Preparation by: Xu You Xing

Jiang Chun Yan & Hu Bo


Wang Long &Yu Guo chao
Check by: Cao Ji Yong
Zhang Li Ming / Lim Woon Keong 13/09/2014
Training Scope and Objective

 Scope of Coverage
For Condominium/ Executive Condominium (EC) Projects

 Objective
- Introduce the authority requirements, present key points that require
attention

- Better understanding of the sequence of rainwater run-off shop drawing


preparation

- Sharing of good practice & experiences for problems solving


CONTENTS

Part 1 Authority Requirement


Part 2 General Sequence for Coordination & Design
Intent Drawing
Part 3 Tower Block RWDP System
Part 4 E-deck Rainwater run-off System
Part 5 Basement Rainwater System
Part 1 Authority Requirement
 The related Code
<Code of Practice on Surface Water Drainage>
The code of practice contains information on the basic
planning, design and procedural requirements for
surface water drainage, and specifies the minimum
engineering requirements for the provision of
functional facilities for surface water drainage.

<Code of Practice for Drainage of Roofs> (SS 525:2006)


The code specifies requirements for the drainage of
surface water from roofs and walls and recommends
methods of designing gutters, gutter outlets and
rainwater downpipes, performance requirements for
siphonic roof systems are outlined as well.
Part 1 Authority Requirement
 Drainage design and considerations

The return periods (T)


adopted for the design of
drainage systems in
Singapore are as follows

Computation of
peak runoff
rational formula

The runoff coefficient (C) depends on


the degree and type of development
within the catchment. Catchments are
classified according to the expected
general characteristics when fully
developed
Part 1 Authority Requirement
 Computation of discharge capacity
- Manning’s formula
Part 1 Authority Requirement
 Pumped drainage system
- The minimum
design and operation
criteria for the
pumped drainage
system shall be as This formula only use by M&E
Subcon water pump calculate
follows. (Based on Storm water tank size
& capacity)
Part 1 Authority Requirement
 Conventional RWDP Size Estimation

Conventional Collected surface


Radius RWDP Area
RWDP size rainwater area
(mm) (m) (m2) (m2)

Dia.75 0.035 0.00385 38.5

Dia.100 0.050 0.00785 78.5

Dia.150 0.075 0.01766 176.6

Dia.200 0.100 0.0314 314

Dia.250 0.125 0.04906 490.6 Note:


For Siphonic RWDP , calculation
Dia.300 0.150 0.07065 706.5 should be provided by specialist.

Note: Rainwater Surface area=3.14xRxRx10000 m2

Rule of thumb method for downpipe size


corresponding to catchment area (Option 1)
The collected rainwater area estimated by option 1 is less than option 2.
(for reference)
Part 1 Authority Requirement
 Conventional RWDP Size Estimation
Sample: Assume Rain water run-off effective catchment area Ae = 500 m2
The rate of run-off Q in litres/second is given by:
Q = (Ae x I)/3600
I is the design rainfall intensity in mm/hr. I =196.9 mm/hr
Hence Q= (500 x 196.9)/3600 = 27.3 L/s

According to the Table 8


Selected 1 No. of 150 (Diameter)

Q=31.6 L/s > 27.3 L/s


OK!

SS 525:2006 Page 66 Table 8– Capacity of Vertical


rainwater pipes

Simple estimation method for downpipe size


corresponding to catchment area (Option 2)
Part 1 Authority Requirement
 Design flowchart ( from SS 525:2006)
Roof Drainage Design FLowchart Flowchart 3e- Flat roof drainage
Part 1 Authority Requirement
 Design flowchart ( from SS 525:2006)
Flowchart 4-Vertical & horiziontal
pipes (gravity system) Flowchart 5- Siphonic roof drainage system
Part 1 Authority Requirement
 Drain @ Green buffer (from NPark)

Min. 2m from
ground level for
conceal drain @
green buffer

Drain & access covers are not allowed within green buffer except for
crossings running perpendicular to planting verge

Note : Please seek your consultants’ advice for particular case in your project.
Part 2 General sequence
 General Flowchart For Design Coordination

Upper roof / Lower roof / Roof terrace

Penthouse

Typical Storey By Main-Contractor

First Storey

Basement High Level/E-deck Surface Level

Review & approve shop drawing & Provide By Consultants


Hydraulic calculation

CBPU (BP) Submission


Part 2 General sequence & Design Intent
 The related working drawing from consultant

•Tower Block Roof Plan


•Penthouse plan.
Arch RWDP •Typical storey.
•2nd storey layout plan
working drawing •1st Storey E-deck over-all RWDP discharge layout plan.
•Basement layout plan.
•Other drawing if any

• Landscape Drainage plan.


