CONCRETE POURING REQUEST

Project : Polygonal Succession


Loacation : Sitio Asis Brgy Kaylaway, Nasugbu Batangas
Owner : Revolution Precrafted-Batulao Artscape
Date : Friday (January 17, 2019)

Type of Structure : Footing-Block 9


Concrete Strength Design : 3000 psi
Total Volume of Concrete : See attached volume computation
Method of Pouring : Ready Mix Concrete
Concrete Slump : 5" to 8"
Projected Pouring Date/Time Started : January 18, 2019/ 1:00 PM
Projected Pouring Date/Time Finished : January 18, 2019/ 3:00 PM
Actual Pouring Date/Date Started : January 18, 2019/ 4:00 PM
Actual Pouring Date/Date Finished : January 18, 2019/ 6:00 PM

Inspected by: Inspected by:


Activity Company Name Contractor's Signature Date Owner's
Representative Representative

Line and Grade


Rebars
Structural QA/QC
Formworks
Electrical Works
FDAS/Auxiliary System
Mechanical Works
Sanitary/Plumbing Works
Fire Protection System
Architectural
Landscape
Others
Requested by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.

Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted
UEST
CONCRETE THEORETICAL VOLU
Pouring Date: 18-Jan-19

FCD Dimensions
Structure Location
x
Footing GLB-2 1.2000
ation Footing GLB-3 1.2000
Footing GLB'-3" 1.2000
Footing GLC 1.2000
Footing GLC-2 1.2000
Footing GLC-3 1.2000
Footing GLC' 1.2000
Footing GLD 1.2000
Footing GLD-2 1.2000
Footing GLD-3 1.2000

Signature Date REMARKS GLD' 1.2000

Footing
Footing GLE 1.2000

Footing GLE-2 1.2000

Footing GLE-3 1.2000

Footing GLF 1.2000

Footing GLF-2 1.2000

Footing GLF-3 1.2000

Footing GLE' 1.2000

Wastage Factor Factor


Total Volume for 3000 psi
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume
Prepared by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.
ETICAL VOLUME COMPUTATION
Location: Block 9

FCD Dimensions Theoritical Design Remarks


y L/d Volume
2.7500 0.3500 1.155 3000 psi
2.7500 0.3500 1.1550 3000 psi
1.2000 0.3500 0.5040 3000 psi
11.3000 0.3500 4.7460 3000 psi
3.6250 0.3500 1.5225 3000 psi
2.7500 0.3500 1.1550 3000 psi
1.2000 0.3500 0.5040 3000 psi
7.2950 0.3500 3.0639 3000 psi
3.6250 0.3500 1.5225 3000 psi
3.6250 0.3500 1.5225 3000 psi

1.2000 0.3500 0.5040

3000 psi
11.3000 0.3500 4.7460 3000 psi
3.6250 0.3500 1.5225 3000 psi
2.7500 0.3500 1.1550 3000 psi
7.2950 0.3500 3.0639 3000 psi
3.6250 0.3500 1.5225 3000 psi
3.6250 0.3500 1.5225 3000 psi
1.2000 0.3500 3000 psi
1.0000
30.8868
Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted

1 of 2
CONCRETE THEORETICAL VOLUME COMPUTATION
18-Jan-19 Location: Block 9

FCD Dimensions Theoritical


Location Design Remarks
x y L/d Volume

GL G 1.2000 11.3000 0.3500 4.7460


GLG-2 1.2000 3.6250 0.3500 1.5225
GLG-3 1.2000 2.7500 0.3500 1.1550

Wastage Factor Factor 1.0500


Total Volume for 3000 psi 7.4235
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume 40.225815
Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted

2of 2
CONCRETE POURING REQUEST

Project : Polygonal Succession


Loacation : Sitio Asis Brgy Kaylaway, Nasugbu Batangas
Owner : Revolution Precrafted-Batulao Artscape
Date : Friday (January 17, 2019)

