OWNED
LAND
2 AMOUNT IN LACS
PARTICULARS
.00
LAND DEVELOPMENT
2000.02
CIVIL WORKS
5781.00
PLANT AND MACHINERY
880.00
MISCELLANEOUS FIXED ASSETS
PRELIMINARY AND PRE OPERATIVE 558.00
EXPENSES
259.83
PROVISION FOR CONTINGENCIES
9478.85
TOTAL COST OF FIXED ASSETS
MEANS OF FINANCE
9478.85
TERM LOAN
2369.71
PROMOTER CONTRIBUTION @25%
7109.13
TERM LOAN FROM BANK @75%
1300.00
WORKING CAPITAL REQUIREMENT
390.00
PROMOTER CONTRIBUTION @30%
910.00
WORKING CAPITAL LOAN @70%
10778.85
TOTAL COST OF PROJECT
8
MANPOWER
132
POWER REQUIREMENT IN HP.
36%
BEP IN %AGE
4.65
DSCR
S.NO PARTICULARS
1 LAND
TOTAL
AMOUNT IN LACS
0
CIVIL WORKS
DIMENSIONS IN FEET
S.NO PARTICULARS
L B H
5 ADMINISTRATIVE OFFICE 12 10 10
9 SEPTIC TANK 8 7 6
10 SOAKAGE PIT 6 8 14
56 350 19.60
48 375 18.00
4666 1960.80
39.22
2000.02
S.NO DESCRIPTION QUANTITY PRICE
TOTAL
GST @18%
TOTAL AMOUNT
AMOUNT
(LACS) GST= 18%
450.00
410.00
500.00
1040.00
150.00
840.00
300.00
600.00
110.00
300.00
4700.00
846.00
235.00
5781.00
PROPOSED MISC. FIXED ASSETS
TOTAL AMOUNT
SETS
RATE AMOUNT(LACS)
70.00 70.00
20.00 20.00
420.00 420.00
250.00 250.00
90.00 90.00
30.00 30.00
880.00
S.NO PARTICULARS
Registration Fee , Pollution Fee, Electrical Fee, Municipal Fee, and Various
1
Other NOC,s With Various Departments if any
TOTAL AMOUNT
AMOUNT( LACS)
EXPENSES
30.00
10.00
EXPENSES
10.00
8.00
500.00
558.00
S.NO. PARTICULARS AMOUNT (LACS)
TOTAL 8661.02
CONTINGENCY @ 3% 259.83
CONTINGENCY
8.80; 10.16%
20.00; 23.09%
CIVIL WORKS
PLANT AND MACHINERY
MISC. FIXED ASSETS
57.81; 66.75%
S.NO PARTICULARS AMOUNT IN LACS
8.80
DEPRECIATION CALCULATION
D MACHINERY
D CIVIL WORKS
XED ASSETS
PET BOTTLES
LABEL
TAPE
PACKAGING
TOTAL AMOUNT
T 100% CAPACITY UTILIZATION
AMOUNT(LACS)
7420.00
2100.00
1277.50
1056.00
252.50
264.00
101.00
880.00
127.50
100.00
13578.50
SALES AND COST OF PRODUCTION PER MONTH
TOTAL AMOUNT
R MONTH
AMOUNT (LACS)
21120.00
SA LES
BY SALE OF 1000ML BOTTLES BY SALE OF 500 ML BOTTLES
5050.00
50.50
26170.00
211.20
ALE OF 500 ML BOTTLES
211.20
1 No. of working days per annum 300 days
2 No. of hours per day 8 hours
3 No. of shifts per day 1 shift
DESCRIPTION INSTALLED CAPACITY /ANNUM
1 Manufacturing of cardboards 1200/hour 9600per day
2880000
Annual Purchases 13578.50
Annual Sales 26170.00
1 YEAR -1 70
2 YEAR-2 80
3 YEAR-3 85
4 YEAR-4 90
5 YEAR-5 95
6 YEAR-6 95
7 YEAR-7 95
8 YEAR-8 95
/year
9504.95 18319.00
10862.80 20936.00
11541.73 22244.50
12220.65 23553.00
12899.58 24861.50
12899.58 24861.50
12899.58 24861.50
12899.58 24861.50
DETAILS OF SALARY WAGES PER ANNUM
ASSUMPTIONS
SINGLE SHIFT OF 8 HOURS PER DAY
25 DAYS PER MONTH
300 DAYS PER YEAR
1 MANAGER (SELF) 1 0
ACCOUNTANT CUM
2 1 10000
COMPUTER OPERATOR
4 PEON/ CHOWKIDAR 1 5000
TECHNICAL STAFF
2 CHEMIST 1 9000
1 OPERATOR 1 10000
.00
120.00
60.00
144.00
