Daily Drilling Report (28hrs)

Report Date: 6/13/2019


Well Name: HERUNEFER W-13 Report #: 34, DOL: 33.73, DFS: 27.00
Drilling Summary Rig Name KB-Grd (ft)
End Depth (ftKB) Depth Progress (ft) Avg ROP (ft/hr) Avg Background Gas (Units) EDC 58 30.0
14,850 Spud Date Target Depth (ftKB)

LAST WELLBORE SECTION 5/18/2019 15,000


Wellbore Label Section Description Size (in) Drilling Supervisors
Original Hole Prod Lnr 1 8 1/2 Job Contact
Last Formation Abdel kawy Zidan
Formation Name Drilling Top MD (ftKB) Prog Top MD (ftKB)
khaled abd El-naser
L.Safa 14,025 14,027.0
OPERATION SUMMARY Mohamed Maher Mostafa
Mohamed Mousa
24 Hour Summary: SLB E/L FIN'd RECORDED PRESS. POINTS
M/U & RIH W/ 8 1/2" SHORT STABILIZED BHA AS COND. TRIP FOR 7" LINER T/ 8550'. Ashraf Adel Shawky Helal
24 Hour Forecast: RIH W/ 8 1/2" SHORT STABILIZED ASSY. AS CONDITION TRIP FOR 7" LINER T/ BTM @ 14850', mohamed mahmoud reda
SWEEP & CIRC. BTM UP TIL SHAKER CLEAN, FLOW CHECK & POOH W/ 8 1/2" SHORT
Cost Summary
STABILIZED COND. TRIP ASSY. FOR 7" LINER
Day Total (Cost) Cum To Date (Cost)
$24,444 $1,760,675
--------------------------------------------------------------
Total AFE (Cost) Var (AFE-Fld) (Cost)
ACTUAL / PROPOSED : 27 / 40 DAYS. $2,962,213 $1,177,094
-------------------------------------------------------------- Daily Mud Cost (C… Mud Additive Cost t…
Current Status: RIH W/ 8 1/2" SHORT STABILIZED BHA AS COND. TRIP FOR 7" LINER $439.92 $247,604
24 Hour Operation Summary
Start End
Daily Time Log Summary
Start End Depth Depth Code 2 Dur (hr)
Time Time Dur (hr) Time Code NPT (ftKB) (ftKB) Operation Details Circulating 0.50
00:00 04:00 4.00 WL Logs 14,850 14,850 H.P.J.S.M, SLB E/L M/U & RIH W/ 2nd RUN PRESS. PT's (XPT- PU/LD BHA 0.50
GR)
Safety Mtg 0.50
** MAX. TOOL STRG. OD : 5.43"
** TOOL STRG. LENGTH : 32' TIH 6.00
** TOOL WT IN AIR: 543 LB's. WL Logs 16.50
** WT. OF TOOL STRG. @ 14300' : 4400 LB'S
** MAX. D.H.S. T RECORDED 2ND RUN : 290 DEG. F@ 14300' Casing Strings
** STATIC LOSSES : .1 BPH OD (in) Set Depth (ftKB)
** TIME SINCE LAST CIRC. : 26 HR's 20 40.00
** RECORDED 5/36 POINT's: HAD 3 NORMAL TEST & 2 TIGHT. OD (in) Set Depth (ftKB)
13 3/8 2,660.00
04:00 16:30 12.50 WL Logs 14,850 14,850 SLB E/L FIN'd RECORDED 36 PRESS. PT's (XPT-GR) OD (in) Set Depth (ftKB)
** RECORDED 36 POINT's: HAD 19 NORMAL TEST, 9 TIGHT, 4 9 5/8 8,590.00
DRY, 3 NO SEAL, 1 SUPER CHARGED
Weight Indicator Readings
** STATIC LOSSES : .2 BPH
Pick-Up String Weight (1000lbf)
** TIME SINCE LAST CIRC. : 38.5 HR's 395
16:30 17:00 0.50 Safety 14,850 14,850 H.P.J.S.M, DISCUSSED BHA M/U PLAN, RISKS & ACCIDENTS Slack-Off String Weight (1000lbf)
Mtg PREVENTIVE ACTION. 365
17:00 17:30 0.50 PU/LD 14,850 14,850 L/D EXCESS 3 STD's X 6 1/2" D/C's FROM DRK. Off-Bottom String Weight (1000lbf)
BHA
17:30 23:30 6.00 TIH 14,850 14,850 P/U, M/U & RIH W/ 8 1/2" SHORT STAB. ASSY. AS CONDITION Leak Off Test and FIT
TRIP FOR 7" LINER T/ 8550'. Test Type
>> BIT DATA: RR, HALL., MM74DH, S/N: 13063590 , OPEN JET. Formation Integrity
>> TRIP IN LOSSES: 4 BPH Depth (ftKB) EMW (lb/gal)
>> FILL STRG EVERY 20 STD's. 8,600 12.50
23:30 00:00 0.50 Circulati 14,850 14,850 CIRC. BTM's UP. Last BOP Check
ng >> HAD NO TRIP GAS. Date
>> DYNAMIC LOSSES : 4 BPH @ 450 GPM. (S.P.P: 1450 PSI) 5/30/2019
04:00 Update Rig Pumps
Start End Pump # Make Model
Start End Depth Depth 1 National 12-P-160
Time Time Dur (hr) Time Code NPT (ftKB) (ftKB) Operation Details
Oilwell
00:00 04:00 4.00 TIH 14,850 14,850 CONT. RIH W/ 8 1/2" SHORT STAB. ASSY. AS CONDITION TRIP Stroke (in) Liner ID Size (in) Eff (%)
FOR 7" LINER T/ 14000'. 12 5 1/2 98
>> TRIP IN LOSSES: 4 BPH. Pump # Make Model
>> HOLE IN GOOD CONDITION. 2 National 12-P-160
>> FILL STRG EVERY 15 STD's. Oilwell
Daily Drilling Parameters Stroke (in) Liner ID Size (in) Eff (%)
ROP 12 5 1/2 98
Start End Instan Surface Total Bit Slow Pump Rate
Param Depth Depth Int Depth Drill Time Int ROP taneo WOB RPM RPM Drill Tq Off Btm Q Flow SPP
(ftKB) (ftKB) us (rpm) (rpm) Depth Strokes
Subtype (ft) (hr) (ft/hr) (1000lbf) (kft•lb) Tq Tq Units (gpm) (psi) Diff (psi)
(ft/hr) Pump # (ftKB) (spm) P (psi)
0 2 30 300.0
14,840
1 14,840 30 300.0
2 14,840 40 425.0
1 14,840 40 425.0
2 14,840 50 550.0
1 14,840 50 550.0

