1 INTRODUCTION ................................................................................................. 6
1.1 PURPOSE OF DOCUMENT .......................................................................................... 6
1.2 CONTENT ................................................................................................................. 6
1.3 INTENDED AUDIENCE ................................................................................................ 6
2 BASIC DATA....................................................................................................... 7
2.1 BILL OF MATERIAL .................................................................................................... 7
2.1.1 Control Data For Bills of Material ..................................................................... 7
2.1.1.1 Define Modification Parameters .................................................................... 7
2.1.2 Alternative Determination ................................................................................. 7
2.1.2.1 Define Order of Priority for BOM Usages ...................................................... 7
2.1.2.2 Define Applications ....................................................................................... 7
2.2 WORK CENTER ......................................................................................................... 8
2.2.1 General Data ................................................................................................... 8
2.2.1.1 Standard Value............................................................................................. 8
2.2.1.1.1 Define Parameters ................................................................................ 8
2.2.2 Routing Data .................................................................................................... 8
2.2.2.1 Define Control Key ....................................................................................... 8
2.2.3 Capacity Planning ............................................................................................ 8
2.2.3.1 Determine Capacity Planner ......................................................................... 8
2.2.3.2 Work Center Formulas ................................................................................. 8
2.2.3.2.1 Define formula for work center .............................................................. 8
3 SALES & OPERATIONS PLANNING ..... ERROR! BOOKMARK NOT DEFINED.
3.1 FUNCTIONS ............................................................ ERROR! BOOKMARK NOT DEFINED.
3.1.1 Mass Processing .............................................. Error! Bookmark not defined.
3.1.1.1 Define Activities ............................................. Error! Bookmark not defined.
3.1.1.2 Maintain Transfer Profiles .............................. Error! Bookmark not defined.
4 MATERIALS REQUIREMENTS PLANNING ...................................................... 9
4.1 PLANT PARAMETERS................................................................................................. 9
4.1.1 Carry out Overall Maintenance of Plant Parameters ........................................ 9
4.2 MRP GROUPS .......................................................................................................... 9
4.2.1 Carry out Overall Maintenance of MRP Groups ............................................... 9
4.3 NUMBER RANGES ..................................................................................................... 9
4.3.1 Define number ranges for planning run ............................................................ 9
4.4 MASTER DATA ........................................................................................................ 10
4.4.1 Define MRP Controllers ................................................................................. 10
4.5 PLANNING .............................................................................................................. 11
4.5.1 MRP Calculation ............................................................................................ 11
4.5.1.1 Define Planning Horizon ............................................................................. 11
4.5.1.2 Stocks ........................................................................................................ 11
4.5.1.2.1 Define Availability of Stock in Transfer/Blocked Stock/Restricted Stock
11
4.5.1.3 Define Rescheduling Check ....................................................................... 11