Type of Structure : Footing-Block 9


Concrete Strength Design : 3000 psi
Total Volume of Concrete : See attached volume computation
Method of Pouring : Ready Mix Concrete
Concrete Slump : 5" to 8"
Projected Pouring Date/Time Started : January 18, 2019/ 1:00 PM
Projected Pouring Date/Time Finished : January 18, 2019/ 3:00 PM
Actual Pouring Date/Date Started : January 18, 2019/ 4:00 PM
Actual Pouring Date/Date Finished : January 18, 2019/ 6:00 PM

Inspected by: Inspected by:


Activity Company Name Contractor's Signature Date Owner's
Representative Representative

Line and Grade


Rebars
Structural QA/QC
Formworks
Electrical Works
FDAS/Auxiliary System
Mechanical Works
Sanitary/Plumbing Works
Fire Protection System
Architectural
Landscape
Others
Requested by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.

Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted
UEST
CONCRETE THEORETICAL VOLU
Pouring Date: 18-Jan-19

FCD Dimensions
Structure Location
x
Footing GLF' 1.2000
ation Footing GL G 1.2000
Footing GLG-2 1.2000
Footing GLG-3 1.2000
Footing GLG'-2 1.2000
Footing GLG'-3 1.2000
Footing GLG'-3" 1.2000

Signature Date REMARKS

Footing GLE' 1.2000

Wastage Factor Factor


Total Volume for 3000 psi
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume
Prepared by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.
ETICAL VOLUME COMPUTATION
Location: Block 9 Pouring Date:

FCD Dimensions Theoritical Design Remarks Structure


y L/d Volume
1.2000 0.3500 0.504 Footing
11.3000 0.3500 4.7460 Footing
3.6250 0.3500 1.5225 Footing
2.7500 0.3500 1.1550 Footing
1.9300 0.3500 0.8106 Footing
1.9300 0.3500 0.8106 Footing
1.2000 0.3500 0.5040 Footing

1.2000 0.3500 0.5040 3000 psi


1.0000 Wastage Factor Fact
10.5567 Total Volume for 3000
Total Volume for 4000
Total Volume for 5000
Total Volume
Inspected by: Prepared by:

Engr. Eliazar Abes Engr. Riza Manuel


Project in-Charge Project In Charge
Revolution Precrafted Ongpeng-SantosConstruction Corps.

1 of 2
CONCRETE THEORETICAL VOLUME COMPUTATION
18-Jan-19 Location: Block 9

FCD Dimensions Theoritical


Location Design Remarks
x y L/d Volume
GLF' 1.2000 1.2000 0.3500 0.504
GL G 1.2000 11.3000 0.3500 4.7460
GLG-2 1.2000 3.6250 0.3500 1.5225
GLG-3 1.2000 2.7500 0.3500 1.1550
GLG'-2 1.2000 1.9300 0.3500 0.8106
GLG'-3 1.2000 1.9300 0.3500 0.8106
GLG'-3" 1.2000 1.2000 0.3500 0.5040

Wastage Factor Factor 1.0500


Total Volume for 3000 psi 10.0527
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume 21.63987
Inspected by:

Engr. Eliazar Abes


Project in-Charge
Construction Corps. Revolution Precrafted

2of 2
CONCRETE POURING REQUEST

Project : Polygonal Succession


Loacation : Sitio Asis Brgy Kaylaway, Nasugbu Batangas
Owner : Revolution Precrafted-Batulao Artscape
Date : Friday (January 17, 2019)

Type of Structure : Footing-Block 9


Concrete Strength Design : 3000 psi
Total Volume of Concrete : See attached volume computation
Method of Pouring : Ready Mix Concrete
Concrete Slump : 5" to 8"
Projected Pouring Date/Time Started : January 18, 2019/ 1:00 PM
Projected Pouring Date/Time Finished : January 18, 2019/ 3:00 PM
Actual Pouring Date/Date Started : January 18, 2019/ 4:00 PM
Actual Pouring Date/Date Finished : January 18, 2019/ 6:00 PM

Inspected by: Inspected by:


Activity Company Name Contractor's Signature Date Owner's
Representative Representative

Line and Grade


Rebars
Structural QA/QC
Formworks
Electrical Works
FDAS/Auxiliary System
Mechanical Works
Sanitary/Plumbing Works
Fire Protection System
Architectural
Landscape
Others
Requested by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.

Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted
UEST
CONCRETE THEORETICAL VOLU
Pouring Date: 18-Jan-19

FCD Dimensions
Structure Location
x
Footing GLB-2 1.2000
ation Footing GLB-3 1.2000
Footing GLB'-3" 1.2000
Footing GLC 1.2000
Footing GLC-2 1.2000
Footing GLC-3 1.2000
Footing GLC' 1.2000
Footing GLD 1.2000
Footing GLD-2 1.2000
Footing GLD-3 1.2000

Signature Date REMARKS GLD' 1.2000

Footing
Footing GLE 1.2000

Footing GLE-2 1.2000

Footing GLE-3 1.2000

Footing GLF 1.2000

Footing GLF-2 1.2000

Footing GLF-3 1.2000

Footing GLE' 1.2000

Wastage Factor Factor


Total Volume for 3000 psi
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume
Prepared by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.
ETICAL VOLUME COMPUTATION
Location: Block 9 Pouring Date:

FCD Dimensions Theoritical Design Remarks Structure


y L/d Volume
2.7500 0.3500 1.155 3000 psi Footing
2.7500 0.3500 1.1550 3000 psi Footing
1.2000 0.3500 0.5040 3000 psi Footing
11.3000 0.3500 4.7460 3000 psi Footing
3.6250 0.3500 1.5225 3000 psi Footing
2.7500 0.3500 1.1550 3000 psi Footing
1.2000 0.3500 0.5040 3000 psi Footing
7.2950 0.3500 3.0639 3000 psi
3.6250 0.3500 1.5225 3000 psi
3.6250 0.3500 1.5225 3000 psi

1.2000 0.3500 0.5040

3000 psi
11.3000 0.3500 4.7460 3000 psi
3.6250 0.3500 1.5225 3000 psi
2.7500 0.3500 1.1550 3000 psi
7.2950 0.3500 3.0639 3000 psi
3.6250 0.3500 1.5225 3000 psi
3.6250 0.3500 1.5225 3000 psi
1.2000 0.3500 0.5040 3000 psi
1.0000 Wastage Factor Fact
31.3908 Total Volume for 3000
Total Volume for 4000
Total Volume for 5000
Total Volume
Inspected by: Prepared by:

Engr. Eliazar Abes Engr. Riza Manuel


Project in-Charge Project In Charge
Revolution Precrafted Ongpeng-SantosConstruction Corps.

1 of 2
CONCRETE THEORETICAL VOLUME COMPUTATION
18-Jan-19 Location: Block 9

FCD Dimensions Theoritical


Location Design Remarks
x y L/d Volume
GLF' 1.2000 1.2000 0.3500 0.504
GL G 1.2000 11.3000 0.3500 4.7460
GLG-2 1.2000 3.6250 0.3500 1.5225
GLG-3 1.2000 2.7500 0.3500 1.1550
GLG'-2 1.2000 1.9300 0.3500 0.8106
GLG'-3 1.2000 1.9300 0.3500 0.8106
GLG'-3" 1.2000 1.2000 0.3500 0.5040

Wastage Factor Factor 1.0500


Total Volume for 3000 psi 10.0527
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume 43.515675
Inspected by:

Engr. Eliazar Abes


Project in-Charge
Construction Corps. Revolution Precrafted

2of 2
CONCRETE POURING REQUEST

Project : Polygonal Succession


Loacation : Sitio Asis Brgy Kaylaway, Nasugbu Batangas
Owner : Revolution Precrafted-Batulao Artscape
Date : February 5, 2019

