VIETNAM AIRLINES ENGINEERING COMPANY FORM 1002

WORK ORDER
VN 23515383 6 - Miscellaneous
Openned on Company Customer Reference
06-May-2019 VAECO VNA - VIETNAM AIRLINES B754\ADDB
Issued by ATA Station Zone Est. M/H Est. Downtime
DUCNH 47-10 30.00 12.00 Hours
A/C Reg. Part Number Serial Number Description
A870
Deadline FH CY Check Date
U
. REQUESTED WORK PERFORMED WORK MECH INSP
ADD B754 "STS MSG NITROGEN GENERATION SYS"
47-10020 -NGS Air Separation Module filter is clogged.
FIM: DMC-B787-A-47-00-F0-41A-421A-A
NOTE:
Troubleshooting history:
1. Replace the NGS air filter, ops TEST failed.
2. Replace the NGS ASM inlet pressure sensor, ops
TEST failed.
3. Replace the NGS flow/temperature sensor, ops TEST
failed.
4. Replace the NGS air separation module, ops TEST
failed
Continue to troubleshoot with
1) perform a leakage check of the NGS system per
AMM task DMC-B787-A-47-11-00-03B-364A-A
NOTE: should pay close attention to ducting of the NGS
heat exchanger. It is very difficult to locate the leaks
sometimes (due to the low flow through the NGS
System). It's important to check the entire system
thoroughly, we have had history of other operators
locating leaks in the MDC second stage compression
inlet and outlet ducts. In addition, check for leaks near
the LRUs that have been replaced. Considering the heat
exchanger was recently replaced then this area is a very
likely candidate
2) Inspection evidence of FOD within the air filter, we
would suggest performing a borescope inspection of the
ducting upstream of the filter head to verify it is FOD
free. If additional FOD is found the NGS assembly may
need to be disassembled for cleaning.
3) IF NIL Helf replace Motor Driven Compressor Ref
AMM DMC-B787-A-47-13-01-00A-520A (720A)-A
4) ) IF NIL Helf replace dual heat exchanger DMC-B787-
A-47-14-01-00B-520A (720A)-A
Reason for non-performance Confirmed by Manager

Date:............................ TLP:.......................... Maintenance Location:....................................................

Aditional Work/ Deferred Defect: Yes No Linked NRC/ ADD Number/ TLP:...........………………….

CERTIFIES THAT THE TASK/ INSPECTION HAS BEEN COMPLETED TO THE REQUIRED STANDARD AND
SUPPORTS THE FINAL MAINTENANCE RELEASE/ CERTIFICATE OF RELEASE TO SERVICE.
ISS.02, REV.08 - DATE: 10 JUL 2017 Printed on: 15:31:09 06-May-2019 PAGE 1 / 2
VIETNAM AIRLINES ENGINEERING COMPANY FORM 1002

WORK ORDER
VN 23515383 6 - Miscellaneous

Authorised staff’s signature: Stamp: Date (d/m/y):.........................

MATERIAL & TOOLS


Type Part Number Description Qty Unit
TO A20001-82 HOIST-BOOM, 400POUND MAX 1
TO K47001-116 SEPARATION 1
GR M0LYK0TE44 GREASE (MEDIUM)-100GR/TU 1
EP NK103511S0100 PACKING 1
EP NK103511S0125 PACKING 2
SE PS890B1-2 SEALANT-SEMKIT654 1
CO 69494J904 PACKING 2
PN 7012011H01 HEAT EXCHANGER - DUAL, NI 1
PN 7012030H08 COMPRESSOR, MOTOR DRIVEN 1

ACCESS PANELS
Access Description

QUALIFICATIONS
Code Description Qty
B1 CAT B1 CRS STAFF 1
MEC MECHANIC 2

REFERENCES
Type Protocol Reference Rev. Item Description

REMOVAL/ INSTALLATION
P/N OFF S/N OFF P/N ON S/N ON GRN

MANHOURS
Work Staff ID Name Hours Item Job date Hour type Remark

ISS.02, REV.08 - DATE: 10 JUL 2017 Printed on: 15:31:09 06-May-2019 PAGE 2 / 2