Page 3 of 25
Configuration

4.5.1.4 Define Error Processing In the Planning Run.............................................. 12


4.5.2 Scheduling and Capacity Parameters ............................................................ 12
4.5.2.1 Define Floats (Scheduling Margin Key)....................................................... 12
4.5.2.2 Define scheduling parameters for planned orders ...................................... 13
4.5.3 Procurement Proposals ................................................................................. 13
4.5.3.1 Define External Procurement...................................................................... 13
4.5.3.2 Define Line Item Number ............................................................................ 14
4.5.4 BOM Explosion .............................................................................................. 14
4.5.4.1 Define BOM Explosion Control ................................................................... 14
4.5.4.2 Define BOM Selection ................................................................................ 14
4.5.5 Activate Run Time Statistics .......................................................................... 15
4.5.6 Direct Procurement ........................................................................................ 15
4.5.6.1 Settings for Direct Procurement .................................................................. 15
4.6 PROCUREMENT PROPOSALS ................................................................................... 15
4.6.1 Planned Orders.............................................................................................. 15
4.6.1.1 Define availability check for components .................................................... 15
4.6.1.2 Define Storage Location and Supply Area Determination in BOM Explosion
16
4.6.2 Conversion of Procurement Proposals ........................................................... 16
4.6.2.1 Define Order Type for Conversion to Production/Process Order................. 16
4.6.2.2 Define conversion of Planned orders into Purchase Requistions ................ 16
4.7 PLANNING FILE ENTRIES ......................................................................................... 17
4.7.1 Activate MRP and Set up Planning File.......................................................... 17
5 SHOP FLOOR CONTROL ................................................................................ 17
5.1 MASTER DATA ........................................................................................................ 17
5.1.1 Order ............................................................................................................. 17
5.1.1.1 Define Order Types .................................................................................... 17
5.1.1.2 Define order type-dependent parameters ................................................... 17
5.1.1.3 Define status profile .................................................................................... 19
5.1.1.4 Define number range for orders .................................................................. 19
5.1.2 Define production scheduling profile .............................................................. 19
5.2 OPERATIONS .......................................................................................................... 20
5.2.1 Define checking group ................................................................................... 20
5.2.2 Define checking control.................................................................................. 21
5.2.3 Define Checking Rule for Backorder Processing............................................ 21
5.3 SCHEDULING .......................................................................................................... 21
5.3.1 Define Scheduling Parameters for Production Orders .................................... 21
5.3.2 Define Scheduling Margin Key ....................................................................... 22
5.4 CAPACITY REQUIREMENTS PLANNING ...................................................................... 23
5.4.1 Determine Capacity Planner .......................................................................... 23
5.5 CONFIRMATION ....................................................................................................... 23
5.5.1 Define Confirmation Parameters .................................................................... 23
5.6 DEFINE PRINT CONTROL ......................................................................................... 24
5.7 INTEGRATION ......................................................................................................... 25
5.7.1 Define Valuation of Goods Received ............................................................. 25

Page 4 of 25
Configuration

Page 5 of 25
Configuration

1 Introduction
1.1 Purpose of Document
The primary purpose of this document is to describe the SAP configuration setting that have
been implemented for the entities under the Tyco Flow Control Asia. It represents one of the
project deliverables during the Project’s Blueprint Phase.

1.2 Content
All the configurations should be described using table format and screen capture should be
avoided.

There should be no changes to standard SAP configuration. If the standard SAP


configuration cannot be adopted, it should be copied into appropriate name space stated in
OSS Note 16466. The rationale of implementing non-standard SAP setting should be
provided.

1.3 Intended Audience


This document is intended for review by various IT within TFCA ASIA including the SAP
Support Consultants.

Page 6 of 25
Configuration

2 Basic Data
Menu path:
IMG  Production  Basic Data  Bill of Material  Control Data for Bills of Material

2.1 Bill of Material


2.1.1 Control Data For Bills of Material

2.1.1.1 Define Modification Parameters

Menu path:
IMG  Production  Basic Data  Bill of Material  Control Data for Bills of Material 
Define Modification Parameters

Validity
 Low Date

2.1.2 Alternative Determination

2.1.2.1 Define Order of Priority for BOM Usages

Menu path:
IMG  Production  Basic Data  Bill of Material  Alternative Determination Define
Order of Priority for BOM Usages

SelID SelPr BOM Usage


Z9 1 2

2.1.2.2 Define Applications

Menu path:
IMG  Production  Basic Data  Bill of Material  Alternative Determination Define
Applications

Application SelID AltSel PV Appli Expl Pl Rel Rel Rel Coll SO


Desc MRP Ord Cstg WkSch Ord With
Z999 Z9   Prod –       
Engin
(Usage
2)

Page 7 of 25
Configuration

2.2 Work Center

2.2.1 General Data

2.2.1.1 Standard Value

2.2.1.1.1 Define Parameters

Menu path:
IMG  Production  Basic Data  Work Center  General Data Standard Value 
Define Parameters
No need to configure, follow Japan