Type of Structure : SOG-Block 12-1 (46-51)/ Block 12-2 (40-45)


Concrete Strength Design : 3000 psi
Total Volume of Concrete : See attached volume computation
Method of Pouring : Ready Mix Concrete
Concrete Slump : 5" to 8"
Projected Pouring Date/Time Started : February 6, 2019/ 9:00 aM
Projected Pouring Date/Time Finished : February 6, 2019/ 1:00 PM
Actual Pouring Date/Date Started :
Actual Pouring Date/Date Finished :

Inspected by: Inspected by:


Activity Company Name Contractor's Signature Date Owner's
Representative Representative

Line and Grade


Rebars
Structural QA/QC
Formworks
Electrical Works
FDAS/Auxiliary System
Mechanical Works
Sanitary/Plumbing Works
Fire Protection System
Architectural
Landscape
Others
Requested by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.

Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted
UEST
CONCRETE THEORETICAL VOLU
Pouring Date: 6-Feb-19

FCD Dimensions
Structure Location
k 12-2 (40-45) x
Block 12-1
ation Slab on Grade Unit 46 5.0000
Slab on Grade Unit 47 5.0000
Slab on Grade Unit 48 5.0000
Slab on Grade Unit 49 5.0000
Slab on Grade Unit 50 5.0000
Slab on Grade Unit 51 5.0000

Block 12-2

Signature Date REMARKS

Slab on Grade Unit 40 5.0000


Slab on Grade Unit 41 5.0000
Slab on Grade Unit 42 5.0000
Slab on Grade Unit 43 5.0000
Slab on Grade Unit 44 5.0000
Slab on Grade Unit 45 5.0000

Wastage Factor Factor


Total Volume for 3000 psi
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume
Prepared by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.
ETICAL VOLUME COMPUTATION
Location: Block 9

FCD Dimensions Theoritical Design Remarks


y L/d Volume

5.0000 0.1000 2.5 3000 psi


5.0000 0.1000 2.5 3000 psi
5.0000 0.1000 2.5 3000 psi
5.0000 0.1000 2.5 3000 psi
5.0000 0.1000 2.5 3000 psi
5.0000 0.1000 2.5 3000 psi

5.0000 0.1000 2.5 3000 psi


5.0000 0.1000 2.5 3000 psi
5.0000 0.1000 2.5 3000 psi
5.0000 0.1000 2.5 3000 psi
5.0000 0.1000 2.5 3000 psi
5.0000 0.1000 2.5 3000 psi

1.0500
30.0000

31.5
Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted

1 of 2
CONCRETE THEORETICAL VOLUME COMPUTATION
Pouring Date: 18-Jan-19 Location: Block 9

FCD Dimensions Theoritical


Structure Location
x y L/d Volume

Wastage Factor Factor


Total Volume for 3000 psi 0.0000
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume 0
Prepared by: Inspected by:

Engr. Riza Manuel Engr. Eliazar Abes


Project In Charge Project in-Charge
Ongpeng-SantosConstruction Corps. Revolution Precrafted

2of 2
TION

Design Remarks
CONCRETE POURING REQUEST

Project : Polygonal Succession- Batulao Artscape


Loacation : Sitio Asis Brgy Kaylaway, Nasugbu Batangas
Owner : Revolution Precrafted-Batulao Artscape
Date : Friday (February 5, 2019)

Type of Structure : Footing-Block 8 UNIT 49


Concrete Strength Design : 3000 psi
Total Volume of Concrete : See attached volume computation
Method of Pouring : Ready Mix Concrete
Concrete Slump : 5" to 8"
Projected Pouring Date/Time Started : February 6, 2019/ 9:00 aM
Projected Pouring Date/Time Finished : February 6, 2019/ 10:00 aM
Actual Pouring Date/Date Started :
Actual Pouring Date/Date Finished :

Inspected by: Inspected by:


Activity Company Name Contractor's Signature Date Owner's
Representative Representative

Line and Grade


Rebars
Structural QA/QC
Formworks
Electrical Works
FDAS/Auxiliary System
Mechanical Works
Sanitary/Plumbing Works
Fire Protection System
Architectural
Landscape
Others
Requested by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.

Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted
UEST

ation

Signature Date REMARKS


CONCRETE THEORETICAL VOLUME COMPUTATION
Pouring Date: 6-Feb-19 Location: Block 8 (unit 48-49)

FCD Dimensions Theoritical


Structure Location
x y L/d Volume
Footing GLB-2 1.2000 2.7500 0.3500 1.155
Footing GLB-3 1.2000 2.7500 0.3500 1.1550
Footing GLB'-3" 1.2000 1.2000 0.3500 0.5040
Footing GLC 1.2000 11.3000 0.3500 4.7460
Footing GLC-2 1.2000 3.6250 0.3500 1.5225
Footing GLC-3 1.2000 2.7500 0.3500 1.1550
Footing GLC' 1.2000 1.2000 0.3500 0.5040
Footing GLD 1.2000 7.2950 0.3500 3.0639
Footing GLD-2 1.2000 3.6250 0.3500 1.5225
Footing GLD-3 1.2000 3.6250 0.3500 1.5225

Wastage Factor Factor 1.0000


Total Volume for 3000 psi 16.8504
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume
Prepared by: Inspected by:

Engr. Riza Manuel Engr. Eliazar Abes


Project In Charge Project in-Charge
Ongpeng-SantosConstruction Corps. Revolution Precrafted

1 of 2
TION
48-49)

Design Remarks

3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
CONCRETE THEORETICAL VOLUME COMPUTATION
Pouring Date: Location:

FCD Dimensions Theoritical


Structure Location
x y L/d Volume

Wastage Factor Factor 1.0500


Total Volume for 3000 psi 0.0000
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume 17.69292
Prepared by: Inspected by:

Engr. Riza Manuel Engr. Eliazar Abes


Project In Charge Project in-Charge
Ongpeng-SantosConstruction Corps. Revolution Precrafted

2of 2
TION

Design Remarks
CONCRETE POURING REQUEST

Project : Polygonal Succession


Loacation : Sitio Asis Brgy Kaylaway, Nasugbu Batangas
Owner : Revolution Precrafted-Batulao Artscape
Date : February 5, 2019

Type of Structure : SOG-Block 9 (22-27)


Concrete Strength Design : 3000 psi
Total Volume of Concrete : See attached volume computation
Method of Pouring : Ready Mix Concrete
Concrete Slump : 5" to 8"
Projected Pouring Date/Time Started : February 6, 2019/ 9:00 aM
Projected Pouring Date/Time Finished : February 6, 2019/ 1:00 PM
Actual Pouring Date/Date Started :
Actual Pouring Date/Date Finished :

Inspected by:
Activity Company Name Contractor's Signature Date
Representative

Line and Grade


Rebars
Structural QA/QC
Formworks
Electrical Works
FDAS/Auxiliary System
Mechanical Works
Sanitary/Plumbing Works
Fire Protection System
Architectural
Landscape
Others
Requested by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.

Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted
OURING REQUEST

Pouring Date:

Structure
-Block 9 (22-27)
Block 9
attached volume computation Slab on Grade
dy Mix Concrete Slab on Grade
Slab on Grade
uary 6, 2019/ 9:00 aM Slab on Grade
uary 6, 2019/ 1:00 PM Slab on Grade
Slab on Grade

Inspected by:
Owner's Signature Date REMARKS
Representative

Wastage Factor Factor


Total Volume for 3000 psi
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume
Prepared by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.
CONCRETE THEORETICAL VOLUME COMPUTATION
6-Feb-19 Location: Block 9

