Thanh Long Group is Vietnam private company founded in 1995.
Our main business is the fabrication of steel structure for use in:
● Towers
● Bridges
● Industrial plants
Since the establishment of the company, we have successfully completed many national projects in Vietnam and
oversea. We are now one of the leading steel fabricator’s in Vietnam.
General Information
Company Name Thanh Long Joint Stock Company
Factory Hung Yen Factory: Thanh Long Industrial Conjugate Zone, Dinh Du
Commune, Van Lam District, Hung Yen Province
Ho Chi Minh Factory (TL Vineco): Hiep Phuoc Industrial Zone, Hiep Phuoc
Commune, Nha Be District, Ho Chi Minh City
Office 194 Tran Quang Khai, Hoan Kiem District, Hanoi, Vietnam
Chairman Vu Thanh Long
General Director Tran Thi Thu Hien
Deputy General Director Phạm Minh Tuan
Pham Van Hai
Hoang Viet Binh
Established September 9th 1995
Stated Capital 980,000,000,000 VND
Revenue 2015 965,038,000,000 VND
Number of Employees Approximately 700 personnel
Production Capacity (Steel Tower Factory) 25,000T/year
(Plant Steel Structure / Steel Bridge Factory) 15,000T/year
Business Lines - Steel Fabrication (Steel Tower, Steel Bridge, Plant Steel Structure & others)
- Coating of steel products (Galvanizing & Painting)
- Transportation (Domestic & Oversea) and Erection
- Trading iron and steel, nonferrous metals and metallic materials
- Warehouse and storage of goods
- Consulting services in real estate
Subsidiary Thanh Long Steel Co., Ltd.
Thanh Long Structure Steel Co., Ltd.
Thanh Long Vineco Steel Structure Joint Stock Company
1|P a g e
Brief History
Experienced over 20 years of operation, Thanh Long Group fabricated steel structure products with higher
technological requirements in the field of construction, transportation, power and others.
1995 Thanh Long Productions and Trading Company was founded.
2002 Thanh Long Production and Trading Company became joint stock company.
2003 Established Thanh Long Steel Company Limited as subsidiary.
2007 Established Thanh Long Steel Structure Manufacturing Co., Ltd as subsidiary.
2009 Established Thanh Long Vineco Steel Structures Joint Stock Company as subsidiary.
2012 Annual production of transmission towers recorded over 22,000T / year.
2013 Completed 3 flyover bridge project located in HCMC and Hanoi
2014 New factory started operation for steel bridge and steel structure fabrication in Hung Yen.
2015 Completed exporting project (Plant steel structure to Panama, Steel towers to Pakistan)
2015~16 Completed TB1 power plant project (Turbine House, Conveyor & etc. – 6,000T)
2016 Increase stated capital to 980 billion VND and renamed Thanh Long Group., JSC
2017 Completed steel girder fabrication for cable stayed bridge (Vam Cong Bridge – 6,782T).
Completed DH3E power plant project (5,226T).
Organization
Chairman:
The board of Management Vu Thanh Long
Factory Factory
Manager Manager
Human resources
Technical Engineers:
Around 140 engineers of mechanic,
electronic, structure, welding, civil
engineering graduated from domestic or
overseas. All of those are experienced in
design, production and quality control for
domestic & international projects. We
employ Japanese and European Engineers
and also international qualification holders.
Manufacturing workers:
Around 400 workers for steel fabrication.
70% of workers are qualified technician,
such as welders, fitters, painters graduated
from technical school and mechanic
colleges.
2|P a g e
Safety Policy
We always handle many type of steel structures including super heavy products over 40 tons and bulky products
over 25m length. Working in such environment, we always give top priority to labor safety.
Our safety organization consists of all managers and foremen as chart below.
Safety Organization
① Regular safety meeting for all processes to predict the possible accidents and making safety plan.
③ Regular safety patrol by all members of safety and health committee and check throughout factory.
⑤ Assignment of qualified workers who have enough knowledge and awareness about safety.
⑥ Safety and health training program to improve knowledge and awareness about safety.
Qualify Policy
Thanh Long group organizes internal quality management system at every single stage of the manufacturing
processes to provide our products according to international standards and customer’s requirement.
