DESIGN REVIEW MEETING #1 YOGYAKARTA

No:MOM23032018 Dated : April 12, 2018


Letter : MOM23032018 Date : April 12, 2018 Received Dated : April 12, 2018

REVIEW FOR APPROVAL DRAWINGS/DOCUMENTS CCR OUT DATE


April 12, 2018
DRAWING/DOCUMENT NUMBER
DRAWING/DOCUMENT TITLE
No. PLN REV CONTRACTOR REV STATUS
DATASHEET FOR UNIT
1. E-09-AQ 1 T3139-DOB-ENG-ELE-EVD-S620 1 C
METERING&PROTECTION RELAY

Comm’t Comm’t
PLN’S COMMENTS CONTRACTOR’S RESPONSE
No. No.
General Comments

G1 Please provide PLN document number as previous Comment Sheet Rev 0.

Please clarify Nominal Operation Voltage Digital Input for each unit metering &
G2
protection relay

Please indicate the fuction of each digital unit metering & protection relay (ION8650,
G3
Power Logic PM8240, VAMP57, MICOMP642) on column remark.

G4 Please provide data sheet protection relay for LV MCCs & Engine Generator

G5 Please provide 110VDC/220VDC auxiliary voltage for protection relay and metering

Please provide two tariff metering (main and backup) for each generator transformer
G6
group refer to contract document section 4.6.16.

Reviewed by : Checked by :

-1/2-
PT PLN (Persero) PusatEnjiniringKetenagalistrikan
PLTMG NAMLEA 10 MW
DESIGN REVIEW MEETING #1 YOGYAKARTA
No:MOM23032018 Dated : April 12, 2018
Letter : MOM23032018 Date : April 12, 2018 Received Dated : April 12, 2018

Comm’t Comm’t
PLN’S COMMENTS CONTRACTOR’S RESPONSE
No. No.

G7 Please clarify memory backup for tariff metering

G8 Please attach calibration certificate for tariff metering

Reviewed by : Checked by :

-2/2-
PT PLN (Persero) PusatEnjiniringKetenagalistrikan
PLTMG NAMLEA 10 MW