FCD Dimensions Theoritical


Location
x y L/d Volume

Unit 22 5.0000 5.0000 0.1000 2.5


Unit 23 5.0000 5.0000 0.1000 2.5
Unit 24 5.0000 5.0000 0.1000 2.5
Unit 25 5.0000 5.0000 0.1000 2.5
Unit 26 5.0000 5.0000 0.1000 2.5
Unit 27 5.0000 5.0000 0.1000 2.5

Wastage Factor Factor 1.0500


Total Volume for 3000 psi 15.0000
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume 15.75
Inspected by:

Engr. Eliazar Abes


Project in-Charge
-SantosConstruction Corps. Revolution Precrafted

1 of 2
UTATION CONCRETE THEORETICAL VOLUME
Pouring Date: 18-Jan-19

FCD Dimensions
Design Remarks Structure Location
x

3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi

Wastage Factor Factor


Total Volume for 3000 psi
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume
Prepared by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.
EORETICAL VOLUME COMPUTATION
Location: Block 9

FCD Dimensions Theoritical Design Remarks


y L/d Volume

si 0.0000
si
si
0
Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted

2of 2
CONCRETE POURING REQUEST

Project : Polygonal Succession


Loacation : Sitio Asis Brgy Kaylaway, Nasugbu Batangas
Owner : Revolution Precrafted-Batulao Artscape
Date : February 5, 2019

Type of Structure : SOG-Block 9 (22-27)


Concrete Strength Design : 3000 psi
Total Volume of Concrete : See attached volume computation
Method of Pouring : Ready Mix Concrete
Concrete Slump : 5" to 8"
Projected Pouring Date/Time Started : February 6, 2019/ 9:00 aM
Projected Pouring Date/Time Finished : February 6, 2019/ 1:00 PM
Actual Pouring Date/Date Started :
Actual Pouring Date/Date Finished :

Inspected by:
Activity Company Name Contractor's Signature Date
Representative

Line and Grade


Rebars
Structural QA/QC
Formworks
Electrical Works
FDAS/Auxiliary System
Mechanical Works
Sanitary/Plumbing Works
Fire Protection System
Architectural
Landscape
Others
Requested by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.

Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted
OURING REQUEST

Pouring Date:

Structure
-Block 9 (22-27)
Block 9
attached volume computation Slab on Grade
dy Mix Concrete Slab on Grade
Slab on Grade
uary 6, 2019/ 9:00 aM Slab on Grade
uary 6, 2019/ 1:00 PM Slab on Grade
Slab on Grade

Inspected by:
Owner's Signature Date REMARKS
Representative

Wastage Factor Factor


Total Volume for 3000 psi
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume
Prepared by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.
CONCRETE THEORETICAL VOLUME COMPUTATION
6-Feb-19 Location: Block 9

FCD Dimensions Theoritical


Location
x y L/d Volume

Unit 22 5.0000 5.0000 0.1000 2.5


Unit 23 5.0000 5.0000 0.1000 2.5
Unit 24 5.0000 5.0000 0.1000 2.5
Unit 25 5.0000 5.0000 0.1000 2.5
Unit 26 5.0000 5.0000 0.1000 2.5
Unit 27 5.0000 5.0000 0.1000 2.5

Wastage Factor Factor 1.0500


Total Volume for 3000 psi 15.0000
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume 15.75
Inspected by:

Engr. Eliazar Abes


Project in-Charge
-SantosConstruction Corps. Revolution Precrafted

1 of 2
UTATION CONCRETE THEORETICAL VOLUME
Pouring Date: 18-Jan-19

FCD Dimensions
Design Remarks Structure Location
x

3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
3000 psi

Wastage Factor Factor


Total Volume for 3000 psi
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume
Prepared by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.
EORETICAL VOLUME COMPUTATION
Location: Block 9