• Planter detail
Landscape Working • Landscape soiling plan & section.
drawing

• C&S Consultant Drawing-Framing Plan

C&S & MEP • MEP Working Drawing- For checking services clash

Working Drawing
Part 2 General sequence & Design Intent
 Archi. working drawing

- Upper Roof Layout Plan (Sample) :


1.Not indicate proper level
2.Not indicate RWDP discharge position

Waterbay project
Part 2 General sequence & Design Intent
 Archi. working drawing

- Lower Roof Layout Plan (Sample):


1.Not indicate level
2. Provide general fall direction
3. Provide scupper drain @ perimeter along parapet
4. Provide discharge position.

Waterbay project
Part 2 General sequence & Design Intent
 Archi. Working Drawing
- Tower Block 17th Storey Plan (Sample):
1.Only provide the intent of RWDP stack pipe run in M&E shaft.
2.Not provide discharge position for open Balcony & staircase area.

Waterbay project
Part 2 General sequence & Design Intent
 Archi. Working Drawing
Approval discharge
point 1

Approval discharge
point 2

- 1st storey & E-deck Plan


(Sample):
1. Indicate proposed boundary 3
discharge point.
Approval discharge 2. Indicate 300mm wide surface
point 3 drain for green buffer area.
3. Show 1st storey and E-deck FFL &
PL level.
4. Show tower block RWDP pipes
location.
5. Not consider boundary location.
Waterbay project
Part 2 General sequence & Design Intent
 Landscape Working Drawing

- 1st Storey Landscape Drainage Plan


(Sample):
1.Only has the intent for planter area
drainage, provide min. 2 discharge pipes per
planter area. (more discharge pipes for large
planter area according to calculation)

Waterbay project
Part 2 General sequence & Design Intent
 Landscape Working Drawing
- Landscape Planter Drainage Details (Sample):
1.Indicate drainage & waterproofing details.
2. Discharge pipes penetrate slab run through
basement high level.

Waterbay project
Part 2 General sequence & Design Intent
 Landscape Working Drawing

- Landscape Cub-soil
Drainage Typical Details
(Sample):
1.Indicate miscellaneous
details of sub- soil drainage
for varies zone area.
Part 3 Tower block RWDP system
3.1 Tower block RWDP Discharge System main procedure
RWDP Discharge System for
Study and coordinate roof
with C&S and MEP to Based on consultant
check roof level design intent, adjust
roof levels, division
of water outlet RWDP Discharge System for
catchment & Lift lobby area
discharge outlet
location etc. with
To check if consultant integrated RWDP Discharge System for
intent for quantity/ consideration of all Balcony area
size of downpipes is related drawings
sufficient at roof

•Check shaft location Discharge points level, location


•Gradient requirement: 1:200
Continue and the details of discharge
•Cut-off drain
to Part 4 outlet connection with house
•Downpipes size, location & quantity
drain/ external manhole
Part 3 Tower block RWDP system
3.2 Roof Drainage System
 Key Point for Coordination/Consideration

 Determine type of roof drainage system (Conventional or Siphonic System)


 Determine upper roof drainage system (free fall to lower roof slab or use RWDP discharge)
 Confirm Upper roof/Lower roof level (FFL/SFL)
 Determine fall direction/scupper drain size & routing
 Considerate roof slab finishes thickness & waterproofing details
 Determine rainwater fall gradient (min 1:200)
 Determine rain water pipe outlet location & size, no.
 Determine overflow pipe location & level (in any)
 For particular case, subject to consultants/client’s requirement & site condition.
Part 3 Tower block RWDP system
3.2 Roof Drainage System
 Case Study-confirm roof level, propose scupper drain & RWDP
 Based on Archi. design intent, consider the dimension of structure elements,
MEP service equipments at roof, AMSL and penthouse clear headroom
requirement to confirm roof level.
Coordination for
Roof water tank
height a). Adjust Roof level .
Control Tower b). Control waterproofing
block AMSL level installation detail level.
164.00 c). Propose RWDP for upper
roof.