108.00
120.00
96.00
60.00
120.00
828.00
12.42
840.42
S NO. PARTICULARS
POWER REQUIREMENT
TOTAL AMOUNT
WATER REQUIREMENT
REQUIREMENT OF WATER FOR DRINKING, SANITATION,
1
CLEANING ETC
MENT
132 HP
POWER FROM PDD HOU
98.4324 KW
POWER FROM DG SET HO
123.09 KVA
300 DAYS
8 HOURS
147648.6 UNITS
110781 UNITS
516.77 Rs
886.25 Rs
1403.02 LACS
MENT
2 KL/day
20 KL/day
6600 KL/YEAR
132.00 RS
1535.02 LACS
POWER FROM PDD HOURS= 5
1 RENT 240.00
3 TELEPHONE 3.00
4 CARRIAGE 70.00
5 INSURANCE 30.00
2.50
2.00
1.50
1.00
.50
.00
NT RY E
AG
E CE ES
RE NE ON I N NS
IO PH R R RA PE
AT LE CA SU .E
X
ST TE IN SC
D I
AN M
GE
STA
PO
GROSS WORKING CAPITAL
GROSS WOR
18.00
16.00
14.00
12.00
10.00
8.00
6.00
4.00
2.00
.00
R R R
A A A
YE YE YE YE
t d rd
Is n 3 th
2 4
G CAPITAL
4th YEAR 5th YEAR 6th YEAR 7th YEAR 8th YEAR
CAPACITY
S. NO. YEAR SALE Adm.Exp
UTILIZATION
AMOUNT (LACS)
183.19
209.36
222.45
235.53
248.62
248.62
248.62
248.62
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
SELLING EXPENSES
CAPACITY
S. NO. YEAR SALE Adm.Exp
UTILIZATION
366.38
418.72
444.89
471.06
497.23
497.23
13.48% 9.93%
497.23
11.35% 1
2
497.23 13.48% 3
4
12.06% 5
6
7
13.48%
8
12.77%
13.48%
1
2
3
4
5
6
7
8
REPAIRS AND MAINTENANCE OF FIXED ASSETS
AMOUNT (LACS)
129.92
173.22
216.53
259.83
303.14
346.44
346.44
346.44
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
TERM LOAN REPAYMENT SCHEDULE
S NO. PARTICULARS
1 CAPITAL EXPENDITURE
2 PROMOTERS CONTRIBUTION(@25%)
4 REPAYMENT SCHEDULE
5 RATE OF INTEREST
6 LOAN EMI
PRINCIPAL PAYABLE
TOTAL INTEREST
YEAR PRINCIPAL
2019 568.38
2020 639.19
2021 718.83
2022 808.40
2023 909.12
2024 1022.39
2025 1149.78
2026 1293.04
2027 1454.14
2028 1635.32
T SCHEDULE
AMOUNT (LACS)
9478.85
2369.71
7109.13
11.8
114.76
3908.20
11017.33
7109.13
3908.20
TOTAL OPENING
INTEREST CLOSING BALANCE
PAYMENT BALANCE
B (A+B)
PERIODS= 96
₹ 7,064,277.50
₹ 7,018,979.04
₹ 6,973,235.15
₹ 6,927,041.44
₹ 6,880,393.49
₹ 6,833,286.84
₹ 6,785,716.97
₹ 6,737,679.34
₹ 6,689,169.33
₹ 6,640,182.31
₹ 6,590,713.58
₹ 6,540,758.41
₹ 6,490,312.01
₹ 6,439,369.56
₹ 6,387,926.17
₹ 6,335,976.93
₹ 6,283,516.85
₹ 6,230,540.91
₹ 6,177,044.04
₹ 6,123,021.12
₹ 6,068,466.97
₹ 6,013,376.38
₹ 5,957,744.06
₹ 5,901,564.69
₹ 5,844,832.89
₹ 5,787,543.22
₹ 5,729,690.21
₹ 5,671,268.31
₹ 5,612,271.93
₹ 5,552,695.42
₹ 5,492,533.07
₹ 5,431,779.12
₹ 5,370,427.76
₹ 5,308,473.11
₹ 5,245,909.25
₹ 5,182,730.17
₹ 5,118,929.83
₹ 5,054,502.12
₹ 4,989,440.87
₹ 4,923,739.85
₹ 4,857,392.77
₹ 4,790,393.28
₹ 4,722,734.96
₹ 4,654,411.33
₹ 4,585,415.85
₹ 4,515,741.92
₹ 4,445,382.86
₹ 4,374,331.94
₹ 4,302,582.35
₹ 4,230,127.23
₹ 4,156,959.62
₹ 4,083,072.54
₹ 4,008,458.90
₹ 3,933,111.56
₹ 3,857,023.30
₹ 3,780,186.84
₹ 3,702,594.82
₹ 3,624,239.82
₹ 3,545,114.32
₹ 3,465,210.76
₹ 3,384,521.48
₹ 3,303,038.75