2.2.2 Routing Data

2.2.2.1 Define Control Key

Menu path:
IMG  Production  Basic Data  Work Center  Routing Data Define Control Key
No need to configure, follow Japan

2.2.3 Capacity Planning

2.2.3.1 Determine Capacity Planner

Menu path:
IMG  Production  Basic Data  Work Center Capacity Planning  Determine
Capacity Planner

Plnnr Description
QP1 TFCQ Cap Planner

2.2.3.2 Work Center Formulas

2.2.3.2.1 Define formula for work center


Menu path:
IMG  Production  Basic Data  Work Center Capacity Planning  Work Center
Formulas  Define formula for work center

Page 8 of 25
Configuration

3 Materials Requirements Planning


3.1 Plant Parameters
3.1.1 Carry out Overall Maintenance of Plant Parameters

Menu path:
IMG  Production  Materials Requirements Planning  Plant Parameters  Carry out
overall maintenance of plant parameters

Please look at the individual sections below.

3.2 MRP Groups


3.2.1 Carry out Overall Maintenance of MRP Groups

Menu path:
IMG  Production  Materials Requirements Planning  MRP Groups  Carry out overall
maintenance of MRP groups

Please look at the individual sections below.

3.3 Number Ranges


3.3.1 Define number ranges for planning run

Menu path:
IMG  Production  Number Ranges  Define number ranges for planning run

Planned Orders
Plant Name1 NRge pl.orders Simulative planned orders
3031 Qingpu 01 01

Interval: 0000000001 - 0019999999

Dependent reqmts
Plant Name1 NR : StkTrns Res
3031 Qingpu 01

Interval: 0000000001 – 89999999

Purchase Requisitions

Page 9 of 25
Configuration

Plant Name1 NR - PReg


3031 Qingpu 1E

Interval: 9020000000 – 9029999999

MRP List
Plant Name1 No. Range - MRP
3031 Qingpu 01

Interval: 00000000001 - 9999999999

Total Requirements
Plant Name1 NR: Total Reqmts
3031 Qingpu 01

Interval: 0000000001 - 1999999999

3.4 Master Data

3.4.1 Define MRP Controllers


Menu path:
IMG  Production Materials Requirements Planning  Master Data  Define MRP
Controllers

Plnt Name 1 MRP Cont. MRP Controller Name


3031 Qingpu Z01 徐娇燕
3031 Qingpu Z02 朱启芳
3031 Qingpu Z03 朱海琳
3031 Qingpu Z04 张权
3031 Qingpu Z05 傅德伟
3031 Qingpu Z06 徐惠娟
3031 Qingpu Z07 马沈洁
3031 Qingpu Z08 刘有才
3031 Qingpu Z09 姚秋华
3031 Qingpu Z10 周元仁
Page 10 of 25
Configuration

3.5 Planning
3.5.1 MRP Calculation

3.5.1.1 Define Planning Horizon

Menu path:
IMG  Production Materials Requirements Planning  Planning  MRP Calculation
Define Planning Horizon

Plant Plant Name Planning Horizon


3031 Qingpu 200

Plant Plant Name MRP Group Plan. Hor.


3031 Qingpu ZFG0 200
3031 Qingpu ZSF0 200
3031 Qingpu ZRM0 200

3.5.1.2 Stocks

3.5.1.2.1 Define Availability of Stock in Transfer/Blocked Stock/Restricted


Stock

Menu path:
IMG  Production Materials Requirements Planning  Planning  MRP Calculation 
Stocks  Define Availability of Stock in Transfer/Blocked Stock/Restricted Stock

Plant Name 1 Stock in Transfer Blocked Stk Restricted-use stock


3031 KTM  

3.5.1.3 Define Rescheduling Check


Menu path:

