Basic Rates for Experts

Reference: Department of Roads

Wage Rate
Year Index % Increase
(May/June)
2067/68 2010/11 238.6
2068/69 2011/12 290.7 21.83
2069/70 2012/13 317.1 9.08
2070/71 2013/14 356.9 12.55
2071/72 2014/15 383.6 7.48
2072/73 2015/16 406.6 5.99
2073/74 2016/17 464 14.11
2074/75 2017/18 489.6 5.51

Rate as per NRB wage Rate Index (WI) Rate as per NRB wage Rate Index (WI)
Approved Rate Approved Rate
Professional / Staff
for F/Y 2067/68 FY 2068/69 FY 2069/70 FY 2070/71 for F/Y 2071/72 FY 2072/73 FY 2073/74 FY 2074/75
21.83% 9.08% 12.55% 5.99 14.11 5.51
Highway, Transport, Bridge Engineer,
Structure Engineer, Procurument Specialist,
2800 3411.24 3720.98 4187.96 4180 4430.38 5055.51 5334.07
Civil Engineer/Office Engineer, Road Safety
Specialist
Engineering Geologist 2800 3411.24 3720.98 4187.96 4180 4430.38 5055.51 5334.07
Hydrologist 2800 3411.24 3720.98 4187.96 4180 4430.38 5055.51 5334.07
Environmental Engineer 2800 3411.24 3720.98 4187.96 4180 4430.38 5055.51 5334.07
Road/Highway Engineer 2800 3411.24 3720.98 4187.96 4180 4430.38 5055.51 5334.07
Economist 2000 2436.60 2657.84 2991.40 2990 3169.10 3616.26 3815.52

Social Development / Resettlement Specialist 2800 3411.24 3720.98 4187.96 4180 4430.38 5055.51 5334.07

Draft person / CAD Operator 900 1096.47 1196.03 1346.13 1340 1420.27 1620.67 1709.96
Support Staff / Chainman / Labours /
300 365.49 398.68 448.71 440 466.36 532.16 561.48
Runner / Peon / Helper
Environmentalist / Forestry Specialist /
Ecologist / Environmental Engineering (Team 3000 3654.90 3986.76 4487.10 4480 4748.35 5418.34 5716.90
Leader)
Socio - Economist 2000 2436.60 2657.84 2991.40 2990 3169.10 3616.26 3815.52

Technical Assiatance (Physio-Chemical) 1595 1943.19 2119.63 2385.64 2380 2522.56 2878.50 3037.10

Technical Assiatance (Biological) 1595 1943.19 2119.63 2385.64 2380 2522.56 2878.50 3037.10

Technical Assiatance (Social - Economic) 1595 1943.19 2119.63 2385.64 2380 2522.56 2878.50 3037.10

Account / Admin Staff 966 1176.88 1283.74 1444.85 1440 1526.26 1741.61 1837.57

Computer Operator 966 1176.88 1283.74 1444.85 1440 1526.26 1741.61 1837.57

Prepared By Checked By Approved By


Recommended
Rate for F/Y
2075/76

5334

5334
5334
5334
5334
3815

5334

1709

561

5716
3815

3037

3037

3037

1837

1837
Provincial Government
Ministry of Physical Infrastructure Development
Transport Infrastructure Directorate
Infrastructure Development Office
Morang, Province No.1
Rate Analysis For
Initial Environmental Examination (IEE) of Road (Unit = km for L > 10 km & calculation for 17 km road)
(FY: 2075/76)
md per km for 17 km
Desk Field Report Total without Rates /
S. N. Particulars Units Travel Time without without Total Manday
Study work Prepration travel time manday
travel time travel time
A Key Staff

