Sunteți pe pagina 1din 20

GE POWER SERVICES

PROJECT MANAGEMENT
SYSTEM

PROJECT PROCEDURES

Site Check list for MV/LV Motors

Doc. No.:
GE Power Services GE26909-YGTG-Z-2-
0158
RESPONSIBLE FUNCTION: TAKE-OVER DEPARTMENT: DOC-TYPE: REVISION:
COMMISSIONING QA/QC RELEASE-MS 0A
CHECKED: APPROVED: PAGE
PREPARED: LANGUAGE:
FARIS SALMAN DONALD WEBSTER
MOHAMED ASIF.H ENGLISH 1
(QA/QC MANAGER-GE) (SITE MANAGER- GE)
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909

POWER AND WATER UTIITY COMPANY for JUBAIL and


YANBU

Revision of Changes
04
03
02
01
00
PROJECT PROCEDURE:
0A Create:
Issued for Review and Approval Mohamed
MohamedDoc.
Asif No.: 13.01.2019
GE26909-YGTG-Z-2-0158
Site CheckRev
list for MV/LV Motors. Asif. H Page 2 of 20
. Revision Use Name
Date: 13.01. 2019 Date
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909

POWER AND WATER UTIITY COMPANY for JUBAIL and


YANBU

No.
:

Record of Changes
03
02
PROJECT PROCEDURE: Create: Mohamed Doc. No.: GE26909-YGTG-Z-2-0158
Site Check01
list for MV/LV Motors. Asif. H Page 3 of 20
00 Date: 13.01. 2019
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909

POWER AND WATER UTIITY COMPANY for JUBAIL and


YANBU

0B
0A First Version
Rev
. Description of Change
No.
:

PROJECT PROCEDURE: Create: Mohamed Doc. No.: GE26909-YGTG-Z-2-0158


Site Check list for MV/LV Motors. Asif. H Page 4 of 20
Date: 13.01. 2019
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909

POWER AND WATER UTIITY COMPANY for JUBAIL and


YANBU

PROJECT PROCEDURE: Create: Mohamed Doc. No.: GE26909-YGTG-Z-2-0158


Site Check list for MV/LV Motors. Asif. H Page 5 of 20
Date: 13.01. 2019
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909

POWER AND WATER UTIITY COMPANY for JUBAIL and


YANBU

Contents
PROJECT PROCEDURE: Create: Mohamed Doc. No.: GE26909-YGTG-Z-2-0158
Check List (Motor and its feeder)________________________________________________________________4
Site Check list for MV/LV Motors. Asif. H Page 6 of 20
Date: 13.01. 2019
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909

POWER AND WATER UTIITY COMPANY for JUBAIL and


YANBU

1. Mechanical Check and Visual Inspection_____________________________________________________4


2. Electrical Test__________________________________________________________________________5
Motor and Its feeder Testing___________________________________________________________________6
1. Feeder information:_____________________________________________________________________6
2. Motor Name Plate details:________________________________________________________________6
3. Electrical Function Tests for the feeder:______________________________________________________6
PROJECT PROCEDURE: Create: Mohamed Doc. No.: GE26909-YGTG-Z-2-0158
4. SiteCable Insulation Resistance Test:___________________________________________________________6
Check list for MV/LV Motors. Asif. H Page 7 of 20
Date: 13.01. 2019
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909

POWER AND WATER UTIITY COMPANY for JUBAIL and


YANBU

5. Testing on Motors________________________________________________________________________7
6. Hot Checks on Motors____________________________________________________________________9

PROJECT PROCEDURE: Create: Mohamed Doc. No.: GE26909-YGTG-Z-2-0158


Site Check list for MV/LV Motors. Asif. H Page 8 of 20
Date: 13.01. 2019
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909 POWER AND WATER UTIITY COMPANY for JUBAIL and

Test Template Name:


LV/MV Motors and its feeder; Check List
Ge26909-YGTG-Z-2-0158
Template No.:
Date: 13/01/2019, Revision: 0A
Date/ Revision No:

Equipment Location GTG-01 Equipment Name: Cooling water Module


SLD No. Elementary Drawing No.:

Check List (Motor and its feeder)


