Tuesday, May 14, 2019

QC's INSPECTION REPORT AT SHOP


3:17:44 PM

From 20-Apr-19 To 20-May-19

Project Name: PEKN RESIN MANUFACTURE FACTORY PLANT Project No.: VD-161
Vendor Name: NUI THANH CO., LTD. TVC Requisition No.: J2018-18/VD161-1000-R001
Vendor Location: Phu Thanh, Nhon Trach, Dong nai TVC PO No: VD161-1000-0000-001
Vendor Contact Person: Vu Duy Thuan. Mr TVC Inspector Name: Nguyen Van Thanh
Vendor Contact Email: duythuan09@gmail.com TVC Inspector Contact Emai thanh.nv@ttcl-vn.com

Equipment No. H-603 Material: SUS304 Test Pressure: FULL WATER


Equipment Type TANK Dimension (H x V x T): 800x1200x4T Delivery Date: 7/10/2019

Inspection Date Inspection Activities Detail Items Picture

15-May-19 EP, HT, BC, L, FU, II WC1,Nozzle N1, N2, Manhole M1

14-May-19 BC, AT, D, ATR WL1,WC1,Reinforcing

Equipment No. H-703 Material: SUS304 Test Pressure: FULL WATER


Equipment Type TANK Dimension (H x V x T): 800x1200x4T Delivery Date: 7/10/2019

Inspection Date Inspection Activities Detail Items Picture

14-May-19 LT, FiT, HaT, D, FD WB2

Equipment No. R-601 Material: SUS304 Test Pressure: 1 barg (3 barg)


Equipment Type REACTOR Dimension (H x V x T): 2900x4653x18T (2050x3859x10T) Delivery Date: 7/10/2019

Inspection Date Inspection Activities Detail Items Picture

14-May-19 MA, P, BC, HaT, RT, AT, PrT,


FD, RR, OT, PWHT, II

14-May-19 LT, MA, HT, D, FD, FU C2

14-May-19 LT, P, HaT, AT, FD, MM, MI, II N1,N2

14-May-19 LT, EP, HT, BC, L, FU Head1,2

Page 1 of 2
Equipment No. R-602 Material: SUS304 Test Pressure: 0.075 barg (3 barg)
Equipment Type REACTOR Dimension (H x V x T): 3200x5311x16T (3350x4160x10T) Delivery Date: 7/10/2019

Inspection Date Inspection Activities Detail Items Picture

14-May-19 AT

MM : MATERIAL MACHENICAL TEST EP : EDGE PREPARATION L : LINNING INSPECTION


MI : MATERIAL IDENTIFICAITON MA : ALLOY VERIFICATION AT : PNEUMATIC TEST
FU : FIT-UP CHECK UT : ULTRASONIC EXAMINATION SP : SHIPPING PREPARATION
MT : MAGNETIC PARTICLE EXAMINATION FiT : FREE IRON EXAMNINATION WM : MECHANICAL TEST FOR WQ AND WP
ATR : AIR TEST OF REINFORCING PAD HT : HYDROSTATIC TEST PrT : PRODUCTION TEST
PWHT : POST WELD HEAT TREATMENT P : PAINTING INSPECTION D : DIMENSION CHECK
II : INTERNAL INSTALLATION INSPECTION BC : BACK CHIPPING FD : FINAL DIMENSION CHECK
WQ : WELDING QUALIFIATION TEST HaT : HARDNESS TEST RR : REVIEW REPORT
WP : WELDER PERFORMANCE QUALIFICAITON RT : RADIOGRAPHIC EXAMINATION OT : OTHER
LT : LEAK TEST VT : VISUAL INSPECTION

Page 2 of 2