Page 11 of 25
Configuration

IMG  Production Materials Requirements Planning  Planning  MRP Calculation 


Define Rescheduling Check

Plant 3031
Rescheduling Horizon 200
Firmed Planned Orders 
Production Order 
Fixed Purchase Requisitions 
PO/SA Schedule Line 
QM Inspection Lot 
Shipping Notification 
Tolerance Value Forward 2
Tolerance Value for displacement 2

Plant 3031 3031 3031


MRP Group ZFG0 ZSF0 ZRM0
Rescheduling Horizon 200 200 200
Tolerance value forward
Tolerance value for
displacement

3.5.1.4 Define Error Processing In the Planning Run


Menu path:
IMG  Production Materials Requirements Planning  Planning  MRP Calculation 
Define Error Processing In the Planning Run

Plant Plant Name Max Proposals


3031 KTM 50

3.5.2 Scheduling and Capacity Parameters

3.5.2.1 Define Floats (Scheduling Margin Key)


Menu path:
IMG  Production Materials Requirements Planning  Planning  Scheduling and
Capacity Parameters  Define Floats (Scheduling Margin Key)

Plant Name 1 Marg. Op.Per Fl. Bef Fl. After Rel.Per


3031 Qingpu 000 0 0 0 0
3031 Qingpu 001 10 2 1 5
3031 Qingpu 002 2 0 0 2

Page 12 of 25
Configuration

3.5.2.2 Define scheduling parameters for planned orders


Menu path:
IMG  Production Materials Requirements Planning  Planning  Scheduling and
Capacity Parameters  Define scheduling parameters for planned orders

Plant 3031 3031


Order Type * PE
ProdScheduler * *
Detailed Scheduling
Sched.hor.det 0 0
SellD: Detailed 01 01
Scheduling 
Generate capacity reqs 
Rate-based Scheduling
Rate.plng.horzn 0 0
SellD:rate plng 02 02
Scheduling 
Generate capacity reqs 
Rough-cut Scheduling
RCutPlg horizon 0 0
SellD:roughPlng 03 03
Scheduling
Generate capacity reqs
Sequencing
Takt time/rate-based sched.
Adjust Scheduling
Scheduling Level Via detailed scheduling 1 Via rate based scheduling
Adjust Dates Adjust basic dates, adjust dep. 2 Do not adjust basic dates, dep
Reqmts to operation date reqmts to operation dates
For Capacity scheduling Always basic dates, dep. Reqmts to Always basic dates, dep reqmts to
operation dates operation dates
Scheduling control for detailed scheduling
Scheduling type 2 backwards 2 backwards
Start in the past 0 0
Automatic Log
Latest Staging Date
Scheduling with breaks
Reduction
Reduction Type All operations in the order will be All operations in the order will be
reduced reduced
Maximum Reduction Level 0 Do not reduce 0 Do not reduce
% reduction in floats L1 L2 L3 L4 L5 L6 L1 L2 L3 L4 L5 L6
0 0 0 0 0 0 0 0 0 0 0 0

3.5.3 Procurement Proposals

3.5.3.1 Define External Procurement

Menu path:
Page 13 of 25
Configuration

IMG  Production Materials Requirements Planning  Planning  Procurement


Proposals  Define External Procurement

Plant Name 1 MRP Name Sched: Doc Type Doc Type SC Doc Type
Group Info/Agrmt SPO STO
3031 Qingpu ZFG0 TFCQ
Finished
Goods
3031 Qingpu ZSF0 TFCQ Semi-
Finished
Goods
3031 Qingpu ZRM0 TFCQ Raw  ZAPR
Material

3.5.3.2 Define Line Item Number


Menu path:
IMG  Production Materials Requirements Planning  Planning  Procurement
Proposals  Define Line Item Number

Plnt Plant Name Item PR Item No. Stock Trans Res


3031 Qingpu 10 100

3.5.4 BOM Explosion

3.5.4.1 Define BOM Explosion Control


Menu path:
IMG  Production Materials Requirements Planning  Planning  BOM Explosion 
Define BOM Explosion Control