Shaker Screens
Make Model Note
Swaco SHAKER 4 X 120 API
Make Model Note
Swaco SHAKER 4 X 170 API

www.apachecorp.com Page 1/3 Report Printed: 6/14/2019


Daily Drilling Report (28hrs)
Report Date: 6/13/2019
Well Name: HERUNEFER W-13 Report #: 34, DOL: 33.73, DFS: 27.00
MUD PROPERTIES Shaker Screens
Depth of Check: 14,850 ftKB Date of Check: 6/13/2019 00:00 Make Model Note
Mud Company Fluid Category Density (lb/gal) Vis (s/qt) PV OR (cP) YP OR (lbf/10… Gel (10s) (lbf/… Gel (10m) (lbf… T Flowline (°F) Swaco SHAKER 4 X 170 API
Baroid Drilling Fluids KCl / Polymer 10.50 56 26.0 28.0 7 12 150.0 Make Model Note
Filtrate (mL/3… HTHP Filtrate… FC (1/32") Percent Oil (%) H20 (%) Oil Water Ratio MBT (lb/bbl) pH Elec Stab (V) Lime (lb/bbl) Swaco MUD CLE… 4 X 200 API
3.6 11.8 1 7.5 9.2 Centrifuge Check
Solids (%) Corrected So… Sand (%) LGS (%) KCl (lb/bbl) Chlor (mg/L) Calcium (mg/L) Mg (mg/L) Pf (mL/mL) Mf (mL/mL)
Type Make
12.0 6.3 0.3 3.5 16.5 110,000 400 0.7 0.3
Chemical Concentration Feed Rate (gpm) RPM (rpm)
Comment
CHEMICAL CONC.: SOLTEX 6PPB, BARACARB 50:- 10PPB, KC%5, BAROFIBRE 2.0 PPB, STEEL SEAL 2PPB Dens OF (lb/gal) Dens UF (lb/gal)

