Scope of Coverage
For Condominium/ Executive Condominium (EC) Projects
Objective
- Introduce the authority requirements, present key points that require
attention
Computation of
peak runoff
rational formula
Min. 2m from
ground level for
conceal drain @
green buffer
Drain & access covers are not allowed within green buffer except for
crossings running perpendicular to planting verge
Note : Please seek your consultants’ advice for particular case in your project.
Part 2 General sequence
General Flowchart For Design Coordination
Penthouse
First Storey
C&S & MEP • MEP Working Drawing- For checking services clash
Working Drawing
Part 2 General sequence & Design Intent
Archi. working drawing
Waterbay project
Part 2 General sequence & Design Intent
Archi. working drawing
Waterbay project
Part 2 General sequence & Design Intent
Archi. Working Drawing
- Tower Block 17th Storey Plan (Sample):
1.Only provide the intent of RWDP stack pipe run in M&E shaft.
2.Not provide discharge position for open Balcony & staircase area.
Waterbay project
Part 2 General sequence & Design Intent
Archi. Working Drawing
Approval discharge
point 1
Approval discharge
point 2
Waterbay project
Part 2 General sequence & Design Intent
Landscape Working Drawing
- Landscape Planter Drainage Details (Sample):
1.Indicate drainage & waterproofing details.
2. Discharge pipes penetrate slab run through
basement high level.
Waterbay project
Part 2 General sequence & Design Intent
Landscape Working Drawing
- Landscape Cub-soil
Drainage Typical Details
(Sample):
1.Indicate miscellaneous
details of sub- soil drainage
for varies zone area.
Part 3 Tower block RWDP system
3.1 Tower block RWDP Discharge System main procedure
RWDP Discharge System for
Study and coordinate roof
with C&S and MEP to Based on consultant
check roof level design intent, adjust
roof levels, division
of water outlet RWDP Discharge System for
catchment & Lift lobby area
discharge outlet
location etc. with
To check if consultant integrated RWDP Discharge System for
intent for quantity/ consideration of all Balcony area
size of downpipes is related drawings
sufficient at roof
2 2
Control penthouse
clear headroom
1
Waterbay project penthouse open balcony discharge pipes
Part 3 Tower block RWDP system
3.2 Roof Drainage System
Case Study- finalized roof RWDP system
Based on calculation provide sufficient nos. of RWDP, indicate gutter location, width, level,
summit point and fall direction, and indicate discharge pipe size, location & quantity.
Avoid scupper drain to run
below water tank
Waterbay project Part Print @ Roof RWDP Layout Plan Shop Drawing
Part 3 Tower block RWDP system
Indicate rainwater fall
3.2 Roof Drainage System direction and FFL/SFL
Area A Area B
Shaft
150mm
Shaft
Lower Roof Roof terrace
Shaft
Waterbay project
Part 3 Tower block RWDP system
3.2 Roof Drainage System Free fall to 1 side down to
lower roof floor, another 3
Case Study- Roof RWDP Typical Details sides provide kerb.
Diameter 50 overflow pipe,
Upper Roof
+25mm higher than roof FFL.
C
Min.600mm
Only provided 2 no. 75mm
(dia.) siphonic pipes for 1 block
roof including 4 units.
Woodlands EC (catacment area = 600+ m2)
∅75mm Siphonic UPVC PIPE
(TO SPECIALIST'S DETAIL)
Part 3 Tower block RWDP system
3.2. Roof Drainage System
Case Study- Approved shop drawing (Sample)
Level
section details
outlet, RWDP
pipes location
fall direction
scupper drain
Fully coordination
with C&S,MEP
trade prior to
submit shop
drawing.
RWDP from above roof– Check whether the discharge connection location/details &
diversion routing (if any) are suitable. (avoid to run thru. dry area & expose @ units space.)
Open sky terrace drainage system (if any) – Check open terrace floor finishes depth, pipe
connection position/routing, below storey headroom.
Shaft – Check shaft location , size & whether clash with other MEP services.
Lift Lobby Area , Balcony Area ,A/C ledge etc. – refer to typical storey level.
For particular case, subject to consultants/client’s requirement & site condition.
Part 3 Tower block RWDP system
3.3 Penthouse Level RWDP System
Case Study- Open Balcony Drainage Details
proposed two 75mm discharge
---- pipe for open balcony, avoid
blocking
A
I
Detail section A
Waterbay project
Part 3 Tower block RWDP system
3.3 Penthouse Level RWDP System
Case Study- Open Balcony Drainage Details
To avoid RWDP to run through dry area (Esp. bedroom & living room etc)
To avoid exposed RWDP @ unit space.
Roof terrace
Roof terrace
BED ROOM
Minton project Part Print @ Penthouse unit Layout & Details Shop Drawing
Part 3 Tower block RWDP system
3.3 Penthouse Level RWDP System
Case Study- Approved shop drawing
Woodlands EC
Part 3 Tower block RWDP system
3.4 Typical Storey RWDP System
Case Study- Approved shop drawing
A Section A-A
No gravity gradient
Keep min. 150mm (clear) from
required for Siphonic discharge pipe to top & bottom level
rainwater pipe,
of In-house drain to prevent flow
100mm (dia) pipe connect back or flood in case of heavy
to in-house rainwater sump. rainwater.