FCD Dimensions Theoritical Design Remarks


y L/d Volume

si 0.0000
si
si
0
Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted

2of 2
CONCRETE POURING REQUEST

Project : Polygonal Succession


Loacation : Sitio Asis Brgy Kaylaway, Nasugbu Batangas
Owner : Revolution Precrafted-Batulao Artscape
Date : Friday (January 17, 2019)

Type of Structure : Footing-Block 9


Concrete Strength Design : 3000 psi
Total Volume of Concrete : See attached volume computation
Method of Pouring : Ready Mix Concrete
Concrete Slump : 5" to 8"
Projected Pouring Date/Time Started : January 18, 2019/ 1:00 PM
Projected Pouring Date/Time Finished : January 18, 2019/ 3:00 PM
Actual Pouring Date/Date Started : January 18, 2019/ 4:00 PM
Actual Pouring Date/Date Finished : January 18, 2019/ 6:00 PM

Inspected by:
Activity Company Name Contractor's Signature Date
Representative

Line and Grade


Rebars
Structural QA/QC
Formworks
Electrical Works
FDAS/Auxiliary System
Mechanical Works
Sanitary/Plumbing Works
Fire Protection System
Architectural
Landscape
Others
Requested by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.

Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted
OURING REQUEST

Pouring Date:

Structure

Footing
attached volume computation Footing
dy Mix Concrete Footing
Footing
uary 18, 2019/ 1:00 PM Footing
uary 18, 2019/ 3:00 PM Footing
uary 18, 2019/ 4:00 PM Footing
uary 18, 2019/ 6:00 PM Footing
Footing
Footing

Inspected by:
Owner's Signature Date REMARKS
Representative
Footing
Footing
Footing
Footing
Footing
Footing
Footing
Footing
Wastage Factor Factor
Total Volume for 3000 psi
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume
Prepared by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.
CONCRETE THEORETICAL VOLUME COMPUTATION
18-Jan-19 Location: Block 5

FCD Dimensions Theoritical


Location
x y L/d Volume
GLB-2 1.2000 2.7500 0.3500 1.155
GLB-3 1.2000 2.7500 0.3500 1.1550
GLB'-3" 1.2000 1.2000 0.3500 0.5040
GLC 1.2000 11.3000 0.3500 4.7460
GLC-2 1.2000 3.6250 0.3500 1.5225
GLC-3 1.2000 2.7500 0.3500 1.1550
GLC' 1.2000 1.2000 0.3500
GLD 1.2000 7.2950 0.3500
GLD-2 1.2000 3.6250 0.3500
GLD-3 1.2000 3.6250 0.3500

GLD' 1.2000 1.2000 0.3500

GLE 1.2000 11.3000 0.3500

GLE-2 1.2000 3.6250 0.3500 1.5225

GLE-3 1.2000 2.7500 0.3500 1.1550

GLF 1.2000 7.2950 0.3500 3.0639

GLF-2 1.2000 3.6250 0.3500 1.5225

GLF-3 1.2000 3.6250 0.3500 1.5225

GLE' 1.2000 1.2000 0.3500 0.5040

Wastage Factor Factor 1.0000


Total Volume for 3000 psi 19.5279
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume
Inspected by:

Engr. Eliazar Abes


Project in-Charge
-SantosConstruction Corps. Revolution Precrafted

1 of 2
UTATION CONCRETE THEORETICAL VOLUME
Pouring Date: 18-Jan-19

FCD Dimensions
Design Remarks Structure Location
x
3000 psi Footing GLF' 1.2000
3000 psi Footing GL G 1.2000
3000 psi Footing GLG-2 1.2000
3000 psi Footing GLG-3 1.2000
3000 psi Footing GLH 1.2000
3000 psi Footing GLH-2 1.2000
3000 psi Footing GLH-3 1.2000
3000 psi Footing GLG' 1.2000
3000 psi Footing GLH' 1.2000
3000 psi Footing GLI 1.2000