Plant Explosion Date Excl. Bulk Mat SOrd/WBS BOM Active BOM expl no.for MTO production
3031 

3023 

3.5.4.2 Define BOM Selection


Menu path:
IMG  Production Materials Requirements Planning  Planning  BOM Explosion 
Define BOM Selection

Plnt Name 1 BOM Sel ID Routing Sel ID


3031 Qingpu 01

Page 14 of 25
Configuration

3.5.5 Activate Run Time Statistics


Menu Path
IMG  Production Materials Requirements Planning  Planning  Activate Run Time
Statistics

Plant Plant Name Display List Frequency


3031 Qingpu 1

3.5.6 Direct Procurement

3.5.6.1 Settings for Direct Procurement

Plant 3031
Description KTM
Direct 3
producrment/production
Message Indicator 

Acc.asst unknown:direct U
procmt

3.6 Procurement Proposals


3.6.1 Planned Orders

3.6.1.1 Define availability check for components


IMG  Production  Material Requirements Planning  Procurement Proposals 
Planned Orders  Define availability check for components

Determine Check
Availability Check Z2
Checking Rule PP
Stocks
Include Safety Stock 
Stockin Tranfer 
Incl. quality insp stock 
Incl blocked stock
Incl. restricted-use stock
W/o subcontracting
Replenishment Lead Time
Check without RLT 
Storage location inspection
No.stor.loc.inspectn 
Missing parts processing

Page 15 of 25
Configuration

Checking period: GR 0
In/Outward movements
Incl. purchase orders 
Incl. purch.requisitions 
Incl. dependent reqs 
Include reservations 
Include sales reqmts 
Include deliveries 
Incl. ship.notificat. 
Incl. depen.reservat. X
Incl. rel.order reqs X
Incl. planned orders X
Incl. production orders X
Receipts in Past A (nclude receipts from past and future, with messages)

Plant
Plnt Avail. Check Rule
3031 PP

3.6.1.2 Define Storage Location and Supply Area Determination in BOM


Explosion
No need to configure

3.6.2 Conversion of Procurement Proposals

3.6.2.1 Define Order Type for Conversion to Production/Process Order

Plant
Plant Name 1 Prod. Perc
3031 KTM ZQTS

3.6.2.2 Define conversion of Planned orders into Purchase Requistions

Number of planned orders


Plant Plant Name Number of planned orders
3031 Qingpu 500

Page 16 of 25
Configuration

3.7 Planning File Entries


3.7.1 Activate MRP and Set up Planning File

Menu path:
IMG  Production  Material Requirements Planning  Planning File Entries  Activate
MRP and Set up Planning File

Material Requirements Planning


Plant Activate requirements planning
3031 

4 Shop Floor Control


4.1 Master Data

4.1.1 Order

4.1.1.1 Define Order Types

Menu path:
IMG  Production  Shop Floor Control  Master Data  Order  Define Order Types

Type Name
ZQTO TFC Qingpu MTO
ZQTS TFC Qingu MTS

4.1.1.2 Define order type-dependent parameters

Menu path:
IMG  Production  Shop Floor Control  Master Data  Order  Define Order Types-
Dependent Parameters

Plant 3031 3031


Order Type ZQTO ZQTS
Page 17 of 25
Configuration

Production Version 0 1
Routing
Application P P
Selection ID 01 01
Sequence Exchange 0 0
Task List Type N N
AltTaskListApplic.
Routing Selection 3 4
Alternative Sequences  
Check Op. Details
Routing Text

Entry Tool  
Oper/act. Increment 0010 0010
Reduction Strategy 01 01

BOM Application PP01 PP01

Search Procedure

Substitute MRP Ctrller


Substitute Scheduler

Reservation/Purch.Req 3 3
Collective PR

Inspection Type

For Order Header  


For Operation  
For Material  
For Production Resource/Tool

Update  

Header
Item
Operation

GR for Purchase Order  


GR for Production Order  
Planned Goods Issue  
Unplanned Goods Issue  

PDC Active

Workflow for Purchase Order


Change

Cstg variant planned ZPP1 ZPP1


Cstg variant actual ZPP2 ZPP2
Page 18 of 25
Configuration

Results Analysis Key 000002 000002


Planned cost Calcul 2 2
Cost collector
Net Order Price
Distribution Rule
Default Rule PP1 PP1