Woodlands EC 1st Storey Siphonic RWDP Discharge Localized Plan & Section Details
Part 4 E-
E-deck rainwater run
run--off system
4.2 Tower block RWDP discharge system @ 1st storey
2 cases in Waterbay project:
•RWDP cast in transfer plate and discharge to house drain.
•RWDP go thru basement high level.
Proposed RWDP
Concealed pipe from
transfer slab connect to
in house drain
Waterbay project 1st Storey RWDP Discharge Layout & Details
Part 4 E-deck rainwater run
E- run--off system
4.3 Proposed E-deck discharge system layout plan
Based on Archi. working drawing and M&E CSD , in consideration of basement headroom,
proposed rainwater pipe location & routing at basement high level.
Waterbay project
Part 4 E-deck rainwater run
E- run--off system
4.3 Proposed E-deck discharge system layout plan
Refer to M&E basement CSD drawing, check MV ducting system and ensure rainwater pipe can
discharge out without any headroom issue.
Basement
Retaining wall
RWDP cannot go
through above
basement water
tank .
1st Storey RWDP Discharge Localized Layout & Details (In progress) Woodlands EC
Key points to consider:
Consultant request no major RWDP expose @ basement high level , hence intend to run E-deck instead of basement high level.
According to the requirement , propose the drain system:
RWDP from tower blk --- nearest RS --- In house drain --- perimeter drain --- RS @ green buffer (if any) --- External approved discharge point
RWDP @ Planter & common area RS --- In house drain --- perimeter drain --- RS @ green buffer (if any) --- External approved discharge point
Part 4 E-deck rainwater run
E- run--off system
4.4 Proposed E-deck discharge system sections/details
provide section shown M&E service system & rainwater discharge system to ensure comply with
basement clear headroom requirement.
MV Ductless
250mm RWDP
Section A-A
MV Ductless
Section D-D
Waterbay project
Part 4 E-deck rainwater run
E- run--off system
4.5 Boundary drain discharge system Key points to be considerated
For Waterbay case, considering tight space at green •Green buffer clear width (3m)
buffer area in working drawing, We proposed two •Fire engine access clear width(4m)
solutions for the discharge system, 1) boundary drainage •Existing discharge points IL
only for green buffer area. 2) Tower block and E-deck •Drain size & gradient(1:200)
rainwater directly discharge to discharge point . •Sump distance & IL
RWDP directly connect
Provide 450x600mm
to Discharge point 01 Box drain for E-deck
rainwater
Not harmonious
the boundary detail
drawing
Arch Working drawing (Before)
QJ proposed
coordination detail
(Revised) Landscape detail (Before)
Waterbay project
Part 4 E-deck rainwater run
E- run--off system
4.5 Boundary drain discharge system.
Design intent :
1.Indicated boundary 3 discharge point.
2. Provided 450mm wide surface drain for 2M green
buffer area. Boundary drain
3. Show 1st storey and E-deck FFL & PL level.
4. Show E-deck perimeter drain location. 2M green buffer area
5. No boundary wall location & External level.
Perimeter drain
Boundary drain:
According site condition • Drain size depends on water-collecting amount
Revised boundary drain • Access panel should be provided every 6m along boundary drain
layout •Use cascading Fall system. Gradient range 1:100 ~ 1:200
External level
4M fire engine
access level
The Minton
Part 4 E-deck rainwater run
E- run--off system
4.5 E-deck drain & sump cover finishing system.
Typical detail sump & drain Grating cover general detail for rainwater drain & sump
Typical detail for Heavy duty Grating sump cover Typical detail for Heavy duty
Grating drain sump cover in tiling finishing
Catchment area
Approval Hydraulic
location plan Waterbay project calculation
Part 4 E-deck rainwater run
E- run--off system
4.8 Revised as per comments submit by Architect CBPU submission
Submit all tower block RWDP approval cad drawing for CBPU submission .
Submit 1st storey E-deck overall RWDP approval discharge layout plan cad drawing for CBPU submission.
Waterbay project
Part 5 Basement water run-
run-off system
Rainwater pump sump
• catchment area
Catchment area
provided by Architect.
To check any void on
E-deck (Esp. for
natural ventilation)
After internal coordination,
provide catchment area to
structure consultant to
calculate its capacity.
Ecopolitan project
Part 5 Basement water run-
run-off system
Rainwater pump sump
Design Intent of Storm Water Tank Size & Capacity Calculation (by C&S Consultant)
Ecopolitan project
Part 5 Basement water run-
run-off system
Rainwater pump sump
Coordinated water run-off setting out plan, Rain water to discharge to storm water tank
Ecopolitan project
Part 5 Basement water run-
run-off system
Rainwater pump sump
Section for Rain Water Tank & Pump pit
Waterbay project
Thank You !