Environmentalist / Forestry
a days 7 3 2 14 23 2.30 35.88 38.88 5716
Specialist / Ecologist (Team Leader)

b Highway / Transportation Engineer days 2 3 2 7 11 1.10 17.16 20.16 5334


Geologist /Geotechnical Engineer /
c days 2 3 2 4 8 0.80 12.48 15.48 5334
Eng. Geologist
d Hydrologist days 1 3 2 4 7 0.70 10.92 13.92 5334
e Socio - Economist days 2 3 2 7 11 1.10 17.16 20.16 3815
f Legal Expert days 2 2 0.20 3.12 3.12 3815
Sub-Total
B Supporting Staff
Technical Assistance (Physio -
a days 3 3 4 7 0.70 10.92 13.92 3037
Chemical)
b Technical Assistance (Biological) days 3 3 4 7 0.70 10.92 13.92 3037
Technical Assistance (Socio -
c days 3 3 4 7 0.70 10.92 13.92 3037
Economist)
d Account / admin staff days 1 4 5 0.50 7.80 7.80 1837
e Computer Operator days 2 5 7 0.70 10.92 10.92 1837
f Surveyor days 3 4 7 0.70 10.92 10.92 1837
g Support staff / helper days 2 12 14 28 2.80 43.68 43.68 561
Sub-Total
Total Cost of Manpower

C Transportation of personals LS 10 % of total cost of manpower


Tools & equipment for data
D LS 5 % of total cost of manpower
collection
E Stationary & logistic support LS 5 % of total cost of manpower
Grand Total
VAT @ 13 %
Grand Total with VAT
m road)

Amount (Rs) Remarks

222238.08

107533.44

82570.32

74249.28
76910.40
11902.80
575404.32

42275.04

42275.04

42275.04

14328.60
20060.04
20060.04
24504.48
205778.28
781182.60
78,118.26

39,059.13

39,059.13
937,419.12
121,864.49
1,059,283.61
Provincial Government
Ministry of Physical Infrastructure Development
Transport Infrastructure Directorate
Infrastructure Development Office
Morang, Province No.1
Rate Analysis For
Initial Environmental Examination (IEE) of Road (Unit = km for L > 10 km & calculation for 19 km road)
(FY: 2075/76)
md per km for 19 km
Desk Field Report Total without Rates /
S. N. Particulars Units Travel Time without without Total Manday
Study work Prepration travel time manday
travel time travel time
A Key Staff

Environmentalist / Forestry
a days 7 3 2 14 23 2.30 39.56 42.56 5716
Specialist / Ecologist (Team Leader)

b Highway / Transportation Engineer days 2 3 2 7 11 1.10 18.92 21.92 5334


Geologist /Geotechnical Engineer /
c days 2 3 2 4 8 0.80 13.76 16.76 5334
Eng. Geologist
d Hydrologist days 1 3 2 4 7 0.70 12.04 15.04 5334
e Socio - Economist days 2 3 2 7 11 1.10 18.92 21.92 3815
f Legal Expert days 2 2 0.20 3.44 3.44 3815
Sub-Total
B Supporting Staff
Technical Assistance (Physio -
a days 3 3 4 7 0.70 12.04 15.04 3037
Chemical)
b Technical Assistance (Biological) days 3 3 4 7 0.70 12.04 15.04 3037
Technical Assistance (Socio -
c days 3 3 4 7 0.70 12.04 15.04 3037
Economist)
d Account / admin staff days 1 4 5 0.50 8.60 8.60 1837
e Computer Operator days 2 5 7 0.70 12.04 12.04 1837
f Surveyor days 3 4 7 0.70 12.04 12.04 1837
g Support staff / helper days 2 12 14 28 2.80 48.16 48.16 561
Sub-Total
Total Cost of Manpower

C Transportation of personals LS 10 % of total cost of manpower


Tools & equipment for data
D LS 5 % of total cost of manpower
collection
E Stationary & logistic support LS 5 % of total cost of manpower
Grand Total
VAT @ 13 %
Grand Total with VAT
m road)

Amount (Rs) Remarks

243272.96

116921.28

89397.84

80223.36
83624.80
13123.60
626563.84

45676.48

45676.48

45676.48

15798.20
22117.48
22117.48
27017.76
224080.36
850644.20
85,064.42

42,532.21

42,532.21
1,020,773.04
132,700.50
1,153,473.54