Collective order display


Graphics Profile 000001 000001

Group PP PP
Name standard standard
Index 2 2

ProfMissPrtsLstOrdNo 000001 000001


Missing Parts Prof. 000002 000002

4.1.1.3 Define status profile

Menu path:
IMG  Production  Shop Floor Control  Master Data  Order  Define status profile

No need to configure, follow Japan

4.1.1.4 Define number range for orders


Menu path:
IMG  Production  Shop Floor Control  Master Data  Order  Define number range
for orders

Order Type No. Range No. Range


PP01 1000000000 7999999999
ZIQR 8100000000 8199999999
ZRWI 8200000000 8299999999
ZRWC 8300000000 8399999999
ZRWD 8400000000 8499999999
ZRWT 8500000000 8599999999

4.1.2 Define production scheduling profile

Menu path:
IMG  Production  Shop Floor Control  Master Data  Define production scheduling
profile

Plant 3031 3031


Prod. Sched. Profile Z00001 Z00002

Page 19 of 25
Configuration

Automatic Actions
On Creation
Release
Document Links –Material
Document Links – BOM
On Release
Execute Printing  
Schedule Order 
Document Links– Material
Document Links-BOM
Create control recipe
Material Availability
Check
Confirm Available Partial
Qty
Goods Receipt
Automatic Goods Receipt 
Capacity Planning
Leveling
Overall Profile
Availability Check
Confirm Capacity
Finite scheduling 
Confirmation
No update of yield surplus
Adjust quantities in order
to actual values
No update of yield deficit
Batch Management
Automatic Batch Creation 2
in the Order
Batch Classification 2
Extended classification
Always Batch Split
Transport
Complete Transfer
Requirement
Confirmed quantity for TR
WM Request X X
GI via delivery
Order Type
Make-to-stock ZQTS
Make-to-order Prod. ZQTO
Engineer-to-order
Without material ZRWK ZRWK

4.2 Operations
4.2.1 Define checking group

Menu path:
IMG  Production  Shop Floor Control  Operations  Availability Check  Define
Checking Group

Av Description Totalsales TotDlvReqs Block No Check Accuml Response RelChkPlan

Page 20 of 25
Configuration

QtRq .
Z2 TFC Indiv Req A A 3

4.2.2 Define checking control

Plant 3031 3031 3031 3031 3031 3031


Order Type PP01 ZIQR ZRWC ZRWD ZRWI ZRWT
Availability Check 1 1 1 1 1 1
Material availability
No check
Check mat.   
Availability when
saving order
Checking rule PP PP PP PP PP PP
Component check
type
Collect. Conversion
PRT Availability
No Check      
Checking rule
Collect. Conversion
Capacity availability
No check   
Overall profile SAPSFCG013 SAPSFCG0 SAPSFCG0
13 13
Collect. conversion

4.2.3 Define Checking Rule for Backorder Processing


Menu path:
IMG  Production  Shop Floor Control  Operations  Availability Check  Define
Checking Rule for Backorder Processing
No need to configure, follow Japan

4.3 Scheduling
4.3.1 Define Scheduling Parameters for Production Orders

Menu path:
IMG  Production  Shop Floor Control  Operations  Scheduling  Define
Scheduling Parameters for Production Orders

Plant 3031 3031 3031 3031 3031 3031


Order Type ZQTO ZQTS ZRWC ZRWD ZRWI ZRWT
ProdShceduler * * * * * *
Detailed Scheduling
SellD: Detailed
Scheduling      

Generate      

Page 21 of 25
Configuration

capacity reqs.