Propose 150 mm (W) x


10~150mm scupper
1
drain

2 2
Control penthouse
clear headroom

1
Waterbay project penthouse open balcony discharge pipes
Part 3 Tower block RWDP system
3.2 Roof Drainage System
 Case Study- finalized roof RWDP system
 Based on calculation provide sufficient nos. of RWDP, indicate gutter location, width, level,
summit point and fall direction, and indicate discharge pipe size, location & quantity.
Avoid scupper drain to run
below water tank

According to Indicate FFL/SFL


catchment area ,
provide two Nos
Indicate rainwater fall
of RWDP
Direction

Waterbay project Part Print @ Roof RWDP Layout Plan Shop Drawing
Part 3 Tower block RWDP system
Indicate rainwater fall
3.2 Roof Drainage System direction and FFL/SFL

 Case Study- Consideration outlet location & nos.

Area A Area B

As per calculation catchment


In consideration of shaft
area provide discharge pipe
location, connect pipe to
Waterbay project Part Print @ Roof RWDP Layout Plan Shop Drawing shaft.
Part 3 Tower block RWDP system
3.2 Roof Drainage System
 Case Study- Good Practice for typical details

Shaft

 Roof surface gradient of discharging rain water is min. 1:200


 The thickness of Insulation with protection screed layer is 150 ~ 200mm and subject to Architect’
approval due to the control of AMSL at roof.
 Roof slab must be casted to fall to designed outlets during casting stage to avoid water stagnant
at roof.
Part 3 Tower block RWDP system
3.2 Roof Drainage System
 Case Study- Roof RWDP Typical Details
300x300mm drainage cell to be
installed beside scupper drain area to
Upper Roof prevent water ponding and avoid
maintenance issue.

150mm

Shaft
Lower Roof Roof terrace

Roof water tank waterproofing .


Shaft

 Provide sections shown


Roof terrace
connection details for
discharge pipe.

Shaft
Waterbay project
Part 3 Tower block RWDP system
3.2 Roof Drainage System Free fall to 1 side down to
lower roof floor, another 3
 Case Study- Roof RWDP Typical Details sides provide kerb.
Diameter 50 overflow pipe,
Upper Roof
+25mm higher than roof FFL.

Max. 325mm thk. finishes due


to long distance & less
discharge pipes by using
siphonic system.

450x450x175mm (D) for


siphonic outlet

C
Min.600mm
 Only provided 2 no. 75mm
(dia.) siphonic pipes for 1 block
roof including 4 units.
Woodlands EC (catacment area = 600+ m2)
∅75mm Siphonic UPVC PIPE
(TO SPECIALIST'S DETAIL)
Part 3 Tower block RWDP system
3.2. Roof Drainage System
 Case Study- Approved shop drawing (Sample)
Level
section details
 outlet, RWDP
pipes location
 fall direction
scupper drain

Fully coordination
with C&S,MEP
trade prior to
submit shop
drawing.

Waterbay project Tower blk Roof Level RWDP Layout Plan


Part 3 Tower block RWDP system
3.3 Penthouse Level RWDP System
 Key Point for Coordination/Consideration

 RWDP from above roof– Check whether the discharge connection location/details &
diversion routing (if any) are suitable. (avoid to run thru. dry area & expose @ units space.)
 Open sky terrace drainage system (if any) – Check open terrace floor finishes depth, pipe
connection position/routing, below storey headroom.
 Shaft – Check shaft location , size & whether clash with other MEP services.
 Lift Lobby Area , Balcony Area ,A/C ledge etc. – refer to typical storey level.
 For particular case, subject to consultants/client’s requirement & site condition.
Part 3 Tower block RWDP system
3.3 Penthouse Level RWDP System
 Case Study- Open Balcony Drainage Details
proposed two 75mm discharge
 ---- pipe for open balcony, avoid
blocking

A
I

proposed details for concealed


RWDP to avoid expose this pipe.

Detail section A
Waterbay project
Part 3 Tower block RWDP system
3.3 Penthouse Level RWDP System
 Case Study- Open Balcony Drainage Details
 To avoid RWDP to run through dry area (Esp. bedroom & living room etc)
 To avoid exposed RWDP @ unit space.

If can not avoid this issue, proposed


corresponding detail for reference.