1.2000

3000 psi Footing GLI'-2


3000 psi Footing GLI'-3 1.2000

3000 psi Footing GLI'-3" 1.2000

3000 psi
3000 psi
3000 psi
3000 psi
3000 psi
Wastage Factor Factor
Total Volume for 3000 psi
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume
Prepared by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.
EORETICAL VOLUME COMPUTATION
Location: Block 9

FCD Dimensions Theoritical Design Remarks


y L/d Volume
1.2000 0.3500 0.504 3000 psi
11.3000 0.3500 4.7460 3001 psi
3.6250 0.3500 1.5225 3002 psi
2.7500 0.3500 1.1550 3003 psi
7.2950 0.3500 3.0639 3004 psi
3.6250 0.3500 1.5225 3005 psi
3.6250 0.3500 1.5225 3006 psi
1.2000 0.3500 0.5040 3007 psi
1.2000 0.3500 0.504 3008 psi
11.3000 0.3500 4.7460 3009 psi

1.9300 0.3500 0.8106

3010 psi
1.9300 0.3500 0.8106 3011 psi
1.2000 0.3500 0.5040 3012 psi

1.0500
si 21.9156
si
si
43.515675
Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted

2of 2
CONCRETE POURING REQUEST

Project : Polygonal Succession


Loacation : Sitio Asis Brgy Kaylaway, Nasugbu Batangas
Owner : Revolution Precrafted-Batulao Artscape
Date : Friday (January 17, 2019)

Type of Structure : Footing-Block 9


Concrete Strength Design : 3000 psi
Total Volume of Concrete : See attached volume computation
Method of Pouring : Ready Mix Concrete
Concrete Slump : 5" to 8"
Projected Pouring Date/Time Started : January 18, 2019/ 1:00 PM
Projected Pouring Date/Time Finished : January 18, 2019/ 3:00 PM
Actual Pouring Date/Date Started : January 18, 2019/ 4:00 PM
Actual Pouring Date/Date Finished : January 18, 2019/ 6:00 PM

Inspected by:
Activity Company Name Contractor's Signature Date
Representative
Line and Grade
Rebars
Structural QA/QC
Formworks
Electrical Works
FDAS/Auxiliary System
Mechanical Works
Sanitary/Plumbing Works
Fire Protection System
Architectural
Landscape
Others

Requested by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.

Inspected by:

Engr. Eliazar Abes


Project in-Charge
Revolution Precrafted
OURING REQUEST

Pouring Date:

Structure

Footing
attached volume computation Footing
dy Mix Concrete Footing
Footing
uary 18, 2019/ 1:00 PM Footing
uary 18, 2019/ 3:00 PM
uary 18, 2019/ 4:00 PM
uary 18, 2019/ 6:00 PM

Inspected by:
Owner's Signature Date REMARKS
Representative

Wastage Factor Factor


Total Volume for 3000 psi
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume

Prepared by:

Engr. Riza Manuel


Project In Charge
Ongpeng-SantosConstruction Corps.
CONCRETE THEORETICAL VOLUME COMPUTATION
18-Jan-19 Location: Block 5

FCD Dimensions Theoritical


Location
x y L/d Volume
GLC' 1.2000 1.2000 0.3500 0.5040
GLD 1.2000 7.2950 0.3500 3.0639
GLD-2 1.2000 3.6250 0.3500 1.5225
GLD-3 1.2000 3.6250 0.3500 1.5225
GLD' 1.2000 1.2000 0.3500 0.5040

Wastage Factor Factor 1.0500


Total Volume for 3000 psi 7.1169
Total Volume for 4000 psi
Total Volume for 5000 psi
Total Volume 7.472745

Inspected by:

Engr. Eliazar Abes


Project in-Charge
-SantosConstruction Corps. Revolution Precrafted

1 of 2
UTATION

Design Remarks

3000 psi
3000 psi
3000 psi
3000 psi
3000 psi

S-ar putea să vă placă și