We have independent Quality Assurance / Quality Control departments per factory as follows.
- Steel tower factory: We have continuously satisfied our customers’ quality requirements and kept the
position as largest transmission tower supplier in Vietnam in more than 5 years.
- Steel structure / bridge factory: We employed Japanese engineers and developed our internal quality
management system with the 5S of Kaizen ideology in mind.
3|P a g e
Certificates
With the direction and spirit of constant learning & improving the quality management, Thanh Long Group was
certified by organization International BVQA complying with the requirements of the quality management system
ISO 9001: 2008 on August 22, 2014 and environmental management system ISO 14001: 2015 on August 8, 2016
4|P a g e
Partners and Clients
Vietnam
Japan
Korea
Others
5|P a g e
Steel Tower
Steel Towers
Steel Tower Factory at Hung Yen Steel Tower Factory at Ho Chi Minh (TL Vineco)
Transmission Tower
6|P a g e
Antenna Tower
Trial Assembly
Mass Production
7|P a g e
Angle process Plate Process
CNC Angle Punching / CNC Plate Gas Cutting /
Shearing Shearing
↓
Plate Punching / Drilling
↓
Inspection / Sorting Plate Bending
↓
Galvanizing
↓
Sorting / Packing
↓
Loading
8|P a g e
Steel Bridges / Plant Structures
Our engineering and fabrication technology are developed by foreign companies such as Kawada Industries, leading steel
fabricator in Japan.
After opening modern factory in the end of 2014 in Hung Yen, Thanh Long Group have successfully completed the first
power plant project (Thai Binh 1 TPP) in 2015. Our high-quality steel structure products were highly esteemed by TB1
project owner and leaded to our successive power plant projects, such as Duyen Hai 3 and Vinh Tan 4 Extension Thermal
power plant in 2017.
Our monthly production marked around 1,500T/month in the first half of 2017.
9|P a g e
Structure Workshop (PTC) 1 at Hung Yen Structure Workshop (PTC) 3 at Hung Yen
Maximum Product Weight: 40Ton Maximum Product Weight: 30T
10 | P a g e
Cable Stayed Bridge
11 | P a g e
Power Plant Steel Structures
12 | P a g e
Production Flow Chart
↓ ↓
Shape (H-Beam / Channel) process BH Process
H-Beam / Channel Drill Gantry CNC Plate Drill
↓ ↓
Bandsaw Cutting Oxy-Gas Cutting
↓ ↓
Assembly Buit-up Fit-up (By Machine)
↓ ↓
CNC Plate Drilling Built-up Welding (SAW)
↓
Plate Beveling
↓
Built-up Reforming
↓
Grinding / Sorting
13 | P a g e
↓
Assembly (Fit-up / Welding / Finishing)
↓
Blasting
↓
Painting
↓
Packing / Loading
14 | P a g e
Galvanizing, Painting & Shop Drawing
Galvanizing
Thanh Long Group owned hot-dipped galvanizing line in Hung Yen factory
with the annual galvanizing capacity of 16,000 tons.
We are providing galvanizing services for a large number of clients in
Northern Vietnam.
Flow Chart
↓
Drying
15 | P a g e
↓
Hot Dip Galvanizing
Painting
(Blasting)
2 manual blasting houses and total capacities of blasting -
1,000m2/day (40T-60T/day).
(Painting)
Inhouse Painting Area: 3,000m2 (600m2/day)
Outside Painting Area: 5,000m2 (1,000m2/day)
16 | P a g e
Painting Flow Chart (General Steel Structure)
↓
Primer / Thickness Inspection
↓
2nd~Final Coating
↓
Final Inspection
17 | P a g e
Shop Drawing
(Steel structure)
We have official license of Tekla, major 3D design software for industrial
plant structure and provide engineering service as follows.
- Material Take Off
- Shop Drawing (Assembly Drawing / Part Drawing / Erection
Drawing)
- Cutting Plan (Shape profile / Plate)
(Steel bridge)
We employ Japanese bridge engineer who was engineering manager at Japan bridge fabricator and provide professional
service of bridge engineering.
18 | P a g e
Shop Drawing Flow Chart
(Steel Structure) Modeling
↓
Assembly Drwaing
↓
Part Drawing
↓
Cutting Plan
19 | P a g e
Hung Yen Factory
Layout
20 | P a g e
PTC Work Shop 3 New Galvanizing Shop (Under Construction)
Inside Area: 1,512m2 Inside Area 2,400m2
Overhead Crane x 15T x 2 Overhead Crane x 5T x 4
Built-up Beam Line (Height < 1250mm) – Capacity: 500 ton / month
CNC Multi toches Gas Max Thickness of Plate: 100mm
Cutting Machine (Flame Number of Gas Torches: 6 pcs
Planner) / Auto-Gas Cutting
H-650HD
- Maximum Beam Size:
- H650mm x 400mm x 12,000mm
- Amada, Japan
H Beam Beveling Machine AS-35TW
- Max Size: H912x600
- Beveling Cutter: R45-22, 30mm
- Scalloping Cutter: R35 + R10
Hataly, Japan
22 | P a g e
Manual Blasting Room 2 - Room Size: (L)20m x (W)15m x
(H)6m
- Blast Speed: 20-30m2/hour x 4
nozzles
- Spot Abrasive Collector System
CNC BL 2020
- Max Size: L200x20
- Capacity: 9 Ton / shift (7 hours)
CNC BL 2532
- Max Size: L250 x 32
- Capacity: 4 Ton / shift (7 hours)
CNC KB20-13
- Max Size: L170 x 12mm
- Capacity: 3 Ton / shift (7 hours)
Made in Germany
23 | P a g e
Plate Cutting / Punching / Drilling – 2,000~3,000T/year
Plate Punching / Drilling Machine CNC Z153
- Punching & Drilling Function
- Max Plate Size: 1,000mm x
500mm
- FIN, China
24 | P a g e
Ho Chi Minh Factory
Layout
25 | P a g e
Main Machine / Equipment
CNC VP164
1 set
Max Size: L160 x 16mm
Capacity: 8 ton / shift (7 hours)
Made in France
26 | P a g e
Hanoi office
Thanh Long Group Hanoi representative office is located on the 6th floor of the BIDV Tower at 194 Tran Quang
Khai, Hoan Kiem District, Hanoi.
Convenient access from the center of Hanoi city, a few minutes walking from Hoan Kiem lake.
Main functions of the office are marketing, business development and human resources.
27 | P a g e
Project - Steel Bridges
28 | P a g e
2015 Suspension bridges
The traffic safety and welfare for 28 mountainous provinces
Location: In the north midlands, Central and Tay Nguyen
Scope: Fabrication / Erectionc
29 | P a g e
2013 Hoang Van Thu – Truong Son – Cong Hoa (Lang Cha Ca) Flyover Bridge
Client: Department of Transportation Ho Chi Minh
Location: Ho Chi Minh City
Scope: Fabrication / Erection (500T)
30 | P a g e
Steel Tower
31 | P a g e
2014: 500kV Pleiku - My Phuoc - Cau Bong transmission line
Client: Central Vietnam Power Projects Management Board
Scope: Fabrication (6,340T)
2011: 220kV Dak Nong - Phuoc Long - Binh Long transmission line
Client: Central Vietnam Power Projects Management Board
Scope: Fabrication (10,784T)
32 | P a g e
2011: 220 kv Thanh Hóa – Vinh transmission line
Client: Central Vietnam Power Projects Management Board
Scope: Fabrication 4.979T)
33 | P a g e
Industrial Plants
2016 Thai Binh 1 Thernal Power Plant ESP Duct / Supporting Structure
Client: Narime
Scope: Fabrication (750T)
34 | P a g e
2015 Thai Binh 1 Thernal Power Plant Coal Conveyor
Client: JAT, Taiwan
Scope: Fabrication (1200T)
2015 Thermal Power Plant Fly Ash Silo steel structure (Paco), Exporting to Panama
Client: DongYang, Korea
Scope: Fabrication (172T)
2015 Thai Binh 1 Thernal Power Plant Central Control Buildings / Steam Turbine Generator House
Client: TOA Corporation, Japan
Scope: Fabrication (3,000T)
35 | P a g e