Roof terrace
Roof terrace

BED ROOM

Minton project Part Print @ Penthouse unit Layout & Details Shop Drawing
Part 3 Tower block RWDP system
3.3 Penthouse Level RWDP System
 Case Study- Approved shop drawing

Waterbay project Penthouse Level RWDP Discharge Layout & Details


Part 3 Tower block RWDP system
3.4 Typical Storey RWDP System
 Key Point for Coordination/Consideration
 RWDP from above level– Continue to go down @ shaft if no particular require.
 Shaft – Not allow RWDP in electrical, TAS, DR and water riser.
 Lift Lobby Area – Fall to 1 or 2 sides of lobby within or without scupper drain, then connect
to RWDP @ nearest shaft.
 Balcony Area
– Determine surface rainwater collection type (recommend scupper drain provision).
– Determine outlet location & connection & discharge pipe size.
– Check whether RWDP run through below storey high level or be casted into slab.
If no false ceiling provided @ Balcony, discharge pipes should be cast into slab. (To note slab
thickness & minimize the distance to connection.)
If false ceiling provided @ Balcony, ensure discharge pipe run above ceiling.
 A/C Ledge
– Option 1: Provide shallow scupper drain & free fall to 1 side down from drip. (most practice)
– Option 2: Provide shallow scupper drain & discharge to RWDP @ beside shaft.
 For particular case, subject to consultants/client’s requirement & site condition.
Part 3 Tower block RWDP system
3.4 Typical Storey RWDP System
 Case Study- Lift lobby area drainage details

According to fire protection


requirement proposed brick wall box.

No scupper drain provision, discharge


pipe run thru. Above ceiling & connect
to RWDP.

Due to precast refuse chute and space


constraint beside rise door, propose the
50mm stack pipe shift to DR riser within
Waterbay project brickwall box.
Part 3 Tower block RWDP system
3.4 Typical Storey RWDP System
 Case Study- RWDP Layout @ Lift Lobby & Balcony Area

No shaft provision for


RWDP @ design intent
drawing, Propose
100mm(dia.) RWDP
concealed in brick wall.

Provide scupper drain, discharge pipe


run thru. above ceiling & connect to 50mm (dia.) cast in
RWDP @ shaft. 175mm (thk.) slab to
connect 75mm (dia.)
RWDP

Minton & Ecopolitan project


Part 3 Tower block RWDP system
3.4 Typical Storey RWDP System
 Case Study- Balcony Layout & details

Woodlands EC
Part 3 Tower block RWDP system
3.4 Typical Storey RWDP System
 Case Study- Approved shop drawing

Detail & section

Typical Storey RWDP Discharge Layout & Details


Part 4 E-
E-deck rainwater run
run--off system
4.1 Main procedure for E-deck Rainwater Discharge System
MEP
basement • discharge pipe size & quantity
• discharge pipe routing for RWDP
CSD drawing
Archi working • discharge points level, location &
drawing for details of discharge outlet connection
Basement with house drain/ external manhole
Rainwater Structure
Clear • House drain system (if any)
discharge construction
headroom
system drawing
•Drainage outlet location,
size & quantity for landscape
Tower block RWDP •Consideration for run-off from
discharge system @ water feature tanks
Propose rainwater
1st storey •Ramp cut-off drain for fire
discharge system for E- engine access
deck following architect Landscape drainage plan
design intent •Drain size & gradient
•Sump distance & INL
Perimeter/boundary drain •Drain crossing must
connect with rain sump

•Submit to Architect for approval •Submit to CBPU for approval


•Submit to structure consultant for hydraulic calculation
Part 4 E-
E-deck rainwater run
run--off system
4.2 Tower block RWDP discharge system @ 1st storey

A Section A-A

No gravity gradient
Keep min. 150mm (clear) from
required for Siphonic discharge pipe to top & bottom level
rainwater pipe,
of In-house drain to prevent flow
100mm (dia) pipe connect back or flood in case of heavy
to in-house rainwater sump. rainwater.

Woodlands EC 1st Storey Siphonic RWDP Discharge Localized Plan & Section Details
Part 4 E-
E-deck rainwater run
run--off system
4.2 Tower block RWDP discharge system @ 1st storey
2 cases in Waterbay project:
•RWDP cast in transfer plate and discharge to house drain.
•RWDP go thru basement high level.

