Inspected by:
FCD Dimensions
Structure Location
x
Footing GLB-2 1.2000
ation Footing GLB-3 1.2000
Footing GLB'-3" 1.2000
Footing GLC 1.2000
Footing GLC-2 1.2000
Footing GLC-3 1.2000
Footing GLC' 1.2000
Footing GLD 1.2000
Footing GLD-2 1.2000
Footing GLD-3 1.2000
Footing
Footing GLE 1.2000
3000 psi
11.3000 0.3500 4.7460 3000 psi
3.6250 0.3500 1.5225 3000 psi
2.7500 0.3500 1.1550 3000 psi
7.2950 0.3500 3.0639 3000 psi
3.6250 0.3500 1.5225 3000 psi
3.6250 0.3500 1.5225 3000 psi
1.2000 0.3500 3000 psi
1.0000
30.8868
Inspected by:
1 of 2
CONCRETE THEORETICAL VOLUME COMPUTATION
18-Jan-19 Location: Block 9
2of 2
CONCRETE POURING REQUEST
Inspected by:
FCD Dimensions
Structure Location
x
Footing GLF' 1.2000
ation Footing GL G 1.2000
Footing GLG-2 1.2000
Footing GLG-3 1.2000
Footing GLG'-2 1.2000
Footing GLG'-3 1.2000
Footing GLG'-3" 1.2000
1 of 2
CONCRETE THEORETICAL VOLUME COMPUTATION
18-Jan-19 Location: Block 9
2of 2
CONCRETE POURING REQUEST
Inspected by:
FCD Dimensions
Structure Location
x
Footing GLB-2 1.2000
ation Footing GLB-3 1.2000
Footing GLB'-3" 1.2000
Footing GLC 1.2000
Footing GLC-2 1.2000
Footing GLC-3 1.2000
Footing GLC' 1.2000
Footing GLD 1.2000
Footing GLD-2 1.2000
Footing GLD-3 1.2000
Footing
Footing GLE 1.2000
3000 psi
11.3000 0.3500 4.7460 3000 psi
3.6250 0.3500 1.5225 3000 psi
2.7500 0.3500 1.1550 3000 psi
7.2950 0.3500 3.0639 3000 psi
3.6250 0.3500 1.5225 3000 psi
3.6250 0.3500 1.5225 3000 psi
1.2000 0.3500 0.5040 3000 psi
1.0000 Wastage Factor Fact
31.3908 Total Volume for 3000
Total Volume for 4000
Total Volume for 5000
Total Volume
Inspected by: Prepared by:
1 of 2
CONCRETE THEORETICAL VOLUME COMPUTATION
18-Jan-19 Location: Block 9
2of 2
CONCRETE POURING REQUEST
Inspected by:
FCD Dimensions
Structure Location
k 12-2 (40-45) x
Block 12-1
ation Slab on Grade Unit 46 5.0000
Slab on Grade Unit 47 5.0000
Slab on Grade Unit 48 5.0000
Slab on Grade Unit 49 5.0000
Slab on Grade Unit 50 5.0000
Slab on Grade Unit 51 5.0000
Block 12-2
1.0500
30.0000
31.5
Inspected by:
1 of 2
CONCRETE THEORETICAL VOLUME COMPUTATION
Pouring Date: 18-Jan-19 Location: Block 9
2of 2
TION
Design Remarks
CONCRETE POURING REQUEST
Inspected by:
ation
1 of 2
TION
48-49)
Design Remarks
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
CONCRETE THEORETICAL VOLUME COMPUTATION
Pouring Date: Location:
2of 2
TION
Design Remarks
CONCRETE POURING REQUEST
Inspected by:
Activity Company Name Contractor's Signature Date
Representative
Inspected by:
Pouring Date:
Structure
-Block 9 (22-27)
Block 9
attached volume computation Slab on Grade
dy Mix Concrete Slab on Grade
Slab on Grade
uary 6, 2019/ 9:00 aM Slab on Grade
uary 6, 2019/ 1:00 PM Slab on Grade
Slab on Grade
Inspected by:
Owner's Signature Date REMARKS
Representative
1 of 2
UTATION CONCRETE THEORETICAL VOLUME
Pouring Date: 18-Jan-19
FCD Dimensions
Design Remarks Structure Location
x
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
si 0.0000
si
si
0
Inspected by:
2of 2
CONCRETE POURING REQUEST
Inspected by:
Activity Company Name Contractor's Signature Date
Representative
Inspected by:
Pouring Date:
Structure
-Block 9 (22-27)
Block 9
attached volume computation Slab on Grade
dy Mix Concrete Slab on Grade
Slab on Grade
uary 6, 2019/ 9:00 aM Slab on Grade
uary 6, 2019/ 1:00 PM Slab on Grade
Slab on Grade
Inspected by:
Owner's Signature Date REMARKS
Representative
1 of 2
UTATION CONCRETE THEORETICAL VOLUME
Pouring Date: 18-Jan-19
FCD Dimensions
Design Remarks Structure Location
x
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
si 0.0000
si
si
0
Inspected by:
2of 2
CONCRETE POURING REQUEST
Inspected by:
Activity Company Name Contractor's Signature Date
Representative
Inspected by:
Pouring Date:
Structure
Footing
attached volume computation Footing
dy Mix Concrete Footing
Footing
uary 18, 2019/ 1:00 PM Footing
uary 18, 2019/ 3:00 PM Footing
uary 18, 2019/ 4:00 PM Footing
uary 18, 2019/ 6:00 PM Footing
Footing
Footing
Inspected by:
Owner's Signature Date REMARKS
Representative
Footing
Footing
Footing
Footing
Footing
Footing
Footing
Footing
Wastage Factor Factor
Total Volume for 3000 psi
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume
Prepared by:
1 of 2
UTATION CONCRETE THEORETICAL VOLUME
Pouring Date: 18-Jan-19
FCD Dimensions
Design Remarks Structure Location
x
3000 psi Footing GLF' 1.2000
3000 psi Footing GL G 1.2000
3000 psi Footing GLG-2 1.2000
3000 psi Footing GLG-3 1.2000
3000 psi Footing GLH 1.2000
3000 psi Footing GLH-2 1.2000
3000 psi Footing GLH-3 1.2000
3000 psi Footing GLG' 1.2000
3000 psi Footing GLH' 1.2000
3000 psi Footing GLI 1.2000
1.2000
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
Wastage Factor Factor
Total Volume for 3000 psi
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume
Prepared by:
3010 psi
1.9300 0.3500 0.8106 3011 psi
1.2000 0.3500 0.5040 3012 psi
1.0500
si 21.9156
si
si
43.515675
Inspected by:
2of 2
CONCRETE POURING REQUEST
Inspected by:
Activity Company Name Contractor's Signature Date
Representative
Line and Grade
Rebars
Structural QA/QC
Formworks
Electrical Works
FDAS/Auxiliary System
Mechanical Works
Sanitary/Plumbing Works
Fire Protection System
Architectural
Landscape
Others
Requested by:
Inspected by:
Pouring Date:
Structure
Footing
attached volume computation Footing
dy Mix Concrete Footing
Footing
uary 18, 2019/ 1:00 PM Footing
uary 18, 2019/ 3:00 PM
uary 18, 2019/ 4:00 PM
uary 18, 2019/ 6:00 PM
Inspected by:
Owner's Signature Date REMARKS
Representative
Prepared by:
Inspected by:
1 of 2
UTATION
Design Remarks
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi