Quotation

To : ALESON SHIPPING INC. Date: April 11, 2017


172-174 Veterans Avenue Our Ref.: SP-ALT-ALESON-17-0133
Zamboanga City Your Ref.:

Attention: Ms. Sally Santos


Purchasing Head

Thru:

To supply of labor, tools, equipment, consumables, spare parts and mobilization cost for the complete overhauling of 2 units Turbocharger Port /
Starboard side main engine model Mitsubishi TD 13-M of MV ANIKA GAYLE 1 @ Port of Cebu City.
Item Description Qty U/M Unit Price Amount in ₱
1 OVERHAULING OF TURBOCHARGER: ( Starboard and Port Side ) 2 units 8,500.00 17,000.00
• Clean an dinspect all components
• Reconditioning and re-standardizing of bolt hole for casing.
• Assemble unit with relevant spare parts.
• Check clearances
• Painting and made ready for installation.
2 DYNAMIC BALANCING OF ROTOR SHAFT: 2 units 7,500.00 15,000.00
• Take and record initial clearance.
• Glass beads blasting of totor shaft assembly.
• Inspect dimension of turbine blades, bearing seats and compressor
• Check alignment of rotor shaft.
• Dismantling and glass beads blasting.
• Balance Rotor shaft assembly
• Assemble to unit and made ready for installation.
4 PARTS FOR RECONDITIONING:
• De-carbonizing of Gas Inlet and Gas Outlet Casing 2 sets 4,500.00 9,000.00
5 PARTS FOR REPLACEMENT:
• Turbocharger Reapir Kits 2 set 55,000.00 110,000.00
****Nothing Follows**** -
-
-
-
-
-

TOTAL PRICE = ₱ 151,000.00


Completion time: ASAP. Less Discount = ₱ 15,100.00
Terms of payment: 30 calendar days. Sub Total = ₱ 135,900.00
Delivery point: Port of Cebu City. 12% VAT = 16,308.00
Price validity: 15 days. TOTAL PRICE = ₱ 152,208.00
Warranty: Six (6) months under normal operating condition.

Very truly yours,

ALAN L. TUL-ID
President - Gen. Manager