** NEED CMT LAB TEST. Non Productive Time


Last Survey NPT Dur (Net) (hr)
MD (ftKB) Inclination (°) Azimuth (°) TVD (ftKB) VS (ft) Departure (ft) NS (ft) EW (ft) DLS (°/100ft)
14,589.0 2.94 238.95 14,583.8 20.4 106 68.3 81.4 1.20 Problem Type
MD (ftKB) Inclination (°) Azimuth (°) TVD (ftKB) VS (ft) Departure (ft) NS (ft) EW (ft) DLS (°/100ft)
14,684.0 3.01 252.83 14,678.7 20.8 102 66.3 76.9 0.76 Description
MD (ftKB) Inclination (°) Azimuth (°) TVD (ftKB) VS (ft) Departure (ft) NS (ft) EW (ft) DLS (°/100ft)
14,779.0 3.52 277.06 14,773.5 23.0 97 65.9 71.6 1.53 Start Date End Date
Bit & BHA Details
Bit Bit Model Bit SN Nozzles (1/32") Depth In… Depth O… Drilled (ft) Drill Time (hr) Avg RO… IADC Bit Dull Out Failed Item
6 MM74DH 13063590 13,886 14,850 30.1 -------
BHA # String Length (ft) Weight of String in Air (1000lbf) Comment Accountable Party
7 964 45 >> BHA WT. / B.JAR WT.: 48.0 / 11.0 KLB's
>> 6 -1/2'' D/C's FTG / HR's= 6265'/ 176HR's
Personnel Log
>> 5'' HWDP FTG / HR's (12 JT's / 9 JT's) = 14395'/6265' /
Sum of
260/176 HR's Company Count
>> 5'' D/P (S) FTG / HR's = 13520' / 248.5 HR's EDC 36
>> 6-1/2" JAR: 36.5 HR's
Khalda Petroleum 8
String Comp Dimension (Alt Format)
8 1/2 HDBS MM74DH, 6 1/2 Bit Sub w/Float, 6 1/2 Drill Collar, 8 3/8 Stabilizer - Spiral Blade, 3x6 1/2 Drill Collar, 6 1/2 Company
Jars - Drilling, 2x6 1/2 Drill Collar, 24x5 HWDP LIGABOY - Catering 12
BHA Component Hours BAROID 1
Drill Time Job Circ Time SPERRY SUN 2
Item Des Make Model SN Total # Runs (hr) Job (hr)
Baker Liner engineer 1
Jars - Drilling CW-1891517 1 0.00 0.00
Bit Hydraulics Total (Sum) 60
Bit Hydraulic Power (hp) HP/Area (hp/in²) Bit Jet Velocity (ft/s) Bit Pressure Drop (psi) % P @ bit (%)
Safety Incidents
Type Severity
Daily Mud Additives
Product Name Consumed Size Units Sum of Daily Field Est (Cost) Description
BARITE 4.0 1.5 tonne $439.92
Total (Sum) $439.92
Daily Costs
KPC
Code Description Item Description Field Est (Cost) Vendor
408 DRILLING CONTRACT Rig Daily Rate $17,500 EDC
404 FUEL, LUBRICANTS, POWER 2.05$/GAL $2,909 Misr Petroleum
430 COMPANY LABOR & $1,150 KPC
SUPERVISION (KHALDA
GROUP)
416 ACCOMMODATIONS & $650 *Unlisted Vendor
CATERING
408 DRILLING CONTRACT RIG SENSE+ $625 EDC
SOFTSPEED
412 MUD MATERIALS, CHEMICALS, BAROID-MUD $440 Baroid Drilling Fluids Inc.
COMPLETION FLUIDS,
ENGINEERING
425 MUD LOGGING $350
417 RENTAL EQUIPMENT JAR + S.STAB $350
434 WATER 2 DRILL WTR TRUCKS + $200 *Unlisted Vendor
POTABLE WTR
427 TRANSPORTATION $200 *Unlisted Vendor
442 COMMUNICATIONS $50 Alkan
431 CONTRACT LABOR $20
433 DIESEL USED FOR DRILLING DIESEL USED FOR MUD $0 Misr Petroleum
FLUIDS

Bulk Amounts
Unit
Supply Item Des Received Consumed Cum On Loc Label Note
Diesel, Rig Fuel 5,548 1,421 19,400 gal >>DIESEL STOCK ENOUGH FOR 5 DAYS,
Water, Surf-Fresh 200 200 800 bbl DRIVER : ALI MOHAMED - TRUCK NO. 3864/9134 -
TICKET NO. 11784

www.apachecorp.com Page 2/3 Report Printed: 6/14/2019


Daily Drilling Report (28hrs)
Report Date: 6/13/2019
Well Name: HERUNEFER W-13 Report #: 34, DOL: 33.73, DFS: 27.00
Bulk Amounts
Unit
Supply Item Des Received Consumed Cum On Loc Label Note
Water, Surf-Saline 800 800 1,000 bbl ABDELRAOF GABALLAH - TRUCK NO. 7911/22197 -
TICKET NO. 23461/23462 / ISLAM AHMED - TRUCK
NO. : 1749 - TICKET NO. 23459 /23460

www.apachecorp.com Page 3/3 Report Printed: 6/14/2019