1. Mechanical Check and Visual Inspection

SL. Check Remar


Test Description
No. s ks
1. Check for correctness of equipment nameplate data with OK
drawings and specifications.
2. Inspect, No Physical and Mechanical damages to assemble OK
or any devices.
3. Check for proper anchorage, grounding connection, OK
clearance around the cubicle assembly
4. Verify unit is clean and all shipping bracing, loose parts, and OK
documentation shipped inside cubicles have been removed.
5. Check bus bar bolted connection for proper torque values as OK
per manufacture recommendation
(if not available please refer NETA table 100.12* with
respective to type of fastener).
6. Perform low ohm resistance measurement (under electrical OK
test) with DLRO on bolted connection
7. Inspect terminal chamber of the motor for any damages, OK
tightness of bolts, barriers between the terminals etc
8. Check Phase marking are matched with approved drawings, OK
wherever applicable
9. Verify Filters are in place and vents are clear OK

10. Inspect enclosure for paint work OK

Name Company Signature Date


Tested by: YUGESH GE
Reviewed by :
Witnessed
by : Page 9 of 20
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909 POWER AND WATER UTIITY COMPANY for JUBAIL and

Test Template Name:


LV/MV Motors and its feeder; Check List
Ge26909-YGTG-Z-2-0158
Template No.:
Date: 13/01/2019, Revision: 0A
Date/ Revision No:

Equipment Location GTG-01 Equipment Name: Cooling water Module


SLD No. Elementary Drawing No.:

11. Check earthing connections are as per approved drawing. OK

12. Verify correct application of appropriate lubrication and OK


lubrication systems.
13. Verify that resistance temperature detector (RTD) circuits OK
conform to drawings.
14. Verify that metering or relaying devices utilizing RTDs have OK
the correct rating

2. Electrical Test
SL.
Test Description Checks Remarks
No.
Perform following Cold Check on Motor and its feeder record on test
template.
 Insulation test on cables
1.
 Motor Resistance
1 OK
 Motor Winding Resistance.
 Motor Winding Insulation Resistance
 Checks of RTDs

2. Perform following Hot Checks on Motor and its feeder record on test OK
7 template.
 Motor Protection Verification

Name Company Signature Date


Tested by: YUGESH GE
Reviewed by :
Witnessed
by : Page 10 of 20
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909 POWER AND WATER UTIITY COMPANY for JUBAIL and

Test Template Name:


LV/MV Motors and its feeder; Check List
Ge26909-YGTG-Z-2-0158
Template No.:
Date: 13/01/2019, Revision: 0A
Date/ Revision No:

Equipment Location GTG-01 Equipment Name: Cooling water Module


SLD No. Elementary Drawing No.:

SL.
Test Description Checks Remarks
No.
 Motor drive
 Motor Rotation
 Heat Run Test
 space heaters

Name Company Signature Date


Tested by: YUGESH GE
Reviewed by :
Witnessed
by : Page 11 of 20
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909 POWER AND WATER UTIITY COMPANY for JUBAIL and

Test Template Name:


Motor and Its Feeder Testing
Ge26909-YGTG-Z-2-0158
Template No.:
Date: 13/01/2019, Revision: 0A
Date/ Revision No:

Equipment Location GTG-01 Equipment Name: COOLING WATER MODULE


Tag Number 88FC-1 Elementary Drawing No.:

Motor and Its Feeder Testing


1. Feeder information:
Switchgear/Feed GT-MCC
er
CB Rating: 125A Over Load C772B
Rating:
Cable Size 3Cx50sqmm

2. Motor Name Plate details:


Manufacturer GENERAL ELECTRIC Type
Serial No ALFT018U002 Actual Y Δ 3PH
Connection
Power (KW or HP) 50 Frequency 60Hz
Full Load Current 59.9 Rated Voltage Y Δ 480V
Speed (Rev min- 1185 Power Factor 0.83
1)
Motor Space Heater
Rated Voltage 220V Rated Watts

3. Electrical Function Tests for the feeder:


Sl.No. Description Checks
1 DC/AC control tested.
2 On/Off switching manually/from local control tested.

4. Cable Insulation Resistance Test:


Cable Insulation Resistance in G ohms

Name Company Signature Date


Tested by: YUGESH GE
Reviewed by :
Witnessed
by : Page 12 of 20
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909 POWER AND WATER UTIITY COMPANY for JUBAIL and

Test Template Name:


Motor and Its Feeder Testing
Ge26909-YGTG-Z-2-0158
Template No.:
Date: 13/01/2019, Revision: 0A
Date/ Revision No:

Equipment Location GTG-01 Equipment Name: COOLING WATER MODULE


Tag Number 88FC-1 Elementary Drawing No.:

Information
Purpose U-E V-E W-E U-V V-W W-U
Power Cable 1.03 1.26 1.48 1.94 1.5 1.5
Space Heater >1G >1G >1G >1G >1G
>1G
Cable