Rate-based scheduling
SellD:rate plng
Scheduling
Generate
capacity reqs
Rough-cut scheduling
SellD:rough
Plng
Scheduling
Generate
capacity reqs
Adjust Scheduling
Adjust dates
Scheduling control for detailed scheduling
Scheduling 2 2 2 2 2 2
Type
Start in the 0 0 0 0 0 0
past
Automatic      
scheduling
Automatic log
Scheduling
with breaks
From
production
dates
Shift order
Requirements Date Determination for Components
Operation
Segment
Latest Staging
Date
Reduction
Reduction type
Maximum 0 0 0 0 0 0
reduction level
% reduction in 0 0 0 0 0 0
floats

4.3.2 Define Scheduling Margin Key


Menu path:
IMG  Production  Shop Floor Control  Operations  Scheduling  Define
Scheduling Margin Key

Plant Name1 Key Op Per Float after prod Float before prod Rel Per
3031 Qingpu 000 0 0 0 0
3031 Qingpu 001 10 1 2 5
3031 Qingpu 002 2 0 0 2

Page 22 of 25
Configuration

4.4 Capacity Requirements Planning


4.4.1 Determine Capacity Planner
Menu path:
IMG  Production  Shop Floor Control  Operations  Capacity Requirements
Planning  Determine Capacity Planner

Plnnr Description
QP1 TFCQ Cap. Planner

4.5 Confirmation
4.5.1 Define Confirmation Parameters

Menu path:
IMG  Production  Shop Floor Control  Operations  Confirmation  Define
Confirmation Parameters

Plant 3031 3031 3021 3021 3021 3021


Order Type ZQTO ZQTS ZRWC ZRWD ZRWI ZRWT
Generally valid
settings
Control Data
Process
Control
Generated
confirmations
w/o quantity
adjustment
Checks
Operation Not checked Not checked Not checked Not checked Not checked Not checked
Sequence
Underdelivery Not checked Not checked Not checked Not checked Not checked Not checked
Overdelivery Not checked Not checked Not checked Not checked Not checked Not checked
Results Rec Msg if no Msg if no Msg if no Msg if no Msg if no Msg if no
(QM) inspect result inspect result inspect result inspect result inspect result inspect result
exists exists exists exists exists exists
Date in Future     
HR update
No HR update
Selection
Open orders
Propose time
units
Automatic      
optimization
Hours
Minutes
Goods
Movements
All Components
General
individual entry
Confirmation

Page 23 of 25
Configuration

function except
fast entry
Confirm.type 1 1
Post open 
reservations
Error
handling/logs
Act.Costs
Termination for
Incorrect
ActCosts
Goods      
Movements
Termination for
Incorrect
Goods Movts
Operation indiv.
Entry using
initial scrn
Quantities
Propose 
Display      
confirmed
quantities
Display defaults      
Services
Propose
Display      
confirmed
services
Display defaults      
Dates
Propose dates 
Display      
confirmed
dates
Display defaults      
HR Data
Display 
Defaults
Screen control
for time ticket
Quantity/activity      
Act. data
Selection
+Finally 
confirmed
operations
+Confirmable
operations

4.6 Define Print Control

Menu path:
IMG  Production  Shop Floor Control  Operations  Define Print Control

Reference Order Type


Type RefordType
PP01 PP01

Page 24 of 25
Configuration

ZIQR PP01
ZRWC PP01
ZRWD PP01
ZRWI PP01
ZRWT PP01

Print Programs
Ref Order Type PV List Report Name

List Control for Transactions


RefOrdType Plant MRPCont. TransCode PV Npri CKeyCheck IndivList

Printer Specification
RefOrdType Plant MRP Cont. List WCPr OutDe Output Device

4.7 Integration
4.7.1 Define Valuation of Goods Received
Menu path:
IMG  Production  Shop Floor Control  Integration  Define Valuation of Goods
Received

Val. Area Val. Var.


3031 Z06

Page 25 of 25