Providing pipe line for water supply with HDPE pipes as per IS 4984/1995 with its
ammedments and revisions thereon with supplyof pipes and trench excavation for earth
work excavation in all types of soils except hard rock which required partial blasting and
depositing on bank with initial lead of 10 mts and lift of 2mts laying of pipes carefully into
trench and laying in alingment and gradient jointing the pipeline with materials including
refilling the trench with excavated soils removal of surplus earth from the soil testing the
pipeline to hydraulic field test pressure including TOT charges but excluding CED, APGST
charges on pipes complete for finished item of work. (Trench size is 0.30x0.50 for 25mm
dia pipe,)
( HDPE - PE 63 grade)
E/W/E Rate - (9b+12b+13b)/3 = (27.00+29.00+30.00) / 3 = 28.67/1 cum
Cost of Materials
A Cost of pipes including all taxes 11.14
Total 23.56
DETAILED SUB ESTIMATE FOR CONSTRUCTION OF 2500 Ltrs GLSR
AT PS GOVIDPET (V) ARMOOR (M)
Sl. Description of work No L B D Qty Rate Per Amt.
No.
1 2 3 4 5 6 7 8 9 10
1 Earth work excavation and depositing on bank with intial
lead and lift in all soils including labour charges complete
for Pedastal
For Foundation 1Xll/4 2.00 2.00 0.90 2.83
For plat form 1Xll 2.80 1.20 0.15 1.58
4.41 Cum 46.50 1 Cum 205.00
VPNo.1&13 of MB No.143/2003/B
2 CC (1:5:10) mix using 40mm HBG MC metal including
cost and conveyance of all mateirals and labour charges
etc., complete for Foundation.
For Foundation 1Xll/4 2.00 2.00 0.30 0.94
For plat form 1Xll 2.80 1.20 0.15 1.58
2.52 Cum 1162.70 1 Cum 2935.31
VPNo.4&16 of MB No.143/2003/B
3 RR masonary in CM (1:6) prop using 2nd sort HG stone
inlcuding all material and labour charges etc., complete
For below GL 1Xll/4 1.80 1.80 0.60 1.53 Cum 1086.90 1 Cum 1658.65
VPNo.4 of MB No.143/2003/B
For in bottom slab 1Xll/4 1.60 1.60 0.10 0.20 Cum 2870.00 1 Cum 576.76
VPNo.10of MB No.143/2003/B
1 Sand for mortar 1 Cum vaagu 8 95.80 68.00 0.00 3.60 18.00 0.00 30.00 208.20
*NOTE* 1) The above quaries are nearer to site to the best of my knowledge.
2) The above leads are correct to the best of my knowledge.
3) The quaries requires full blasting.
AE/AEE