UNDERGROUND PIPING MODIFICATON PROJECT AT KEAMARI TERMINAL" B"

NATIONAL TECHNICAL SERVICES(NTS)


MEASUREMENT BOOK (MB) PIPE LINE
SR# ITEM DESCRIPTION UNIT QUANTITY
1.0 MATERIAL SUPPLY
Pipe Dia 8" meter 26.370
Elbow 90 Degree NOS 4
Weld neck flange NOS 10
Spirl wound Gasket NOS 6
Stud bolts with Double Washer NOS 64
Blind Flange Dia 8" NOS 2
I -BEAM SIZE 200X100X6L 300MM NOS 2
ROUND BAR 20MM DIA ,L250MM NOS 2
BASE PLATE SIZE 185X185X6MM NOS 2
PIPE DIA 3" SIZE 60MM LONG NOS 2
U- CLAMPS FOR PIPE DIA 8" NOS 2
2.0 Fabrication ,WELDING INSTALLATION & DISMANTLING& TIE IN
Welding Joints NOS 20
RADIOGHAROPHY 10% NOS 3
Hydrotesting 1 Job meter 29.58
Surface paintig SQ.meter 19.83
INSTALLATION OF FIELD PIPE SUPPORTS NOS 2
3.0 TIE IN JOINTS AT SITE NOS 2
4.0 DISMANTLING OF TWO PIPE SPOOL DIA 8" FOR TIE IN meter 9
5.0 EXTRA DISMANTLING
DISMANTLING OF PIPE DIA 12" LDO PIPE LINE FOR INSTALLATION OF 8" Dia pipe line
underground to Above ground

TOTAL PIPE LINE DIA 12" meter 63


NOS OF HACKSAW CUT NOS 9
INSTALLATION OF BLIND DIA 12" NOS 1
INSTALLATION OF BLIND DIA 8" NOS 1
EMPUTY & SHIFTING ALL PIPE LINE LOADING & UNLOADING meter 63