Proposed RWDP
Concealed pipe from
transfer slab connect to
in house drain
Waterbay project 1st Storey RWDP Discharge Layout & Details
Part 4 E-deck rainwater run
E- run--off system
4.3 Proposed E-deck discharge system layout plan
 Based on Archi. working drawing and M&E CSD , in consideration of basement headroom,
proposed rainwater pipe location & routing at basement high level.

E-deck common area discharge system:


•Use house drain to discharge through
basement high level
•Go below timber decking footpath.

Experience RWDP Size:


*Planter & E-deck discharge pipe
proposed Dia 100~75mm.
*Basement high level can use from small
connect to big size pipe (100 to 150 to
200 to 250 to 300mm)
*In house drain can proposed 200mm to
600mm according to size condition and
catchment area .

Waterbay project
Part 4 E-deck rainwater run
E- run--off system
4.3 Proposed E-deck discharge system layout plan
 Refer to M&E basement CSD drawing, check MV ducting system and ensure rainwater pipe can
discharge out without any headroom issue.
Basement
Retaining wall

proposed 300mm RWDP run


M&E MV
thru basement high level
ducting system
(gradient 1:200 )

RWDP cannot go
through above
basement water
tank .

Major points for coordination:


•RWDP cannot go through above basement water tank.
• Check M&E MV ducting & Electric system avoid to clash.
• RWDP cannot go above electric system.
• Basement high level can use from small connect to big
(100 to 150 to 200 to 250 to 300mm)
Waterbay project to avoid clash and headroom issue.
Part 4 E-deck rainwater run
E- run--off system
4.3 Proposed E-deck discharge system layout plan

1st Storey RWDP Discharge Localized Layout & Details (In progress) Woodlands EC
Key points to consider:
Consultant request no major RWDP expose @ basement high level , hence intend to run E-deck instead of basement high level.
According to the requirement , propose the drain system:
RWDP from tower blk --- nearest RS --- In house drain --- perimeter drain --- RS @ green buffer (if any) --- External approved discharge point
RWDP @ Planter & common area RS --- In house drain --- perimeter drain --- RS @ green buffer (if any) --- External approved discharge point
Part 4 E-deck rainwater run
E- run--off system
4.4 Proposed E-deck discharge system sections/details
 provide section shown M&E service system & rainwater discharge system to ensure comply with
basement clear headroom requirement.

MV Ductless

250mm RWDP

Section A-A

MV Ductless

Section D-D
Waterbay project
Part 4 E-deck rainwater run
E- run--off system
4.5 Boundary drain discharge system Key points to be considerated
 For Waterbay case, considering tight space at green •Green buffer clear width (3m)
buffer area in working drawing, We proposed two •Fire engine access clear width(4m)
solutions for the discharge system, 1) boundary drainage •Existing discharge points IL
only for green buffer area. 2) Tower block and E-deck •Drain size & gradient(1:200)
rainwater directly discharge to discharge point . •Sump distance & IL
RWDP directly connect
Provide 450x600mm
to Discharge point 01 Box drain for E-deck
rainwater

230MM WIDE SURFACE DRAIN Provide 300mm


3.0M WIDE GREEN BUFFUR RWDP for basement
and check clear
headroom
4.0M WIDE DRIVEWAY / FIRE ENGINE ACCESS

Tower block & E-deck


RWDP directly discharge to
discharge point 01 Waterbay project
Part 4 E-deck rainwater run
E- run--off system
4.5 Boundary drain discharge system
 In order to meet authority requirement for 3.0M green buffer
and 4M fire engine access, We shifted fire engine access inward
250mm to allow boundary drain.

Not harmonious
the boundary detail
drawing
Arch Working drawing (Before)

QJ proposed
coordination detail
(Revised) Landscape detail (Before)
Waterbay project
Part 4 E-deck rainwater run
E- run--off system
4.5 Boundary drain discharge system.
Design intent :
1.Indicated boundary 3 discharge point.
2. Provided 450mm wide surface drain for 2M green
buffer area. Boundary drain
3. Show 1st storey and E-deck FFL & PL level.
4. Show E-deck perimeter drain location. 2M green buffer area
5. No boundary wall location & External level.

4M fire engine access area

Perimeter drain

The Minton E-deck working drawing (Before)


Part 4 E-deck rainwater run
E- run--off system
4.5 Boundary drain discharge system Show boundary wall and
External level

Show section for even


more clear comprehend
interfacing issue.