₹ 3,220,754.78
₹ 3,137,661.68
₹ 3,053,751.50
₹ 2,969,016.20
₹ 2,883,447.68
₹ 2,797,037.72
₹ 2,709,778.07
₹ 2,621,660.37
₹ 2,532,676.18
₹ 2,442,816.97
₹ 2,352,074.15
₹ 2,260,439.03
₹ 2,167,902.82
₹ 2,074,456.68
₹ 1,980,091.65
₹ 1,884,798.70
₹ 1,788,568.70
₹ 1,691,392.44
₹ 1,593,260.61
₹ 1,494,163.82
₹ 1,394,092.58
₹ 1,293,037.30
₹ 1,190,988.31
₹ 1,087,935.84
₹ 983,870.02
₹ 878,780.89
₹ 772,658.38
₹ 665,492.34
₹ 557,272.49
₹ 447,988.48
₹ 337,629.85
₹ 226,186.02
₹ 113,646.33
₹ -0.00
₹ -114,763.85
₹ -230,656.22
₹ -347,688.19
₹ -465,870.98
₹ -585,215.90
₹ -705,734.38
₹ -827,437.95
₹ -950,338.28
₹ -1,074,447.12
₹ -1,199,776.38
₹ -1,326,338.03
₹ -1,454,144.21
₹ -1,583,207.15
₹ -1,713,539.20
₹ -1,845,152.86
₹ -1,978,060.72
₹ -2,112,275.50
₹ -2,247,810.06
₹ -2,384,677.38
₹ -2,522,890.57
₹ -2,662,462.84
₹ -2,803,407.58
₹ -2,945,738.28
₹ -3,089,468.56
PROJECT COST SUMMARY
3 DEPRECIATION 1080.15
TOTAL 2007.24
TAX .00
2ND YEAR 3RD YEAR 4TH YEAR 5TH YEAR 6TH YEAR 7TH YEAR 8TH YEAR
4 5 6 7 8
CASH FLOW STATEMENT
S NO. PARTICULARS 0 YEAR IST YEAR 2ND YEAR
CE OF FUNDS( INFLOW)
LIABILITIES
ASSETS
3RD YEAR 4TH YEAR 5TH YEAR 6TH YEAR 7TH YEAR 8TH YEAR
LIABILITIES
ASSETS
B PAYMENTS;-
ON TERM LOAN
INTEREST 808.79 737.97 658.33
PRINCIPAL (INSTALMENT) 568.38 639.19 718.83
ON WORKING CAPITAL
INTEREST 118.30 136.50 136.50
TOTAL :- B 1495.47 1513.67 1513.67
D.S.C.R = A/B 3.53 4.10 4.42
AVERAGE D.S.C.R
D.S.C.R
6.00
5.00
4.00
3.00
2.00
1.00
0.00
1 2 3 4 5 6 7
VICE COVERAGE RATIO(D.S.C.R)
4TH YEAR 5TH YEAR 6TH YEAR 7TH YEAR 8TH YEAR
6478.28 7072.23 7221.90 7417.86 7620.15
699.69 606.95 527.25 458.68 399.64
7177.97 7679.18 7749.15 7876.54 8019.79
D.S.C.R 4.65
D.S.C.R
D.S.C.R = A/B
4 5 6 7 8
BREAK EVEN ANALYSIS
S.NO PARTICULARS
CAPACITY UTILIZATION
1 RAW MATERIAL
3 SELLING EXPENSES
4 INTEREST ON W.C
5 SALARY &WAGES(60%)
TOTAL
CONTRIBUTION(1)
1 SALARY &WAGES(40%)
2 MAINTENANCE OF F.ASSETS
3 ADMINISTRATIVE. EXPENSES
5 DEPRECIATION
TOTAL (2)
70% 80%
18319.00 20936.00
ST (I)
9504.95 10862.80
1335.61 1526.41
183.19 418.72
118.30 136.50
352.98 403.40
11495.03 13347.84
6823.97 7588.16
ED COST (II)
235.32 268.93
129.92 173.22
183.19 209.36
808.79 737.97
1080.15 933.47
2437.36 2322.95
0.36 0.31
6543.12 6409.11
37.25 36.24
BASIC ASSUMPTIONS AND PRE-ASSUMPTIONS
8 HRS
300
2400 HRS
70%
3 YEARS
13 % PER ANNUM
12 % PER ANNUM
7 YEARS
SYS-3
SEMI AUTO BOTTLE MFG BOTTLE MOULDING MACHINE(BOTTLE DIE
3.4
COSTEXTRA AT 1800 BPH)(2+2CAVITY)
1 8.43 8.43
1 0.35 0.35
1 0.55 0.55
1 0.35 0.35
1 0.5 0.5
TMENT SYSTEM 10.18
ONTROL LAB
1 0.35 0.35
1 2.51 2.51
AKETS/MIN 1 7.98 7.98
CHINE(BOTTLE DIE
1 15.98
15.98
30 BPM 1 13.5 13.5
1 0.2 0.2
G MACHINES 40.52
TECHNOLOGY
1 0.96 0.96
1 0.55 0.55
1 0.38 0.38
1 1.45 1.45
1 0.98 0.98
1 0.95 0.95
1 5.5 5.5
ECHNOLOGY(SYS-4) 10.77
MACHINERY 65.22