5. Testing on Motors
5.1. Motor Winding Resistance Test

Phase R Ohm @ _____oC R Ohm @ 25 oC


T1-T2 0.16Ω
T2-T3 0.17Ω
T3-T1 0.17Ω
o
R Ohm @ 25 C is calculated as
R25= (245.5+25)/(245.5+T) * Measured Value
Acceptance Criteria: +/- 6% as per FAT report

5.2. Motor Winding Insulation Resistance Test:

Name Company Signature Date


Tested by: YUGESH GE
Reviewed by :
Witnessed
by : Page 13 of 20
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909 POWER AND WATER UTIITY COMPANY for JUBAIL and

Test Template Name:


Motor and Its Feeder Testing
Ge26909-YGTG-Z-2-0158
Template No.:
Date: 13/01/2019, Revision: 0A
Date/ Revision No:

Equipment Location GTG-01 Equipment Name: COOLING WATER MODULE


Tag Number 88FC-1 Elementary Drawing No.:

Ambient Temperature: Humidity:


Test Voltage: 2500 V dc for 4.16KV Motor and 500V for LV motors
Measurement
Time Insulation Resistance in GΩ
L1-L2+L3+G L2-L1+L3+G L3-L1+L3+G
@Amb Corrected @Amb Corrected @Amb Corrected
o o
@40 C @40 C @40o C
Temp Temp Temp
1min 6.50 7.05 6.02
Legends: PI=Polarization Index (For motors above 200HP), AR=Absorption Ratio (For
Motors 2000HP and less)
Accepted Criteria: R1minute > 100 M Ω @ 40oC or = kV+1 whereas kV is rated
voltage of the winding in kilovolts
Minimum Value for PI as per IEEE43 is
Thermal Class Rating Minimum P.I.
Class A 1.5
Class B , Class F & Class H 2
Note:
if the 1 min insulation resistance is above 5000 MΩ, the calculated P.I. may not be meani
ngful. In such cases, the P.I. may be disregarded.

5.3. Testing of RTD’s:


RTDs Type:
Measurement

Name Company Signature Date


Tested by: YUGESH GE
Reviewed by :
Witnessed
by : Page 14 of 20
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909 POWER AND WATER UTIITY COMPANY for JUBAIL and

Test Template Name:


Motor and Its Feeder Testing
Ge26909-YGTG-Z-2-0158
Template No.:
Date: 13/01/2019, Revision: 0A
Date/ Revision No:

Equipment Location GTG-01 Equipment Name: COOLING WATER MODULE


Tag Number 88FC-1 Elementary Drawing No.:

RDs Measured Equivalent RDs Measured Equivalent


No Resistance Temp No Resistance Temp

6. Hot Checks on Motors


6.1. Electrical Protection Devices:
Type of MCB
Magnetic Setting, I>> Thermal
Setting
Over Load Setting
Range Setting
6.2. Phase Rotation/Direction test according to Mechanical requirement:
Motor:
Sl.N Description Checks
o.
1 Carried with driven machine.
2 Without drive machine
3 Connection of Cable
i.L1L2L3 - UVW
ii.L1L3L2 - UWV
4 Direction (View from driven machine to
motor)
Clockwise
Counterclockwise

Name Company Signature Date


Tested by: YUGESH GE
Reviewed by :
Witnessed
by : Page 15 of 20
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909 POWER AND WATER UTIITY COMPANY for JUBAIL and

Test Template Name:


Motor and Its Feeder Testing
Ge26909-YGTG-Z-2-0158
Template No.:
Date: 13/01/2019, Revision: 0A
Date/ Revision No:

Equipment Location GTG-01 Equipment Name: COOLING WATER MODULE


Tag Number 88FC-1 Elementary Drawing No.:

Cable at Feeder:
Sl.No. Description Checks
1 Connection of cable L1L2L3 - UVW
2 Phase rotation Clockwise
6.3. Check of drive/control interface with Mark VI/DCS:

Sl.No. Description Checks


1 Commands
2 Check back signals from plant
3 Fault Alarms
6.4. Commissioning of Motor Space Heater:
Rating
Voltage (V) Power (W)
Power Supply
Voltage (V) Current (A)

6.5. Heat Run Test (Uncoupled):


Note: Not required if Pump is directly Coupled. Jump to Coupled test.