Boundary drain:
According site condition • Drain size depends on water-collecting amount
Revised boundary drain • Access panel should be provided every 6m along boundary drain
layout •Use cascading Fall system. Gradient range 1:100 ~ 1:200

According site condition


Revised proposed Concealed drain plus RS system:
concealed drain •The distance between RS should be
3m to 12m.
• RS size depends on its depth and pipe
size which connect with it.
•Use cascading Fall system. Gradient
range 1:100 ~ 1:200 fall to sump

The Minton E-deck RWDP revised drawing


Part 4 E-deck rainwater run
E- run--off system
4.5 Boundary drain discharge system

External level

Boundary wall level

4M fire engine
access level

Boundary drain discharge


cascading Level

The Minton E-deck RWDP revised drawing


Part 4 E-deck rainwater run
E- run--off system
4.4 Perimeter/Boundary drain discharge system.
Major points for coordination:
• Section details for concealed drain which includes connection details
between RS & concrete pipe, between RS & discharge pipe from
basement high level
• In order to avoid the rain water backflow, PVC pipe IL should be at least
300mm higher than RS IL.
•Concealed drain at planter area, Try to keep min. soil depth for planter

H (Depth of RS) RS Size(mm x mm)


H<1m 450x450 600x600
1m≤H<2m 750x750 750x900
2m≤H 750x900 900x900 1200x1200

Basement high level


RWDP connect to
rainwater sump

The Minton E-deck RWDP revised drawing


Part 4 E-deck rainwater run
E- run--off system
4.6 E-deck drain discharge coordination
Part 4 E-deck rainwater run
E- run--off system
4.6 E-deck drain discharge coordination
Sub Soil Pipe Details
Major points for coordination:
• Sub-soil pipe shop drawing
done by landscape subcon.
• According planter area
proposed sub-soil pipe.

The Minton
Part 4 E-deck rainwater run
E- run--off system
4.5 E-deck drain & sump cover finishing system.

Different colors represent


different cover finishing
Part 4 E-deck rainwater run
E- run--off system
4.7 Rainwater drain & sump cover system

Typical detail sump & drain Grating cover general detail for rainwater drain & sump

Typical detail sump & drain Grating cover in tiling finishing


Part 4 E-deck rainwater run
E- run--off system
4.7 Rainwater drain & sump cover system

Typical detail for Heavy duty Grating sump cover Typical detail for Heavy duty
Grating drain sump cover in tiling finishing

Typical detail for Heavy duty Grating drain cover


Part 4 E-deck rainwater run
E- run--off system
4.8 Approved drawing by Architect for hydraulic calculation
Key points to be included in drawing
•Discharge points location & IVL
•Flow direction
•Indicate catchment area on layout plan
•Drain crossing must connect with rain sump

Catchment area
Approval Hydraulic
location plan Waterbay project calculation
Part 4 E-deck rainwater run
E- run--off system
4.8 Revised as per comments submit by Architect CBPU submission
 Submit all tower block RWDP approval cad drawing for CBPU submission .
 Submit 1st storey E-deck overall RWDP approval discharge layout plan cad drawing for CBPU submission.

Waterbay project
Part 5 Basement water run-
run-off system
 Rainwater pump sump
• catchment area
 Catchment area
provided by Architect.
 To check any void on
E-deck (Esp. for
natural ventilation)
 After internal coordination,
provide catchment area to
structure consultant to
calculate its capacity.

Ecopolitan project
Part 5 Basement water run-
run-off system
 Rainwater pump sump
 Design Intent of Storm Water Tank Size & Capacity Calculation (by C&S Consultant)

 Consultant designed Storm Water


Tank size is 20×6×1.45 (Clear Ht.
from pipe invert level)
Effective Capacity: 174m³.

 After coordination, propose sunken storm water


tank at Basement 2 under the transfer tank
Proposed size: 13.8××9.4××2.45m (H)
(1m space from invert level to slab soffit)
Effective Capacity: 188m³>174m³

Ecopolitan project
Part 5 Basement water run-
run-off system
 Rainwater pump sump

Coordinated water run-off setting out plan, Rain water to discharge to storm water tank

Ecopolitan project
Part 5 Basement water run-
run-off system
 Rainwater pump sump
Section for Rain Water Tank & Pump pit

Waterbay project
Thank You !