
ESP

WET ASH SYSTEM


FLY ASH
SILO

ASH POND
6
PRAYASH QC
WET ASH DISPOSAL SYSTEM

STREAM#6

BLR #5 ESP STREAM#5

BOTTOM
ASH HOPPER STREAM#4
BLR #4

BOILER
BLOW
BLR #3 DOWN
STREAM#3

BLR #2 ECONOMISER
STREAM#2

BLR #1 AIR STAGE


PREHEATER STREAM#1 3

STAGE
2
STAGE
1 LINE - 1 5 2 3 4
7
PRAYASH QC
ASH DISPOSAL PUMP HOUSE
ASH SLURRY PUMP

ASH SLURRY PIT

ASH POND
UPGRADATION
OF
ASH SLURRY PUMPS
ASH DISPOSAL PUMP HOUSE
ADPH-I ADPH-II
• NO. OF STREAMS : 03 • NO. OF STREAMS : 03
• ASH SLURRY PUMPS: 09NOS • ASH SLURRY PUMPS: 09NOS
• SERIES PUMPING • SERIES PUMPING
• CAPACITY: 635M3/HR • CAPACITY: 350M3/HR
• HEAD: 44MTRS • HEAD: 50MTRS
• MOTOR: 150KW • MOTOR: 110KW
ADPH-I
UPGRADATION OF ASH SLURRY PUMP
IN
STREAM-1 OF OLD ADPH

• ORIGINAL PUMP • UPGRADED PUMP


• EFFICIENCY : 67% • EFFICIENCY : 76%
• POWER CONS : 120KW • POWER CONS : 106KW
POWER SAVING
• INSTANTANEOUS POWER SAVING : 14KWH
• POWER SAVING PER DAY : 336KWH
• POWER SAVING PER ANNUM : 122640 KWH
• SAVING OF POWER @Rs 3.20/- : Rs 3,92,448/- (PER
PUMP PER ANNUM)
• SAVING OF POWER FOR ONE STREAM:Rs 11,77,344
/- (PER ANNUM)
CALCULATION OF PAY BACK PERIOD
• COST OF REPLACEMENT OF ONE PUMP : Rs 6,15,282/-
• COST OF REPLACEMENT OF ONE STREAM : Rs 18,45,846/-
• SAVING OF POWER FOR ONE STREAM:Rs 11,77,344 /- (PER
ANNUM)

• PAY BACK PERIOD : 1.6 YEARS

THE PAY BACK PERIOD IS ABOUT ONE YEAR APART


FROM IMPROVED LIFE OF COMPONENTS
WATER HORSE POWER
EFFICIENCY OF PUMP =

SHAFT HORSE POWER


REASON FOR INCREASE IN HYDRAULIC
EFFICIENCY

• FLOW PATTERN CHANGED FROM RADIAL


FLOW TO MIXED FLOW

• TWISTED VANE IMPELLER

• MODIFIED HYDRAULIC ASSEMBLY


MIXED FLOW

TWISTED VANE IMPELLER

MODIFIED HYDRAULIC ASSEMBLY


CONCLUSION

• EFFICIENCY INCREASED BY 9%

• POWER SAVING PER STREAM – 122.64 MW

• NET SAVING IN TERMS OF MONEY – Rs. 11,77,344 /-