0 evaluări0% au considerat acest document util (0 voturi)
48 vizualizări1 pagină
This document outlines the costs associated with building and operating an incinerator, including fixed costs of land, equipment, and construction totaling over RM102 million. Operational costs include transportation of 10 lorries at RM140,000 each, fuel costs of diesel, propane and natural gas, electricity costs of RM35.50 per kW, and annual maintenance and labor expenses. The total cost of building and running the incinerator is over RM102 million.
This document outlines the costs associated with building and operating an incinerator, including fixed costs of land, equipment, and construction totaling over RM102 million. Operational costs include transportation of 10 lorries at RM140,000 each, fuel costs of diesel, propane and natural gas, electricity costs of RM35.50 per kW, and annual maintenance and labor expenses. The total cost of building and running the incinerator is over RM102 million.
This document outlines the costs associated with building and operating an incinerator, including fixed costs of land, equipment, and construction totaling over RM102 million. Operational costs include transportation of 10 lorries at RM140,000 each, fuel costs of diesel, propane and natural gas, electricity costs of RM35.50 per kW, and annual maintenance and labor expenses. The total cost of building and running the incinerator is over RM102 million.