6.5.1. Voltage and Current Measurement:


Time Motor in rush Current (A)
L1 L2 L3
Initial Motor Running Current (A)
L1 L2 L3
Measured Voltage (V)

Name Company Signature Date


Tested by: YUGESH GE
Reviewed by :
Witnessed
by : Page 16 of 20
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909 POWER AND WATER UTIITY COMPANY for JUBAIL and

Test Template Name:


Motor and Its Feeder Testing
Ge26909-YGTG-Z-2-0158
Template No.:
Date: 13/01/2019, Revision: 0A
Date/ Revision No:

Equipment Location GTG-01 Equipment Name: COOLING WATER MODULE


Tag Number 88FC-1 Elementary Drawing No.:

L1- L2- L3-


L2 L3 L1
Motor Running Current (A)
L1 L2 L3
15
Measured Voltage (V)
Minutes
L1- L2- L3-
L2 L3 L1
Motor Running Current (A)
L1 L2 L3
30
Measured Voltage (V)
Minutes
L1- L2- L3-
L2 L3 L1
Motor Running Current (A)
L1 L2 L3
45
Measured Voltage (V)
Minutes
L1- L2- L3-
L2 L3 L1
Motor Running Current (A)
L1 L2 L3
60
Measured Voltage (V)
Minutes
L1- L2- L3-
L2 L3 L1

Name Company Signature Date


Tested by: YUGESH GE
Reviewed by :
Witnessed
by : Page 17 of 20
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909 POWER AND WATER UTIITY COMPANY for JUBAIL and

Test Template Name:


Motor and Its Feeder Testing
Ge26909-YGTG-Z-2-0158
Template No.:
Date: 13/01/2019, Revision: 0A
Date/ Revision No:

Equipment Location GTG-01 Equipment Name: COOLING WATER MODULE


Tag Number 88FC-1 Elementary Drawing No.:

6.5.2. Mechanical Measurement:

Bearing Speed Vibration


Temperature:
Temperature in deg Rev min-1 Over all Velocity Acceleratio Displacemen
C Vibration n t

Time DE NE

15mi
30mi
45mi
60mi
Resul

6.6. Pump Commissioning (Coupled):


6.6.1. Voltage and Current Measurement:
N Motor in rush Current (A)
L1 L2 L3
Initial Motor Running Current (A)

Name Company Signature Date


Tested by: YUGESH GE
Reviewed by :
Witnessed
by : Page 18 of 20
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909 POWER AND WATER UTIITY COMPANY for JUBAIL and

Test Template Name:


Motor and Its Feeder Testing
Ge26909-YGTG-Z-2-0158
Template No.:
Date: 13/01/2019, Revision: 0A
Date/ Revision No:

Equipment Location GTG-01 Equipment Name: COOLING WATER MODULE


Tag Number 88FC-1 Elementary Drawing No.:

L1 L2 L3
Measured Voltage (V)
L1- L2- L3-
L2 L3 L1
Motor Running Current (A)
L1 L2 L3
15
Measured Voltage (V)
Minutes
L1- L2- L3-
L2 L3 L1
Motor Running Current (A)
L1 L2 L3
30
Measured Voltage (V)
Minutes
L1- L2- L3-
L2 L3 L1
Motor Running Current (A)
L1 L2 L3
45
Measured Voltage (V)
Minutes
L1- L2- L3-
L2 L3 L1
Motor Running Current (A)
L1 L2 L3
60
Measured Voltage (V)
Minutes
L1- L2- L3-
L2 L3 L1

6.6.2. Mechanical Measurement:

Name Company Signature Date


Tested by: YUGESH GE
Reviewed by :
Witnessed
by : Page 19 of 20
Marafiq GTG Rehabilitation
Project GE POWER SYSTEMS
Contract P.O. No.
7200026909 POWER AND WATER UTIITY COMPANY for JUBAIL and

Test Template Name:


Motor and Its Feeder Testing
Ge26909-YGTG-Z-2-0158
Template No.:
Date: 13/01/2019, Revision: 0A
Date/ Revision No:

Equipment Location GTG-01 Equipment Name: COOLING WATER MODULE


Tag Number 88FC-1 Elementary Drawing No.:

Bearing Speed Vibration


Temperature:
Temperature in deg Rev min-1 Over all Velocity Acceleratio Displacemen
C Vibration n t

Time DE NE

15mi
n
30mi
n
45mi
n
60mi
n
Resul
ts

Test Equipment Model Cal due date Test Equipment Model Cal due
date

Name Company Signature Date


Tested by: YUGESH GE
Reviewed by :
Witnessed
by : Page 20 of 20