INCINERATOR COST

COMPONENT QUANTITY COST


FIXED COST
Incinerator land - RM 1, 230 000.00
Incinerator equipment and - RM 71, 700 000.00
technology
Incinerator construction and - RM 30, 100 000.00
installation cost
COLLECTION COST
Transportation 10 lorry RM 140 000 per lorry
FUEL COST
Diesel RM 1.90 per liter
Propane RM 2.04 per galloon
Natural gas RM 27.05 per MMBtu
OPERATIONAL COST
Electric 80 MW per day RM 35.50/kW
Chemical materials RM 1 200 000.00 per annum
MAINTANENCE COST
Office maintenance RM 50 000.00 per annum
Equipment maintenance RM 1, 500 000.00 per annum
LABOR COST
Project Manager 1 RM 10 000 per month
Engineer 4 RM 7000 per month
Technical 20 RM 2000 per month
Non-Technical 8 RM 1800 per month

Total Cost :